Mount Veeder Road MPM 5.25 and 5.43 Slide Repair Project

Forecast
RDS26-24State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of Napa is undertaking repairs to Mount Veeder Road near mile post marker 4.3 following a significant hillside slide that compromised the roadway’s structural integrity and posed a safety risk. The project involves constructing a 14-foot-high, 184-foot-long concrete retaining wall supported by drilled piers and permanent tiebacks installed 6 feet below grade to ensure long-term stability while allowing one travel lane to remain open during construction. A shotcrete facing will be applied to stabilize the excavation and support the shoring system. The damaged section of the road will be restored with backfill and repaved to reestablish original drainage patterns and the asphalt surface. Environmental protections are a key component, including implementation of Best Management Practices and erosion control measures to safeguard local habitat, potential special-status species, and any cultural resources within the project area. The project is designated under RDS26-24 and is being managed by Napa County with primary contact for planning and engineering inquiries provided.

General Info

Napa County repairs Mount Veeder Road with retaining wall, tiebacks, shotcrete, and repaving while protecting environment and maintaining one lane.

Agency

California → Napa County

Place of Performance

Mount Veeder Road and Mount Veeder School Road, Napa, CA, 94558

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Napa County
Office AddressN/A
Contacts
Dana Eleanor MorrisonSupervising Planner - Conservation
Dewey PhanAssistant Engineer

Full Description

Show more
Mount Veeder Road near mile post marker (MPM) 4.3 sustained roadway failure when a portion of the road slid down the hillside, threatening the remaining portions of the road. To ensure the future stability of the road and provide for public safety, the County of Napa (County) is proposing to repair the damage by restoring the road and installing a retaining wall. The slide repair will include installing a retaining wall and restoring the damaged section of Mt. Veeder Road. The retaining wall will be a 14-foot-high, 184-foot-long concrete wall supported on drilled piers with tiebacks to allow for the travel lane to remain open during construction and provide additional lateral support to reduce drilled pier depths. A shotcrete facing will also be applied as part of the shoring system during construction to stabilize the excavation and maintain one open lane. To ensure the high wall will adequately carry the load, one row of permanent tiebacks will be installed 6 feet below ground. To restore the asphalt surface and pre-slide drainage patterns at the roadway surface, backfill will be added and the roadway will be repaved. Best Management Practices and erosion control will be implemented, as well as environmental commitments to protect environmental resources, including any potential special-status species or cultural resources that may occur in the project area. PROJECT NUMBER: RDS26-24

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. The project is located in California and encompasses a broad range of civil infrastructure and site work. Key scopes of work include underground utilities such as tunneling, boring, jacking, micro tunneling, and cathodic protection; site preparation involving land surveying, site clearing, shoring, and subsurface investigation; and surface improvements including asphalt paving, traffic signals, lighting, and landscaping. Required materials include ready mix supply, precast concrete, manhole materials, and valves. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Additionally, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected electronic system. The deadline for bid submission is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

34 minutes ago

DEADLINE

in 9 days
View Details
NAICS: 237310
New
SLED
KTA 8297
Solicitation # 8297
KTA Contract 8297, managed by the Kansas Turnpike Authority, involves the installation of an Ultrathin Bonded Asphalt Surfacing (UBAS) overlay on I-35, including interchanges, from mile marker 112 to 132 in Lyon County. The scope of work encompasses UBAS, commercial grade asphalt patching and surfacing, patching of the I-35 mainline, and the milling and inlaying of the outside shoulder. Key deliverables include the installation of specific pavement markings, such as 12-inch white chevron lines and 6-inch yellow edge lines, and the implementation of comprehensive work zone traffic control. Performance is scheduled in phases, with asphalt patching and commercial grade paving starting no earlier than April 12, 2027, and UBAS and remaining work commencing after May 31, 2027. The contract will be awarded to the lowest responsible bidder based on the summation of unit prices multiplied by approximate quantities. Bidders must provide a statement of financial condition unless pre-qualified by the Kansas Department of Transportation or the Authority, and must submit a bid bond of 5 percent of the bid. The contractor is required to provide certificates of insurance for Workers' Compensation, Employer's Liability, and Comprehensive Public Liability and Property Damage Insurance. All work must adhere to the 2015 Standard Specifications for State Road and Bridge Construction and KDOT Construction Manual standards, with strict prohibitions against making turnarounds through the barrier wall.
Kansas Turnpike Authority

POSTED

about 24 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237310
New
SLED
KTA 8289
Solicitation # 8289
The Kansas Turnpike Authority solicitation 8289 is for a roadwork project on I-335 in Shawnee County, spanning from mile marker 183.5 to 194.5. The scope of work includes pavement patching, the application of Type A Ultrathin Bonded Asphalt Surface (UBAS) on eastbound and westbound mainline lanes, and a 2-inch cold mill and 2-inch inlay on the shoulders. The contractor is also responsible for installing all mainline permanent pavement markings. All work must adhere to the 2015 Edition of the Standard Specifications for State Road and Bridge Construction published by the Kansas Department of Transportation, with specific asphalt mix requirements of SM-12.5A or SR-12.5A and binder grades of PG 64-28 and PG 70-28. The project is scheduled to begin no earlier than March 15, 2027, with a final completion date for minor clean-up work of November 19, 2027. Quality control and testing must be performed by an independent laboratory approved by the Director of Engineering, while the Authority handles batch plant inspection. Financial terms include a 5% retainage from the total work completed until contract and bond provisions are met. The contractor must maintain specific insurance coverages, including 1 million dollars for general and automobile liability and statutory worker's compensation. Strict safety protocols are in place, including a prohibition on turnarounds through barrier walls; violations will result in immediate work suspension without extensions to completion deadlines. The Kansas Turnpike Authority is tax-exempt under K.S.A. 79-3606(d).
Kansas Turnpike Authority

POSTED

about 24 hours ago

DEADLINE

in 2 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS