This Solicitation opportunity from Pennsylvania was posted on November 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
MULTICULTURAL ACADEMY CS 2026 WIRELESS EQUIPMENT INSTALLATION
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Multicultural Academy Charter School is seeking installation services for wireless access points previously acquired through the E-Rate process. The scope of work includes Category 2 internal connections for wireless access points, necessary software, licenses, and basic maintenance. This solicitation is structured for per-unit equipment and service pricing rather than as a project-based bid, allowing the school to leverage these rates against final quantities defined during the 471 submission. The school reserves the right to award contracts in part or in whole to multiple vendors, and respondents may offer quantity discounting. Potential bidders must adhere to all mandated response directions and monitor specified websites for addendums or schedule changes. Because work may occur in student-populated areas, specific criminal and child protection clearances may be required. Evaluation will be based on the scoring criteria outlined in the bid spreadsheet. All inquiries and responses must follow the established contact procedures, and non-conforming submissions may be rejected.
General Info
Place of Performance
Set-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Emergency/Exit Lighting – Mechanical/Electrical Rooms ProjectOpen now, due in 11 days
- Transformer Oil Testing ServicesOpen now, due in 29 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
RFP REQUIREMENTS NOTED ON RFP...SCORING CRITERIA OF CONSIDERATION LISTED AT BOTTOM OF BID. PLEASE READ ENTIRE RFP AND ATTACHMENT DOCUMENTS BEFORE ENGAGING IN ANY QUESTIONS AS MOST QUESTIONS ARE ALREADY ADDRESSED IN THE POSTED RFP DOCS. PLEASE ABIDE BY MANDATED RESPONSE DIRECTIONS AS OTHER NON-CONFORMING RESPONSES MAY NOT BE ACCEPTED. ALSO NOTE THAT SPECIFIC CRIMINAL/CHILD PROTECTION CLEARANCES MAY BE REQUIRED IF WORK WILL BE DONE AROUND STUDENT POPULATED AREA(S). INQUIRY CONTACT PROCEDURES AND BID RESPONSE REQUIREMENTS IDENTIFIED THROUGHOUT THE POSTED BID. BIDS ARE NOT STRUCTURED TO BE PROJECT BASE. SEEKING PER UNIT EQUIPMENT AND_OR SERVICE PRICING WHICH WILL BE LEVERAGED AGAINST FINAL FRN DEFINED QUANTITIES AT THE TIME OF SUBMITTING THE 471.
Requested services (4 line items): - Category 2 — Internal Connections — Wireless Access Points And Necessary Software And Licenses - Category 2 — Basic Maintenance Of Internal Connections — Wireless Access Points
State/local procurement requirements: ALL BID REQUIREMENTS, POTENTIAL OUTREACH REGARDING INQUIRIES AND RELATIVE SCORING CRITERIA ARE NOTED WITHIN THE POSTED BID SPREADSHEET.
Reference documents (Form 470 / RFP): https://publicdata.usac.org/EPC/Prd/Form470/260005692/221994/20591931-USAC_FCC_FORM_470_APPLICATION_260005692_CERTIFIED.pdf, https://publicdata.usac.org/EPC/Prd/Form470/260005692/221994/20590893-MULTICULT%20ACAD.%20CS%20YR29%20WIRELESS%20INSTALLATION%20470%20SPREADSHEET%20%20xxxxx.xlsx, https://publicdata.usac.org/EPC/Prd/Form470/260005692/221994/20590919-MULTICULTURAL%20FY29%202025%2026_EQUIPMENT_PEPPM%20CONTRACT%20to%20be%20signed.pdf
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
