Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Municipal District of Bonnyville No. 87 - Invitation to Bid - BF 72752 - Bridge Replacement and Other work

Closed
AB-2026-03472Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months

AI Contract Overview

Show more

The contract involves the complete replacement of an existing two-span precast concrete girder bridge on timber piles with a new three-span structure consisting of prestressed girders measuring 8 meters, 14 meters, and 8 meters in length. All existing bridge components will be removed and properly disposed of, while new galvanized and plain steel H-piles will be supplied, driven, and installed at abutments and piers, along with associated SPCS backwalls, wingwalls, and structural caps featuring stiffener plates. The project includes the placement of Class 1 heavy rock riprap for erosion control, backfilling at the bridge ends, and the supply and installation of a new TL-2 low height thrie beam bridge rail system with approach rail transitions, as well as approach road guardrail. Roadway work will be conducted to integrate the new structure, and silt fence will be installed for sediment control during construction. The work is being procured by the Municipal District of Bonnyville No. 87 under solicitation number AB-2026-03472, with bids due by May 27, 2026, and the project to be performed in Alberta.

General Info

Replace two-span bridge with new three-span prestressed girder structure, install steel piles, guardrails, riprap, and sediment control in Alberta.

Agency

Government of Canada → Municipal District of Bonnyville No. 87View Agency

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Municipal District of Bonnyville No. 87
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Municipal District of Bonnyville No. 87
View Agency Profile
Office AddressN/A
Contacts
Amber OzarukContracting Authority

Full Description

Show more
The Scope of Work for this Contract is to remove and dispose the existing two spans (2 - 6.1 m ) precast concrete girder bridge on timber piles and to supply, set up and drive galvanized and plain steel H piles at abutments and piers, SPCS abutments backwalls and wingwalls including new steel H-piles abutment and pier caps with stiffener plates, Class 1 heavy rock riprap, fabrication, delivery and erection of three spans (8m-14m-8 m) long type SL-510 prestressed girders, backfill at bridge ends, supply and installation of new TL-2 low height thrie beam bridgerail and approach rail transition, approach road guardrail, roadway work, and supply and installation of silt fence.