Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Mossbrae Springs Improvements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mossbrae Springs Improvements Project, managed by the City of Dunsmuir, focuses on priority water supply enhancements identified in the City's 2015 Master Water Plan. The project is located within and north of the City of Dunsmuir, California, spanning city-owned and private properties. The scope is divided into two primary phases. Phase 1 focuses on emergency chlorination, including the installation of new equipment and a chlorination vault, SCADA system updates at the North Dunsmuir Tank involving antenna and control panel modifications, and the addition of gravel fill along access pathways. Phase 2 involves comprehensive infrastructure improvements at the springs, including replacing parallel 12-inch steel water pipes with a single 18-inch steel pipe, installing isolation valves, sample taps, and overflow lines, and replacing steel doors on specific tunnels. Additionally, this phase includes the demolition of the weir building to be replaced by a concrete retaining wall and a vault for flowmeters and piping, the construction of new concrete boxes around five existing spring boxes, and further gravel fill for access paths. The project is categorized as exempt under California CEQA Guidelines Class 1 and Class 2 as it involves minor alterations and replacements without expanding capacity. Dustin Rief, the City Manager, serves as the primary point of contact.

General Info

Dunsmuir upgrades water system with chlorination, piping, and structural improvements on city land under CEQA exemptions.

Agency

California → City of Dunsmuir

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Dunsmuir Ave, Siskiyou Ave, Dunsmuir, CA, 96025

Set-Aside

NONE

Documents

(1)

REVISED NOE - Mossbrae Springs Improvements 2025

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Dunsmuir
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Dunsmuir
Office AddressN/A
Contacts

Full Description

Show more
The proposed project addresses priority improvements identified in the City’s 2015 Master Water Plan. The City’s water supply is provided through the diversion of a few of the 16 springs that are collectively known as Mossbrae Springs. The remaining springs form Mossbrae Falls, which is directly tributary to the Sacramento River. Water from the springs is of excellent quality and requires no long-term treatment or chlorination at this time; however, emergency chlorination facilities are available adjacent to the spring headworks. The original project included miscellaneous improvements to the City’s water collection system at Mossbrae Springs. In addition, the original project included a new permanent emergency chlorination system located at the Castle Rock Water Bottling facility (APN 059-010-190). The revised project includes the following proposed improvements at the Springs under a two phases. The chlorination system at the Castle Rock Water Bottling facility would not be installed. Phase 1 – Mossbrae Springs Emergency Chlorination • Installation of new emergency chlorination equipment within the existing building and construction of a new chlorination vault on an existing steel water main located at the Springs site. SCADA system improvements would be completed on the existing North Dunsmuir Tank and within the existing emergency chlorination building. • Addition of 4-inch thick gravel fill along the access pathway. In addition to the improvements at the Springs, the project includes updates to the existing SCADA system at the North Dunsmuir Tank, including replacement of the existing antenna and modifications to the existing control panel. Phase 2 – Mossbrae Springs Improvements • Removal and replacement of the existing parallel 12-inch steel water pipes with a single 18-inch steel pipe in the same alignment; • Installation of isolation valves, sample taps, and overflow lines to the existing drainage for each spring; • Replacement of the steel doors on Tunnel 1 and 2 of Spring 2; • Demolition and replacement of the weir building with a concrete retaining wall and a vault containing flowmeters and piping to maintain the existing hydraulics. Existing culverts would be replaced and a new drain box would be installed adjacent to the vault. • Construction of a new concrete box around each of the five existing spring boxes. Holes would be cut through the existing stream boxes to connect the steel pipe replacements. • Addition of 4-inch thick gravel fill along the access pathway.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 7 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 7 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins measuring 54 and 145.5 inches. Additional infrastructure requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and piping systems. The project requires specialized civil works, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. James W. Fowler Co. is actively encouraging M/W/DBE participation and offers assistance with bonding, insurance, and lines of credit to eligible subcontractors. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS