Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on November 22, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mosquito Stilling Basin Joint Sealing

Closed
W911WN20Q8000Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 15 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 15 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 15 hours ago

DEADLINE

in about 15 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 15 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 20 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Mosquito Creek Dam 2961 Warren Meadville Road, Cortland, OH, 44410, USA

Set-Aside

SBA

Documents

10

Amendment+1+%28Correct%29.docx

DOCX

Amendment+2+%28Correct%29.pdf

PDF

Amendment+2+-+Revisions+to+Plans+%28Correct%29.pdf

PDF

Amendment+2+-+Revisions+to+Specifications+%28Correct%29.pdf

PDF

Davis_Bacon_Wage_Rates_%28Attachment_3%29.pdf

PDF

Drawings_%28Attachment_2%29.pdf

PDF

Pre-Quote_Site_Visit_Agenda_and_Contracting_Discussion.pdf

PDF

Pre-Quote_Site_Visit_Sign-In_Sheet.pdf

PDF

Technical_Specifications_%28Attachment_1%29.pdf

PDF

W911WN20Q8000.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Nov 22, 2019 to Nov 26, 2019. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Pittsburgh
Contacts2 people available
OfficePITTSBURGH, PA, 15222-4198, USA
Office AddressPITTSBURGH, PA, 15222-4198, USA
Contacts
Janie L. RoneyContract Specialist
Matthew W. ReedContract Officer

Full Description

Show more
The Pittsburgh District of the U.S. Army Corps of Engineers has a need for Stilling Basin Joint Sealing at Mosquito Creek Dam, Trumbull County, Ohio. The work will consist of the installation of waterstops and/or injection grouting in concrete monoliths; realignment and extension of a drain pipe into creek past the training wall; construction of a temporary access road; and the removal and replacement of a security fence. Please see attached documents on the Project including the Solicitation, Technical Specifications, Drawings, Price Schedule, and Wage Rates Determination. This is a Request for Quote (RFQ). The NAICS Code for this acquisition is 237990 Other Heavy and Civil Engineering Construction with a size standard of $39.5 M. This requirement is 100% Set-Aside for Small Business concerns. Any resultant contract shall be Firm-Fixed Price and one Award is anticipated. In order to receive notification of any amendments to the solicitation, interested vendors must register as such on the www.fbo.gov website. If you are not registered, the Government is not responsible for providing notification of any changes to the solicitation. Contractors must be actively registered in the System for Award Management (SAM) database at the time of quotes are due (go to www.sam.gov to register). UPDATES 11/20/2019: Due to issues with the migration from www.fbo.gov to beta.sam.gov, USACE cannot upload amendments at this time. The answers to vendor questions are provided below. In addition, the due date for quote submissions will be extended to 5:00PM Eastern Time on 11/26/2019. Q1: Is the non-erodible material contractor laydown area used only for this project? A1: Yes. Q2: Can the Quality Control Manager also be the Site Superintendent/Site Safety Health Officer? A2: The QC Manager and the Superintendent must be separate individuals. The SSHO can also be the superintendent or QC Manager if the contractor chooses, provided they meet the requirements. Q3: Can you clarify the intent of General note 3 on drawing X-101? a) Limiting the access to 5 tons defeats the purpose of stoning a full access pad area. There's no way to efficiently move that stone over the tunnel. You'd, at best, be able to move 2.5 tons at a time. b) We have pickup trucks that exceed the 5 ton weight limit. Also, with that weight, the largest excavator to move over there weighs 10 tons, that's too small to do anything significant. c) The barrier for the water diversion weighs over 6,000 pounds. That leaves 4,000 pounds for a vehicle or equipment to move the barrier. Nothing that small can move the barrier, let alone lift it over the wall. d) Also, with the barrier, we need to reach out over 55' to set that barrier. What piece of equipment can do that? This requires a crane with at least 55' of reach. This will weigh well over 5 tons. A3: a) General Note 3 on sheet X-101 is intended to limit the allowable gross vehicle weight over the outflow tunnel to protect the tunnel from overstress due to live load. The Quoter is responsible for determining the means and methods to perform the required work within the limits of the plans and specifications. The Quoter may need to make multiple trips with light duty vehicles and equipment in order to perform the required work. b) Refer to response 'a'. c. There are no specific contract requirements with respect to material and weight for the water diversion barrier. Sheet X-504 includes two possible methods for constructing the water diversion barrier. d) Refer to response 'c'. Q4: Do you have any additional details of the step going into the stilling basin? This will be crucial in geometry, as you are using concrete barrier to cross the step and maintain a watertight seal. A4: Drawing 035bb-U1-61/1, provided as a reference drawing at the end of the project Plans, gives the best available detail on this area. Specifically, reference 'Section F-F' and 'Profile on Center Line' on the drawing. Q5: Drawing S-101 calls out different joint seal details at various locations along the training walls. The Quoter is concerned that the PVC Waterstop detail may not yield satisfactory results due to the 6" wide PVC waterstop being encapsulated in non-shrink grout, with no direct engagement to the existing concrete -- it is possible that after several seasons, the water will flow around the perimeter of the non-shrink grout plug, bypassing the new waterstop. Would the Government accept the application of the Foam Grout Waterstop as detailed on S-302 at all joint locations in lieu of the PVC Waterstop? A5: The Quoter's concern has been noted; however, substitution of the foam grout waterstops for PVC waterstops is not permitted. The Quoter should proceed with the details as shown in the contract plans. Q6: Are there any existing utilities (electrical, intake pipes, etc.) in the vicinity of the new Storm Culvert Extension shown on C-402? Please provide reference drawings, if available. A6: USACE is not aware of any existing utilities in the vicinity of the new storm culvert. 11/21/2019 W911WN20Q8000 0001 and 0002 have been posted along with revisions to Specifications and Plans.

More opportunities from Department Of Defense → W072 Endist Pittsburgh

Same awarding agency

NAICS: 238160
New
Federal
Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement
Solicitation # W911WN26QA062
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting quotes for the complete replacement of the standing seam metal roof on the Control Tower Building at Mosquito Creek Lake in Cortland, Ohio. This non-commercial construction project is a 100 percent Small Business Set-Aside under NAICS 238160, with an estimated value between $150,000.00 and $350,000.00. The scope of work includes the demolition and disposal of existing roof panels, box gutters, scuppers, and the lightning protection system, as well as the installation of a new gutter system and a certified, non-penetrating Lightning Protection System. Additional requirements include rerouting vent and exhaust pipes through the masonry side wall and refurbishing up to 95 linear feet of cold-formed metal sub-framing that exhibits significant corrosion or deformation. The project will be awarded as a single Firm-Fixed Price contract based on best value, evaluating both price and past performance. The performance period is 365 calendar days from the written Notice to Proceed, with work hours restricted to Monday through Friday, 7:00 AM to 4:00 PM. Contractors must adhere to strict quality and safety standards, including EM 385-1-1, UL 2218 Class 4 impact resistance, and Davis-Bacon Act wage determinations for Trumbull County, Ohio. Required submissions include a Quality Control Plan and documented credentials for key personnel. Performance and payment bonds totaling 100 percent of the contract price are required upon award.
Roofing Contractors

POSTED

5 days ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
Federal
JP Murtha Float Mooring Bitts Retrofit
Solicitation # W911WN27BA001
The United States Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price construction contract for the John P. Murtha Floating Mooring Bitts Retrofit. This project involves complex in-the-wet construction within an active navigation lock, requiring the design, fabrication, and installation of two dewatering boxes and the installation of Government-furnished floating mooring bitts into contractor-fabricated embedded frames on the river chamber middle wall. The scope includes heavy demolition, concrete wire-sawing, core drilling, and the use of certified commercial dive teams for underwater inspection and cofferdam sealing. The contractor must provide and operate a compliant floating plant, including a crane/deck barge and push boat, in accordance with EM 385-1-1. The work is to be completed within 730 calendar days after the notice to proceed. This is an unrestricted full and open solicitation under NAICS code 237990, with a small business size standard of 45 million dollars. Award will be granted to the lowest responsive and responsible offeror, with a 10 percent price evaluation preference provided to HUBZone certified firms. Bidders must maintain active registrations in the System for Award Management and the Procurement Integrated Enterprise Environment, as all responses must be submitted electronically via PIEE. The contract requires performance and payment bonds, adherence to the Davis-Bacon Act under wage determination PA20260002, and the execution of partnering sessions between the contractor and government personnel. Final acceptance is contingent upon a pre-final inspection and a formal final acceptance inspection to ensure the facility is returned to a condition equal to or better than its original state.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS