Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Mulqueeney Ranch Wind Repowering Project Final Subsequent EIR

Forecast
EPIMS-ALA-16122-R3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement Amendment 1 (EPIMS-ALA-16122-R3 Amendment 1) for the Mulqueeney Ranch Wind Repowering Project. This agreement, executed pursuant to Fish and Game Code section 1602, is between the department and the project applicant, Mulqueeney Wind Energy, LLC. The project is located in Alameda County on Patterson Pass Road, west of Midway Road and south of I-580, with the County of Alameda serving as the lead agency. The scope of the amendment specifically modifies Activity 5 regarding the installation of New Culvert #1. To facilitate this installation, the project allows for the temporary dewatering or diversion of water between the pond and the culvert location. A mandatory condition of this work is the use of a screened pump for any necessary stream dewatering. A Notice of Determination issued on August 13, 2025, confirms that the project will not have a significant environmental effect within the jurisdiction of the California Department of Fish and Wildlife, provided that established mitigation measures are followed.

General Info

CDFW amendment for Mulqueeney Wind Project modifying culvert installation and water diversion rules.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement Amendment 1 (EPIMS-ALA-16122-R3 Amendment 1), pursuant to Fish and Game Code section 1602, to the project Applicant, Mulqueeney Wind Energy, LLC. The amended project includes a change in work associated with "Activity 5 - New Culvert #1" in the original Streambed Alteration Agreement. Temporary dewatering/diversion of water may be necessary between the pond and the culvert location to temporarily dry the work area for installation of the proposed culverts. If dewatering is necessary, a screened pump will be used to dewater the stream before installing the new culverts as originally proposed.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 12 hours ago

DEADLINE

in 21 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 14 hours ago

DEADLINE

in 24 days
View Details

More opportunities from California → Alameda County

Same awarding agency

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS