Mount Veeder Road MPM 4.3 and 3.25 Slide Repair Project RDS26-24

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Napa County

NAICS

N/A

Place of Performance

Mount Veeder and Lakoya Road, Yountville, CA, 94558

Set-Aside

NONE

Documents

(1)

Mount Veeder Road MPM 4

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Napa County
Office AddressN/A
Contacts
Dana Eleanor MorrisonSupervising Planner - Conservation
Dewey PhanAssistant Engineer

Full Description

Show more
Mount Veeder Road near mile post marker (MPM) 4.3 sustained roadway failure when a portion of the road slid down the hillside, threatening the remaining portions of the road. To ensure the future stability of the road and provide for public safety, the County of Napa (County) is proposing to repair the damage by restoring the road and installing a retaining wall. The slide repair will include installing a retaining wall and restoring the damaged section of Mt. Veeder Road. The retaining wall will be a 14-foot-high, 184-foot-long concrete wall supported on drilled piers with tiebacks to allow for the travel lane to remain open during construction and provide additional lateral support to reduce drilled pier depths. A shotcrete facing will also be applied as part of the shoring system during construction to stabilize the excavation and maintain one open lane. To ensure the high wall will adequately carry the load, one row of permanent tiebacks will be installed 6 feet below ground. To restore the asphalt surface and pre-slide drainage patterns at the roadway surface, backfill will be added and the roadway will be repaved. Best Management Practices and erosion control will be implemented, as well as environmental commitments to protect environmental resources, including any potential special-status species or cultural resources that may occur in the project area.