Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Kansas was posted on September 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MS-2198012 24th Street Storm Sewer Replacement - 1200 block

Closed
CIFB-2500081State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
26-037-CIP
Solicitation # 26-037-CIP
The City of Dublin, Ohio, is soliciting bids for the SportsOhio PowerPlay Demolition project, located at 6314 Cosgray Road. The scope of work involves the demolition and restoration of the Can-Am/go cart track, batting cages, concrete seating pads, and mini golf course, along with associated hardscapes. Key activities include the removal and disposal of bridges, culverts, foundations, and engineered stream channels, as well as unclassified excavation, site grading for drainage, and the abandonment of private site utilities. The project has an engineer's estimate of 259,606.50 dollars and a final completion deadline of April 30, 2027, with a specific requirement that tree clearing occur between October 1 and March 31. The contract will be awarded based on a lowest and best analysis, evaluating bidders on financial stability, litigation history, and a minimum of five years of experience in relevant activities such as concrete removal and structure demolition. Bidders must submit their proposals electronically via Bid Express and provide a bid guaranty in accordance with the Ohio Revised Code. The project requires the payment of prevailing wages and emphasizes the use of Ohio-based products and labor. Performance must adhere to the City of Dublin and City of Columbus construction specifications, as well as OSHA safety regulations. Payment is structured at 95 percent of approved monthly applications until the work is 50 percent complete, at which point retainage may be reduced at the city's discretion.
City of Dublin, OH - Engineering

POSTED

about 6 hours ago

DEADLINE

in 16 days
NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 8 hours ago

DEADLINE

in 6 days
NAICS: 238910
New
Federal
Y--Hickman Wildlife Water Catchment and Pipe Fence
Solicitation # 140L1726Q0054
Solicitation 140L1726Q0054 is a Total Small Business Set-Aside request for quote issued by the Department of the Interior, Bureau of Land Management, for the Hickman Wildlife Water Catchment and Pipe Fence project in Socorro County, New Mexico. The project is a firm-fixed-price contract involving the demolition and removal of existing infrastructure and the construction of a 1,000 square-foot metal catchment consisting of two 20 by 25 foot structures with galvanized gutters and propanel tops. Additionally, the contractor is required to install two BOSS tanks and erect 1,000 linear feet of pipe-and-cable fencing. The updated period of performance is scheduled from November 17, 2026, to January 25, 2027. Award will be based on the most advantageous offer, with price serving as the primary factor, followed by technical approach, nongovernmental experience, and a detailed work breakdown schedule illustrating the critical path. Contractors must adhere to Davis-Bacon wage determinations for Socorro County and comply with OSHA, EPA, and ADA regulations. Key submission requirements include a signed SF 1442, a price schedule, and a payment bond or irrevocable letter of credit due within 10 days of award. The final deadline for proposal submission is November 9, 2026, at 3:00 PM ET, with a site visit scheduled for October 29, 2026, at the Socorro Field Office.
New Mexico State Office

POSTED

about 12 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The project involves the excavation and installation of approximately 550 linear feet of stormwater piping in the 1200 Block of East 24th Street in Lawrence, Kansas. Key tasks include connecting the new stormwater system to an existing inlet, installing two city-standard curb inlets measuring 6 feet by 4 feet, and backfilling with flowable fill according to city specifications. The work also encompasses reconstructing sidewalks, drives, curb and gutter, which involves saw cutting and patching the street edge with asphalt. Additionally, three mailboxes located within the right of way will be removed and reset, with temporary traffic controls implemented as needed to ensure safety during construction. Erosion control measures, site restoration, and seeding are required to restore the area post-construction. Existing water services and irrigation systems will be adjusted and restored as necessary to accommodate the stormwater improvements. The contract, posted by the Kansas Office of the Missouri State Emergency Department, has a project value estimated between $250,000 and $500,000, with a response deadline of October 7, 2025. The primary contact for the project is Eileen Phillips, reachable via email or phone, and further project details are available through the provided online portal.

General Info

Agency

Kansas → MSO - CMED

Place of Performance

KS, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKansas → MSO - CMED
Contacts1 person available
OfficeN/A
Organization / Agency
Kansas → MSO - CMED
Office AddressN/A

Full Description

Show more
The projecct is located in the 1200 Block of East 24th Street in Lawrence KS. The project is to excavate and install approximately 550 linear feet of stormwater pipe, connect to an existing inlet and install two 6’x4’ City Standard Curb Inlets. Backfill with flowable fill per city specifications. Reconstruct sidewalks, drives, curb and gutter, including saw cutting and asphalt edge street patching subsidiary to the curb and gutter installation.  Remove and reset 3 mail boxes located in the existing Right of Way, provide temporary traffic controls as necessary during the construction, and provide erosion control, seeding and site restoration/finishing. Existing Water services and irrigation systems shall be adjusted and restored as necessary subsidiary to the stormwater installation. 

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS