Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Murray Avenue Water Pipeline Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Murray Avenue Water Pipeline Replacement project, managed by the City of Gilroy, involves the installation of approximately 70 feet of eight-inch ductile iron pipeline in the public right-of-way at the intersection of Murray Avenue and Burke Drive. The scope of work includes abandoning an existing four-inch water pipeline in place, reconnecting the Burke Drive distribution main to an existing 12-inch pipeline, and utilizing open-cut methods to disconnect twelve service lines from the old four-inch pipeline and reconnect them to the 12-inch main. The project is located in Gilroy, California, within the 95020 zip code. This project is currently categorized as a forecast with a posted date of July 30, 2025, and falls under NAICS code 237110. It has been granted a statutory exemption under the California Environmental Quality Act pursuant to Public Resources Code Sections 21080.21 and 15282(k) because the pipeline replacement is less than one mile in length and meets current codes. Administrative filings and associated fees have been processed through the Santa Clara County Clerk-Recorder Office. Heath McMahon, the Utilities Director for the City of Gilroy, serves as the primary point of contact.

General Info

Gilroy replaces 70 feet of 4-inch water pipe with 8-inch ductile iron and reconnects 12 services to 12-inch main.

Agency

California → City of Gilroy

Place of Performance

Murray Avenue between Burke Drive and Leavesley Road, Gilroy, CA, 95020

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Gilroy
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Gilroy
Office AddressN/A
Contacts
Heath McMahonUtilities Director

Full Description

Show more
On Murray Avenue, the existing four-inch water pipeline would be abandoned in place, and approximately 70 feet of eight-inch ductile iron pipeline would be installed in the public right-of-way at the intersection of Murray Avenue and Burke Drive to reconnect the Burke Drive distribution main to the existing 12-inch pipeline on Murray Avenue. Twelve service lines along Murray Avenue between Burke Drive and Leavesley Road would be disconnected from the existing four-inch water pipeline and reconnected to the existing 12-inch water pipeline using open-cut methods.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the installation of pumps, a generator, odor control equipment, mechanical and electrical systems, and the demolition of existing pumps and piping. The project also encompasses site improvements such as stormwater facilities, fencing, and various paving and restoration activities. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with specific requirements for the submission of a Good Faith Efforts Form and Table A to meet MBE/WBE participation goals of 10.9 percent for the EPA and 10 percent for the State of North Carolina. Performance and payment bonds, as well as proof of insurance, are required. The project is managed by Willis Engineers, and the contractor will be subject to liquidated damages of 1,000 dollars per day for failure to achieve substantial completion. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner. All work must adhere to strict quality standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS