Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Vermont was posted on March 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mountain School Dam Removal and Culvert Replacement

Closed
73418State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves the removal of an existing 45-foot long, 7.5-foot corrugated metal pipe arch, along with associated concrete structures including a 50-foot headwall, a 17-foot spillway, and a stop log structure located along Mountain School Road. The project includes realignment of the stream and the construction of a new aluminum multi-plate pipe arch measuring 20 feet in span, 10 feet in height, and 45 feet in length, complete with new headwalls and wingwalls. Additional work includes the installation of channel bed materials, bank rock, log vanes and sills, buried grade controls, and efforts to restore the natural flow regime of the Cold River. Issued by the Vermont Department of Economic Development, this solicitation was posted on March 3, 2026, with a response deadline of April 30, 2026. The work will be performed in Vermont, and the point of contact for inquiries is available via email and phone. The contract represents a comprehensive infrastructure and environmental restoration effort aimed at improving stream function and stability along Mountain School Road.

General Info

Removal and replacement of metal pipe arch, stream realignment, and environmental restoration in Vermont.

Documents

1
PDF, High priority: read this firstnotice-and-instructions-to-bidders
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 10 days
  • Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 20 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
Contacts1 person available
OfficeVT, USA

Full Description

Show more
The project includes removal of the existing 45' long, 7.5’ corrugated metal pipe arch, 50' concrete headwall, 17' concrete spillway and stop log structure along Mountain School Road, stream realignment, construction of a 20' span, 10' tall, and 45' long aluminum multi-plate pipe arch, headwalls, and wingwalls, installation of channel bed material, bank rock, log vanes and sills, and buried grade controls, and restoration of natural flow regime to the Cold River.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 423310
New
SLED
Supply and Delivery of Firewood to NW (Region 3) Vermont State Parks
Solicitation # 77321
The State of Vermont Department of Economic Development is soliciting bids for the supply and delivery of kiln-dried firewood to various state parks in the Northwest Region for the 2027 operating season. The contract is expected to run from April 1, 2027, to April 1, 2028, with an option to extend for two additional 12-month terms upon mutual agreement. The primary goal is to provide a reliable and affordable firewood source to deter visitors from cutting park trees or transporting invasive species, specifically targeting the prevention of the emerald ash borer. Deliveries must be made within seven calendar days of a request and placed as close to the park woodshed as possible. Special logistics are required for Burton Island State Park, necessitating coordination with a landing craft operator and the use of a 4-cord single-axle delivery truck. Firewood specifications require a moisture content not exceeding 25%, a uniform mix of 85% hardwood and 15% softwood, and a maximum length of 16 inches. Wood sourced from outside Vermont must be heat treated to a minimum core temperature of 160°F for at least 75 minutes and accompanied by a certification document. Invoicing is permitted no more frequently than once per month, with payments made on a per cord per delivery basis. The contract is subject to standard state provisions, including strict cybersecurity standards, ADA compliance, and the availability of state appropriations. There is no set-aside status for this solicitation.
Lumber, Plywood, Millwork, and Wood Panel Merchant Wholesalers

POSTED

about 11 hours ago

DEADLINE

in 17 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS