This Solicitation opportunity from Texas was posted on November 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Move Dump Station at Bonham State Park, Fannin County, Texas (Project MR11973)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves relocating and constructing a new dump station at Bonham State Park in Fannin County, Texas, under project number MR11973. The Texas Parks and Wildlife Department is seeking bids from qualified contractors to perform site excavation, foundation work, piping, and utility connections, with the goal of replacing the existing dump station, which will be abandoned in place. The scope includes installing a stabilized concrete foundation, connecting to existing wastewater force mains and gravity drains, and ensuring all work complies with local, state, and federal environmental and safety regulations. The project schedule has been extended through an addendum, setting a performance period of 120 calendar days with a preferred completion date of March 6, 2026, and work must be coordinated carefully to minimize facility downtime. The project documents specify that existing equipment such as the lift station and stainless steel chain will remain in place, while the existing dump station will be decommissioned on-site. Bids are due electronically by December 12, 2025, with submissions to be sent via email to the designated Contract Manager, Anthony Habermann, and copied to the infrastructure contracting team. The procurement process emphasizes adherence to the revised drawings and specifications, including updates to project drawings G1, C1, and C3, which detail site layout, signage, and subgrade requirements. The contract does not specify formal FAR clauses or detailed evaluation criteria, but it outlines general requirements for bid submission, insurance, bonding, and compliance with applicable standards. The contractor must verify all critical dimensions in the field, coordinate scheduling with park staff, and ensure proper disposal of construction waste. The project’s key deliverables include a fully operational dump station integrated with existing utilities, with all work completed within the specified performance window. Overall, this contract offers an opportunity for experienced infrastructure contractors to contribute to park improvements through a well-defined scope of work, with emphasis on safety, environmental compliance, and schedule adherence.
General Info
Place of Performance
Set-Aside
Documents
2AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 6 days
- Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 16 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Organization & Contact Information
Full Description
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
