Multi -Roof Replacement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves the complete removal and replacement of deteriorated roofing systems on multiple buildings at the Princeton Plasma Physics Laboratory, including the ESAT Building, PLT Power Building, C Site Pump House, and Rad Waste Handling Facility. The existing roofs have surpassed their useful life and suffer from severe water infiltration, damaged flashing, and metal coping issues, requiring urgent attention to prevent operational disruptions in critical laboratory functions. The contractor is responsible for providing all necessary materials, labor, supervision, and equipment, ensuring compliance with manufacturer specifications to deliver a high-quality, durable roofing system with a minimum 30-year warranty. The scope encompasses demolition of existing roofing materials, recycling of stone ballast, inspection and replacement of integrated roof components such as drains, gutters, and flashing, and installation of new roofing comprising layers of insulation, cover boards, and a 145-mil Carlisle Fleeceback EPDM membrane. Additional requirements include raising curbs and vents, adding expansion joints, installing new roof drains, and providing perimeter guardrails. Coordination with asbestos abatement efforts, protection and reinstallation of roof-mounted equipment, and power shutoff arrangements are also required. The project emphasizes maintaining structural integrity, energy efficiency with an R-30 insulation value, and compliance with safety standards. The scheduled response deadline for bids is February 24, 2026, and the work is to be performed in Princeton, New Jersey under the oversight of the DOE contractor organization.
General Info
Place of Performance
Set-Aside
Documents
9AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 21 days
- Building 262 Renovations FLETC GlyncoOpen now, due in 6 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Response deadline changed from Feb 24, 2026 to Feb 27, 2026. The notice description changed.
Deadline has passed
Organization & Contact Information
Full Description
There are several existing roofs (C50 ESAT Building/C52 PLT Power Building/C60 C Site Pump
House/D45 Rad Waste Handling Facility) which are past their useful life requiring costly
maintenance to upkeep. Severe water infiltration occurs regularly at failing joints, punctures,
and flashing. Portions of existing metal coping have pulled away during storm events causing
large sections of membrane to separate from the substrate. A catastrophic failure to one of
these roofs would negatively impact the ability to conduct the top priority experimental
operations in the Laboratory.
1.2. SCOPE
1.2.1. The Subcontractor shall provide all materials, labor, supervision, equipment, and expertise
required replace the noted roofs and specified components per the associated contract
documents. Construction scope includes the following:
1.2.1.1. Remove and replace existing built-up roofs at PPPL. Buildings include:
1.2.1.1.1. C50 – ESAT Building
1.2.1.1.2. C52 – PLT Power Building
1.2.1.1.3. C60 – C Site Pump House
1.2.1.1.4. D45 – Rad Waste Handling Facility
1.2.1.2. Demolition including removal of existing membrane, cover board, insulation, metal trim,
flashing, coping and any other miscellaneous roofing material accessories.
1.2.1.3. Remove and recycle stone ballast on ballasted roofs. Recycle documentation to be
provided to PPPL.
1.2.1.4. Additional integrated roof elements shall be inspected and replaced as specified within
this SOW. Elements include: wood blocking, roof drains, gutters, scuppers, downspouts,
and metal/concrete roof panels.
1.2.1.5. Abandoned equipment shall be removed to a point that does not affect new roof
installation. Any equipment that should be temporarily relocated so roof replacement
work can be completed shall be the responsibility of the roofing contractor.
1.2.1.6. Contractor to furnish and install 2 layers of 2.6” ISO.
1.2.1.7. Contractor to furnish and install ½” HD coverboard mechanically fastened.
1.2.1.8. Contractor to furnish and install 145 mil Carlisle Fleeceback EPDM, black in color adhered
to coverboard.
1.2.1.9. Contractor to furnish and install counter flashing and copings, expansion joints and other
roofing components as required for manufacturer’s warranty.
Page 3 of 21
1.2.1.10. The new roof system shall be comprised of the following materials: EPDM membrane,
cover board, and insulation.
1.2.1.10.1. Meets a minimum insulating value of R-30 average. Modifications to the existing
building envelope are required to accommodate additional insulation.
1.2.1.10.2. Flexible walkway pads shall be provided to all operating equipment/drain locations
and as necessary to meet manufacturer’s requirements.
1.2.1.10.3. All materials shall be furnished by Carlisle Syntec Systems and shall meet all
manufacturer specifications to obtain a minimum manufacturer system warranty of
30 years along with a 2-year installers warranty. The warranty coverage shall
include incidental membrane punctures, damage from hail and a minimum of 72-
mph peak gust wind speeds.
1.2.1.11. Roof perimeter guardrails shall be provided on all roofs. See attached guardrail cut sheet
for details.
1.2.1.12. New and higher curbs as required due to the new roof installation work.
1.2.1.13. Contractor to build up existing roof vents as required due to the new roof work.
1.2.1.14. Expansion joint to be raised up to account for new roof insulation height for the ESAT
building roof.
1.2.1.15. Contractor to add a new roof drain at the Northwest section of the ESAT building roof.
1.2.1.16. Contractor to replace all existing roof scuppers with new.
1.2.1.17. Contractor to replace all existing roof drains with new.
1.2.1.18. Contractor to provide minimum of 12” overlap between the existing adjacent roof
membrane system and provide written confirmation the systems are compatible.
1.2.1.19. Contractor to temporary relocate and reinstall any fall protection anchor systems
identified on roof sections.
1.2.1.20. Contractor to install secondary drainage per code in addition to existing drains for the PLT
building roof.
1.2.1.21. If necessary, existing asbestos elements shall be mitigated by PPPL. Subcontractor to
assist the abatement contractor to bring the sealed roofing material down from roof area
to grade with lift equipment. Coordination of this work shall be completed in concert with
all other construction activities. The subcontractor to follow directly after PPPL
abatement contractor to install new roofing system. The construction subcontractor shall
be responsible to coordinate all work with PPPL.
1.2.1.22. Any and all equipment that requires power disconnect has to be coordinated with PPPL a
minimum of 72 hours prior. All equipment that will be out of service shall be minimized.
1.2.1.23. All roof fans and equipment are to be salvaged, protected, and reinstalled.
THERE ARE (5) COVER LETTER SECTIONS TO THE RFP. THERE ARE FILES ATTACHED TO EACH COVER LETTER. TO VIEW THE ATTACHMENTS YOU MUST
(1) FIRST DOWNLOAD EACH COVER LETTER SECTION TO YOUR DESKTOP.
(2) AFTER DOWNLOADING EACH COVER LETTER--REOPENED EACH ONE (ON YOUR DESKTOP)
YOU SHOULD BE ABLE TO SEE THE ATTACHED FILES ON THE RIGHT HAND SIDE OF THE COMPUTER SCREEN. BE SURE TO UTILIZE ADOBE ACROBAT SOFTWARE TO VIEW THE PDF FILES
More opportunities from Department Of Energy → Princeton Labor - DOE Contractor
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS