Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Mulholland Drive (8908) Bulkhead

Open
E1909291State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mulholland Drive (8908) Bulkhead project, solicitation E1909291, is an emergency pre-qualified on-call geotechnical and structural contract services project managed by the City of Los Angeles Bureau of Engineering. Located in a residential area on the southwest side of Mulholland Drive adjacent to 13150 Mulholland Drive, the project aims to prevent future debris flow following slope failures in 2022 and 2023. The scope of work involves removing approximately 90 linear feet of an unpermitted retaining wall and constructing a 160-foot debris wall utilizing cast in drilled hole piles, steel wide flange beams, and precast concrete and timber lagging. Additionally, the project includes installing fencing along the top of the wall and replacing the concrete curb and gutter. This project is restricted to five pre-qualified prime contractors: Calex Engineering, Clarke Contracting, Jilk Heavy Construction, Inc., Mike Prlich & Sons, Inc., and Mladen Buntich Construction Company. The City Engineer's estimate for the project is 489,160.00 USD, with funding provided by Senate Bill 1 Road Maintenance and Rehabilitation funds. Bids must be submitted by February 25, 2026, at 2:00 p.m. to Los Angeles City Hall. While a bid bond is not required, the successful bidder must provide payment and performance bonds for at least 100 percent of the task bid price. Kristen Wong serves as the project manager for this effort.

General Info

LA emergency project to build a debris wall on Mulholland Drive.

Place of Performance

Los Angeles, CA, USA

Set-Aside

emergency

Documents

2
PDF, High priority: read this first3 pages · project-description
High
ZIP

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 2 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Deadline changed

The response deadline was removed.

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering Bureau, Public Works
Contacts1 person available
OfficeN/A

Full Description

Show more
■ Only the following five Contractors can bid on this project as a Prime Contractor:• Calex Engineering• Clarke Contracting• Jilk Heavy Construction, Inc.• Mike Prlich & Sons, Inc.• Mladen Buntich Construction Company▬The project site is located along the southwest side of Mulholland Drive adjacent to 13150 Mulholland Drive in a residential area. Rainfall events that caused slope failures during December 2022 and January/February 2023. Debris was accumulated and caused a temporary road closure along Mulholland Drive at the toe of the slope. The proposed scope of work of the project includes removal of approximately 90 linear feet of an existing unpermitted retaining wall and construction of a 160-foot long debris wall on the southwest side of Mulholland Avenue. The new debris wall will consist of cast in drilled hole (CIDH) piles and steel wide flange beams with precast concrete and timber lagging. The proposed scope of work also includes fencing along the top of the debris wall as well as removal and replacement of the concrete curb and gutter along the new debris wall. Construction of a new debris wall is necessary to prevent future debris flow onto Mulholland Drive.▬▬▬▬▬ ♦ See bid package for full scope & details ♦ Bid package only on RAMP- if you're one of the prequalified contractors, download it to be a planholder ♦ For Bid Results visit http://engineering.lacity.gov/contractors/

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

36 minutes ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
International
Buckinghamshire Highways Works Open Framework
Solicitation # BC/0002075
The Buckinghamshire Highways Works Open Framework, solicitation BC/0002075, is a procurement by Buckinghamshire Council to establish an Open Framework Scheme for highway-related construction, capital-funded maintenance, and improvement schemes. The framework is designed to enhance the operation and serviceability of highway assets and is divided into seven discrete lots, with the intention of appointing a maximum of four suppliers per lot. The total estimated value of the contract ranges from £126,030,000 excluding VAT to £151,236,000 including VAT, with a maximum total duration of eight years from the commencement of the initial framework agreement, estimated to end by April 1, 2035. The procurement process is conducted in two stages, beginning with a Pre-Qualification Stage (PSQ) that evaluates financial standing, health and safety policies, and data protection. Bidders must meet specific insurance requirements, including £20m for both Employer’s and Public Liability Insurance and £5m for Professional Indemnity Insurance. Award decisions are based on the most advantageous tender, weighted 60% on price and 40% on quality. Quality assessments focus on technical capability, service delivery, the NEC4 delivery model, innovation, social value, and sustainability. Performance will be monitored through five core Key Performance Indicators (KPIs) and additional call-off KPIs. There is no set-aside status for this solicitation.
Buckinghamshire Council

POSTED

about 17 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Curtiss Park Trail State Project No. 128-158
Solicitation # E26-01
The Town of Simsbury is soliciting bids for the Curtiss Park Trail project, State Project No. 128-158, which involves the construction of approximately 3,000 linear feet of bituminous concrete multi-use trail. The trail will run along the north side of Tariffville Road, crossing the Farmington River via an existing sidewalk on the Tariffville Road bridge, and extending to Curtiss and Pattison Parks. The scope includes the construction of a boardwalk section within and adjacent to wetlands in the Farmington River riparian corridor. This project is funded through the Transportation Alternatives Program and is administered by the Connecticut Department of Transportation. The contract will be awarded to the lowest responsive and responsible bidder who is properly licensed, adequately staffed, and experienced in the required work. Bidders must provide a CTDOT contractor prequalification certificate and submit a physical bid package including a non-collusion affidavit, bid security, and a hold harmless and indemnification agreement. Key technical requirements include adherence to CTDOT Standard Specifications and Connecticut Guidelines for Soil Erosion and Sediment Control. Revised bid quantities include 1,172 cubic yards of earth excavation and 1,710 tons for the disposal of controlled materials. There is no set-aside status for this solicitation, and the DBE participation goal is zero percent. Bids are due by November 24, 2026, at 2:00 PM.
DAS Procurement

POSTED

about 20 hours ago

DEADLINE

in 2 days
View Details

More opportunities from California → Engineering Bureau, Public Works

Same awarding agency

NAICS: 541330
SLED
TOS No. 105 - Baldwin Vista Green Streets Project
Solicitation # 105
Task Order Solicitation No. 105 is for the Baldwin Vista Green Streets Project, managed by the City of Los Angeles Bureau of Engineering and LA Sanitation and Environment. The project focuses on stormwater capture and infiltration within the Baldwin Vista community, specifically along Coliseum Street between Hauser Boulevard and Nicolet Avenue. The scope of work includes engineering services for pre-design, design, bid and award, and construction support to install approximately 23 double drywell units, one single drywell unit, 450 square feet of bioswales with native landscaping, 40 new street trees, and seven educational displays. The project is funded through the Safe Clean Water Program, with total estimated costs ranging from 9.3 million dollars for construction to approximately 10.9 million dollars when including planning, design, operations, maintenance, and three years of post-construction monitoring. The contract utilizes a hybrid compensation structure, with pre-design and design phases paid on a lump-sum basis and bid, award, and construction support services reimbursed at hourly-salary rates. Proposals are evaluated based on project understanding and technical approach (30 percent), team qualifications (20 percent), value and resource allocation (20 percent), knowledge of City standards (20 percent), and project delivery performance (10 percent). Key requirements include adherence to ADA accessibility, California prevailing wage laws, and a Minority Business Enterprise participation goal of 18 percent. Deliverables follow a phased review process with required approvals at 30, 50, 90, and 100 percent design stages. The solicitation closing date is January 5, 2027, with the task order expected to be issued by April 15, 2027.
Engineering Services

POSTED

13 days ago

DEADLINE

N/A
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS