Muddy Guard Station Roof Replacement GMUG USDA-FS

Awarded
1240LT23Q0123Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
SLED
47971 CONSTRUCTION
Solicitation # 47971 - C
Solicitation 47971-C is a construction project issued by the New York State OGS Design and Construction for the replacement of the roof and associated mechanical systems at the Troop F Headquarters in Middletown, New York. The scope of work encompasses comprehensive architectural, electrical, and structural modifications, including the removal of specific skylights and roof framing, the application of various waterproof and general surface finishes, and abatement work related to the first-floor reflected ceiling plan. Electrical requirements include the installation of keyed systems, the relocation of equipment for HVAC engineers, and the installation of permanent conductive fiber optic cables. The contractor is responsible for providing all necessary tools, equipment, and materials, as well as procuring all permits required for the final certificate of occupancy. All work must adhere to applicable building codes, local safety and zone differential regulations, and manufacturer recommendations. Key deliverables include the final inspection of roof trusses, sheathing, tiles, gutters, downspouts, and storm drainage systems, with final acceptance of the fastening system requiring written approval from the Owner and Architect. The solicitation was posted on October 16, 2026, with a response deadline of November 18, 2026.
NYS OGS Design & Construction - Construction Contractors

POSTED

about 1 hour ago

DEADLINE

in 20 days
NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 2 hours ago

DEADLINE

in 4 days
NAICS: 238160
New
SLED
INDEX ROOF FLUID APPLIED ROOF
Solicitation # 27-350SOS-PHYSE-B-54721
The Illinois Secretary of State is soliciting bids for the installation of a new fluid-applied roof system on the Index Building located at 111 E. Monroe St, Springfield, IL. The project requires the application of a white, cold-applied, single-component silicone elastomer membrane designed for permanent weather and sunlight exposure. Key deliverables include the construction of a 100 square foot mock-up, the performance of a 72-hour flood test to ensure water resistance, and the provision of a 20-year manufacturer full labor and material warranty. The award will be granted to the responsive and responsible bidder who submits the lowest price. Bidders must submit all proposals electronically via BidBuy by November 19, 2026, and must provide a 10% bid bond. The contract requires adherence to strict material storage and delivery standards, including the use of original manufacturer containers and storage in weather-protected environments. Compliance with the State Prompt Payment Act, prevailing wage laws, and the Illinois Department of Human Rights Act is mandatory. Additionally, the total contract term, including all renewals and extensions, cannot exceed ten years. Vendors must provide a Certificate of Insurance naming the State as an additionally insured party and are responsible for all safety barricades and traffic signage during the project.
PHYSERV350 - Physical Services

POSTED

about 19 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Muddy Guard Station Roof Replacement project, solicitation number 1240LT23Q0123, is a total small business set-aside issued by the White River National Forest under the Department of Agriculture. Located at 11300 265, Somerset, Colorado, in Delta County, the project requires a contractor to provide all labor, materials, equipment, and licenses necessary to complete a comprehensive roof overhaul. The scope of work includes the demolition of existing shingles, replacement of sheathing, installation of underlayment and standing seam metal roofing, rebuilding the entry awning, repairing the chimney, and installing attic insulation. The period of performance is scheduled from September 11, 2023, to November 11, 2023. Technical execution must adhere to specific standards, including self-adhering sheet waterproofing specifications and detailed eave, fascia, and soffit drawings. The contractor is responsible for field verification of all dimensions and must comply with bio-preferred product requirements. Labor must be compensated according to the Department of Labor General Decision Number C020230001 for building construction in Colorado. This project is situated in a remote location, and the contractor is responsible for all freight and delivery to the site.

General Info

Contract Value

$86,136

NAICS

238160 - Roofing Contractors

Place of Performance

Delta, CO, 81416, USA

Set-Aside

SBA

Documents

7

071326 - Self-Adhering Sheet Waterproofing Specifications

PDF, High priority: read this firstspecifications
High

DOL Wage Determination C020230001 - Colorado Building Construction

PDF, High priority: read this firstwage-determination
High

PAO Muddy Guard Station Roof Statement of Work

PDF, High priority: read this firstsow
High

Solicitation 12 40LT23Q0123 - Muddy Guard Station Roof Replacement

PDF, High priority: read this firstrfp
High

Solicitation B-M Muddy Guard Roof

DOCX, High priority: read this first30 pages · rfq
High

West Muddy Guard Station Roof Repair - Eave Detail Drawing

PDF, High priority: read this firstspecifications
High

Directions from Delta, CO to Somerset, CO

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → White River National Forest
Contacts2 people available
OfficeGLENWOOD SPRINGS, CO, 81601, USA
Office AddressGLENWOOD SPRINGS, CO, 81601, USA
Contacts
Lonnie D Root Contracting Officer

Full Description

Show more
Muddy Guard Station Roof Replacment Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows: Base Items: Demolition- Remove Existing Shingles Replace Sheathing Install Underlayment Install Roofing Rebuild Entry Awning Repair Chimney Install Attic Insulation LOCATION This project is located at the Muddy Guard Station. The site is located outside of the town of Paonia, Colorado in Delta County. The address is 11300 265, Somerset, CO 81434. Driving instructions can be obtained from the Paonia Ranger District office by calling +1 (555) 000-0000. See attached map for directions.

More opportunities from Department Of Agriculture → White River National Forest

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS