This Pre-Solicitation opportunity from Department Of Defense was posted on June 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mouth of the Columbia River (MCR) North Jetty Repair Project Phase 2

Closed
PAN25P04540Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter; structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and painting; and specialized electrical and piping installations. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of September 17, 2026. The project is partially funded by the Water Infrastructure Finance and Innovation Act administered by the EPA, making it subject to the American Iron and Steel provisions, Davis-Bacon Related Acts, and DBE Program requirements. Eligible bidders include DBE, SBE, MBE, WBE, SBRA, LSFA, and HUB Zone small businesses, with DBEs required to provide valid certification from recognized bodies such as the US EPA or SBA. Qualified respondents must hold a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the premiums.
Kiewit Infrastructure West Co.

POSTED

about 12 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and comprehensive revetment repairs involving clearing, grubbing, stone rework, and vegetation removal. The estimated contract value ranges between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a 10 percent price evaluation preference. Bidders must submit sealed physical bids by September 30, 2026, as electronic submissions are not permitted. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. The contract stipulates liquidated damages of 2,297 dollars per calendar day of delay and requires a third-party qualified surveyor for pre- and post-dredge multi-beam hydrographic surveys to verify final quantities.
Healy Tibbitts Builders, Inc.

POSTED

about 12 hours ago

DEADLINE

in 17 days
NAICS: 237990
New
Federal
Station Umpqua River Floating Dock Repair
Solicitation # 70Z03326QSEAT0015
The Department of Homeland Security, through the U.S. Coast Guard Base Seattle, is soliciting bids for a firm-fixed-price contract to repair the floating pier at Station Umpqua River in Winchester Bay, Oregon. The project involves providing all personnel, equipment, and tools to remove deteriorated wooden whalers and hardware and install three layers of 4 by 12 inch wooden whalers, through rods, roller hoops, and an egress ladder, while reinstalling ten existing cleats. The estimated period of performance is from September 21, 2026, to October 22, 2026, with a required completion date of October 14, 2026. This is a total small business set-aside under NAICS code 237990. A mandatory site visit is scheduled for August 27, 2026, at 10:00 AM, and interested offerors must submit their attendee lists by August 26, 2026. Proposals are due by September 14, 2026, at 3:00 PM PST and must be submitted via email to the contracting officer. Submissions are limited to six pages and must include a completed SF 1442, a detailed price breakdown covering mobilization, materials, and labor, and a technical proposal detailing the approach and project schedule. Evaluation will be based on technical capability, past performance, and price, with technical capability being the most significant factor. Awardees must be registered in the System for Award Management and comply with Davis-Bacon Act wage determinations for Douglas County, Oregon.
Base SEATTLE(00033)

POSTED

1 day ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers Portland District is preparing to solicit a firm-fixed-price contract for Phase 2 of the Mouth of the Columbia River North Jetty Repair Project, located near Ilwaco, Washington. The project focuses on repairing and reconstructing approximately 2,300 feet of the jetty trunk on both the ocean and channel sides, targeting areas above 0 feet NAVD88 elevation. Work will include restoring the crest to a 30-foot width (transitioning to 40 feet at the oceanward end), adjusting side slopes to 1V:1.5H (transitioning to 1V:2H at the oceanward end), and maintaining a crest elevation of +25 feet NAVD88. The scope requires placing an estimated 17,000 cubic yards of armor stone with densities between 175 and 180 pounds per cubic foot, composed of individual stones weighing 15 to 40 tons each. Construction will involve both reworking existing stone for improved interlock and replacing it with new stone where necessary. A haul road and staging area must be built to support logistics, and all work must occur during the favorable season between May and October due to hazardous marine conditions outside this window. Optional work includes additional repairs to 1,000 feet of jetty trunk and 300 feet of the jetty head, requiring an additional 8,500 cubic yards of stone. Construction is anticipated to begin in 2027 with a potential extension into 2028, aiming for completion by the end of calendar year 2028. The government plans to issue the solicitation in July 2026 and award the contract in September 2026 through a full and open competition via Invitation for Bid, with proposals submitted through SAM.gov. The estimated cost ranges between $25 million and $100 million. Contractors must be registered in SAM.gov prior to bidding and must meet CMMC Level 1 cybersecurity requirements for systems handling federal contract information. Plans and specifications will be available on beta.SAM.gov upon solicitation release, and no pre-solicitation bids or costs will be reimbursed. This notice serves only to inform industry of upcoming opportunities and is not a solicitation itself.

General Info

U.S. Army Corps of Engineers to repair 2,300 feet of jetty near Ilwaco, WA, with 17,000 cy of armor stone, 2027–2028 construction.

Agency

Department Of Defense → W071 Endist PortlandView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Ilwaco, WA, 98624, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Amendment 1

Contract was updated

Type Changed

Sources Sought → Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Portland
Contacts2 people available
OfficePORTLAND, OR, 97204-3495, USA
Organization / Agency
Department Of Defense → W071 Endist Portland
View Agency Profile
Office AddressPORTLAND, OR, 97204-3495, USA
Contacts
Justin Figueredo

Full Description

Show more

The U.S. Army Corps of Engineer (USACE) Portland District intends to solicit construction firms who are interested in submitting a competitive firm-fixed-price proposal for this project. This PRESOLICITATION announcement is for the Mouth of the Columbia River (MCR) North Jetty Repair Project Phase 2.


 Project Details and Background.


The MCR federal navigation project is situated at the border between Washington and Oregon, where the Columbia River meets the Pacific Ocean. Deep-draft navigation through the MCR is facilitated by three primary navigation structures—North Jetty, South Jetty, and Jetty A—with a combined authorized length of 10.2 miles. The North Jetty has an authorized length of 2.5 miles extending to Station 130+00; however, it has not been constructed to its full authorized length. The initial construction of the North Jetty concluded at approximately Station 122+00, resulting in a constructed length of approximately 2.3 miles. This jetty was the second of the three to be constructed and was completed in 1917. Subsequent repairs and rehabilitations along various sections of the North Jetty were carried out in 1939, 1965, 2005, 2015, and 2019. Both initial construction and repairs utilized stone with a minimum density ranging from 167 to 180 pounds per cubic foot (pcf). The side slopes of the jetty vary between 1:1.25 and 1:2 (vertical: horizontal), with an average crest elevation of 25 ft msl. Since construction, a total of 3,569,030 tons of armor stone have been placed.


Project Scope.


The Mouth of the Columbia River (MCR) North Jetty is located at the southwest corner of Washington State near Ilwaco, WA. Access to the North Jetty is via US Highway 101, N Head Rd, Fort Canby Road, Jetty Road through Cape Disappointment State Park. Mandatory work for MCR North Jetty Major Maintenance – Phase II includes toe, side slope, and crest repair and reconstruction primarily above 0 feet NAVD88 elevation along approximately 2,300 feet of the jetty trunk on both the ocean and channel side. These sections will be repaired and reconstructed to a design crest width of 30 feet (with a crest transition to 40 feet at the oceanward end of the reach), side slopes of 1V:1.5H (with a side slope transition to 1V:2H at the oceanward end of the reach) and a crest elevation of +25 feet NAVD88.  The estimated stone volume required for the repairs is approximately 17,000 cubic yards with an approximate minimum stone densities of 175 to 180 pounds per cubic foot. Expected stone size is between 15-40 tons each, with varying gradations along the reach. A jetty crest haul road on top of the jetty must be constructed and staging area developed to store the large quantity of jetty armor stone.  Stone production and delivery via land-based methods to the north jetty site and stone placement are expected to occur in calendar year 2027, and potentially 2028, if necessary. Major Maintenance will primarily be completed by two methods, 1) standard repair, which requires re-working adjacent relic stone to facilitate the proper placement and interlock of new stone, and by 2) reconstruction, which requires the contractor to recycle existing competent jetty armor stone by rearranging it to provide a more consolidated, well-interlocked armor layer. The Government anticipates that reconstruction will contribute to a need for some additional armor stone as the existing jetty volume will be consolidated through the reconstruction effort. Therefore, reconstruction will also include the placement of new jetty armor stone. The Contractor should not expect to place jetty armor stone outside of the favorable work season between the months of November and April. Marine weather and oceanographic conditions at The Mouth of the Columbia River between November and April, and even occasionally through the favorable work season, can be extremely dangerous and the coastal environment (waves, wind, rain) is generally too dangerous for conducting marine construction activities such as stone placement at exposed locations such as the jetty trunk and head. 


Optional work includes major maintenance of 1,000 feet of jetty trunk with a crest width of 30 feet, side slopes of 1V:1.5H, and a crest elevation of +25 feet NAVD88.  Another portion of Optional work will include major maintenance of the jetty head with a reach length of 300 feet. The Jetty head has a crest width of 40 feet at +25 feet NAVD88, side slopes of 1V:2H, a toe berm with an 18-foot-wide bench at +6.5 feet NAVD88. Estimated stone volume for the optional work is 8500 cubic yards with a minimum stone density ranging from 175 to180 pounds per cubic foot, with stone size between 15-40 tons each.


Anticipated Construction Schedule:  CENWP intends to advertise in July 2026 and award in September 2026 with estimated construction completion by the end of calendar year 2028.


Estimated Construction Cost (ECC):  The current ECC is between $25,000,000.00 and $100,000,000.00.


Number and Type of Contracts: NWP contemplates awarding one (1), Firm Fixed-Price contract..


Anticipated Source Selection Process:  The expected method to determine the best value to the government is a full and open competition via Invitation for Bid. 


Bid Procedures: The solicitation will be posted on SAM.GOV website once it is issued.


Plans and Specifications: The Plans and Specifications will also be posted on beta.SAM.gov website once it is issued.


System for Award Management (SAM): Offerors must register in the SAM at: https://www.sam.gov/portal/public/SAM/ prior to submission of bids and prior to receiving an award.


Cybersecurity Maturity Model Certification (CMMC) level: The CMMC level anticipated for this requirement is CMMC Level 1 (Self). This CMMC level, or higher (see 32 CFR part 170), will be required prior to award and maintained for the duration of the contract for each contractor information system that will process, store, or transmit Federal contract information (FCI) or controlled unclassified information (CUI) during performance of the contract.


THIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON SAM.GOV IN JULY 2026. THIS NOTICE IS NOT AN INVITATION FOR BIDS, AND ANY BIDS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED.


THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.

More opportunities from Department Of Defense → W071 Endist Portland

Same awarding agency

NAICS: 333914
New
Federal
LOP Fire Protection and Unwatering Pump System
Solicitation # W9127N26QA155
Solicitation W9127N26QA155 is a total small business set-aside for the procurement of a fire protection and unwatering pump system for the Lookout Point Powerhouse in Lane County, Oregon. Issued by the Department of Defense W071 Endist Portland, this firm-fixed-price requirement is necessitated by a deep reservoir drawdown that would otherwise disable critical service water and fire protection systems. The scope of work includes the delivery of a 650 GPM vertical pump/motor assembly, a 0.25 HP jockey pump system, a fire pump controller panel, overload protection, and various piping and fitting components. All equipment must meet AWWA E103 and HI 9.1-9.5 standards, with a delivery deadline of March 1, 2027, shipped FOB destination to Lowell, Oregon. The government will award a single purchase order based on an evaluation of technical compliance, past performance, and price, utilizing the HUBZone price evaluation preference. Offerors must be registered in the System for Award Management under NAICS code 333914 and submit a complete quote package via email to the designated point of contact. The solicitation underwent two amendments, with the final response deadline extended to September 11, 2026. Key contractual requirements include compliance with MIL-STD-129 for marking, DFARS cybersecurity and telecommunications regulations, and specific pump acceptance criteria according to HI ANSI/HI 14.6 grade 2B.
Measuring, Dispensing, and Other Pumping Equipment Manufacturing

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 334513
New
Federal
Lookout Point DGA supply and incidental install
Solicitation # W9127N26QA160
Solicitation W9127N26QA160 is a total small business set-aside for the purchase and installation of three online Dissolved Gas Analysis (DGA) monitoring systems for the main unit generator step-up transformers at the Lookout Point Powerplant in Jacksonville, Oregon. The contract is a firm-fixed-price award under NAICS code 334513, with the government evaluating quotes based on technical compliance, past performance, and price. The scope of work includes the delivery of the DGA monitors, incidental installation, necessary installation supplies, and eight hours of onsite training conducted by a manufacturer-approved instructor. The systems must be capable of measuring total dissolved combustible gas, total hydrocarbon, oil temperature, moisture-in-oil, ambient temperature, and nine specific gases, while supporting Modbus RTU and DNP3 protocols with RS-232, RS-485, and Ethernet interfaces. Key deliverables include a PC-based software package for remote data analysis and operation and maintenance manuals in both hardcopy and PDF formats. The contractor must provide an onsite field engineer or technician to lead installation, functional testing, and system verification, which must be coordinated with the Contracting Officer at least 14 days in advance. All items and services must be delivered FOB destination by March 1, 2027, with shipments restricted to normal business hours from Monday through Thursday. Additionally, the contractor must comply with specific security requirements, including OPSEC Level I and CUI training for personnel, and adhere to DFARS regulations regarding cybersecurity and the prohibition of covered defense telecommunications equipment.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

2 days ago

DEADLINE

in 9 days
View Details
NAICS: 238220
New
Federal
John Day Dam Powerhouse HVAC Upgrades
Solicitation # W9127N26BA006
The U.S. Army Corps of Engineers Portland District is seeking a single firm-fixed-price contract for comprehensive HVAC upgrades at the John Day Dam Powerhouse, located across Oregon and Washington. The project involves replacing primary and secondary chillers, installing four new chiller skid packages with approximately 600 tons of refrigeration capacity, and implementing a new automated digital HVAC control system. Key technical requirements include a mix of water-cooled and air-cooled systems, new intake and exhaust ducting for fire smoke propagation prevention, and the installation of mini-split units. The work must be performed within an active powerhouse containing high-voltage electrical equipment and areas prone to water intrusion, with a construction period of 1,004 calendar days. The estimated project magnitude is between 25 million and 100 million dollars under NAICS code 238220. A critical condition for award is compliance with Cybersecurity Maturity Model Certification, specifically CMMC Level 2 (Self) for the prime contractor and appropriate levels for subcontractors based on the type of information processed. The solicitation is expected to be issued as an Invitation for Bids in mid-September 2026, requiring bidders to have an active SAM registration and a current NIST SP 800-171 assessment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 333415
New
Federal
Lookout Point Powerhouse Drawdown Transformer Cooling Water Supply
Solicitation # W9127N26QA125
Solicitation W9127N26QA125 is a total small business set-aside for the procurement of a new, FOB destination refrigerated closed-loop water chilling system for the Lookout Point Powerhouse in Lowell, Oregon. The system is required to maintain critical transformer cooling and fire protection during a scheduled reservoir drawdown from October to February that disables the facility's service water. The technical requirements specify a 20-ton (75 kW) system capable of circulating water at 120 gpm and maintaining a maximum cooled water temperature of 80 degrees Fahrenheit in ambient temperatures ranging from -20 to 120 degrees Fahrenheit. Key components include a 3 hp circulating pump, a maintenance tank of at least 100 to 200 gallons depending on configuration, and IP65 rated controls and sensors. The entire system must fit within a 20 by 14 foot horizontal area and include anchor points for concrete seismic anchorage. The contract is managed by the Department of Defense, specifically the Army Corps of Engineers Portland District. All equipment must be standard commercial cataloged products, and the successful contractor is required to provide one hardcopy and one electronic operation and maintenance manual. Delivery is required on or before March 1, 2027, with shipments restricted to Monday through Thursday between 7 am and 3 pm Pacific Time. Evaluation for award is based on technical compliance and past performance. The procurement incorporates various FAR and DFARS clauses, including requirements for System for Award Management registration, Buy American certifications, and specific military standards for marking and labeling such as MIL-STD-130 and MIL-STD-129. Invoicing and reporting must be conducted through the Wide Area WorkFlow system.
Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

POSTED

3 days ago

DEADLINE

in 3 days
View Details
NAICS: 237310
New
Federal
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
Solicitation # W9127N26BA024
Solicitation W9127N26BA024 is a total small business set-aside for the replacement of the Navigation Lock 1 Bridge at the Bonneville Lock and Dam in Cascade Locks, Oregon. The project involves replacing the existing bridge with a new single-span steel girder bridge featuring a concrete deck, two travel lanes, and a sidewalk. The scope includes partial demolition of the existing bridge, construction of approach roadways, and the installation of a concrete stub abutment anchored into rock and a concrete abutment supported by drilled shafts. Due to the requirement that vehicular access remain open throughout construction, the project will likely be executed in phases. Additional technical requirements include lead and asbestos removal, working within environmental and seasonal restrictions, and performing barge crane lifting near high-voltage power lines. The procurement is managed by the USACE Portland District, with a project magnitude estimated between 10 million and 25 million dollars. Following several amendments, the solicitation closing date was extended to October 8, 2026. Bids must be submitted electronically in PDF format to the designated points of contact, as hard copies will not be accepted. Site visit attendees must be U.S. citizens and possess a Real ID for access. The contract includes specific regulatory requirements, such as the use of a professional archaeological monitor during ground disturbance and strict adherence to employment eligibility verification via Form I-9. Foreign contracting parties are subject to a 2 percent Federal excise tax withholding unless specific IRS documentation is provided.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 26 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS