This Solicitation opportunity from California was posted on June 27, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Murray Street Bridge project involves comprehensive structural upgrades and aesthetic enhancements aimed at improving safety, functionality, and visual appeal. Key activities include installing new piles, extending existing pile caps, constructing new columns and bent caps, widening the bridge deck, and replacing the solid concrete vehicular barrier with see-through rails to enhance views of the harbor and ocean. The project also features the addition of wide, 6-foot bike lanes and a 7.5-foot sidewalk on the south side of the bridge to support two-way pedestrian and bicycle traffic. Elevated curbs adjacent to the bike lanes will be replaced with standard 6-inch curbs to improve cyclist safety and comfort. Additionally, the storm drain system on the west side will be upgraded, and the transition areas will be widened for better accessibility and flow.
Funded through state and federal sources, the project emphasizes improvements within 200 feet of the bridge abutments, aligning with the scope of widening bike lanes and sidewalks. The contract, valued between 5 million and 15 million dollars, is managed by the California Public Works Department and is open for responses until August 29, 2024. The project aims to enhance the structural integrity of the bridge, promote safer pedestrian and bicycle use, and provide better scenic views, ultimately contributing to the area's transportation infrastructure and aesthetic environment. For further details or to submit inquiries, contact Josh Spangrud via email or phone.
HighAI Summary for Caltrans 2018 Revised Standard Plans (April 2021): A collection of revised standard plans and technical specifications from the State of California Department of Transportation (Caltrans). The document includes detailed engineering standards for pavement markers, traffic lines, word markings, precast reinforced concrete box culvert excavation/backfill, wildlife passageways, and Midwest Guardrail System (MGS) hardware and post details. It contains various Revised Standard Plans (RSP) dated between 2018 and 2020.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Santa Cruz Bridge Repairs - As-builts Full Set: As-built plan set for the City of Santa Cruz bridge repairs at Small Craft Harbor, Ocean Villa, Squel Avenue, and Ocean Street bridge locations (Federal Aid Project NC. ER-1606(2)). The document includes an index of plans, elevations, and sections approved by Parsons Brinckerhoff Quade & Douglas, Inc. and City of Santa Cruz Public Works officials, dated February 22, 1990.
PDF
PDF, High priority: read this firstifb
HighAI Summary for City Project No. C409321 - Murray Street Bridge Seismic Retrofit/Barrier Replacement: Invitation for Bids (IFB) issued by the City of Santa Cruz for the seismic retrofit and barrier replacement of the Murray Street Bridge at the Small Craft Harbor (Project No. C409321). The scope includes structural retrofitting, barrier replacement, roadway approach work, and installation of retaining walls and utilities. Bids are due August 29, 2024, with mandatory pre-bid conferences held in July 2024. The project is federally funded and requires DIR registration for prevailing wages.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for EPIMS-SCR-23133-R3: Murray Street Bridge Seismic Retrofit Agreement: A draft Streambed Alteration Agreement between the California Department of Fish and Wildlife (CDFW) and the City of Santa Cruz Public Works. The document outlines the terms and technical requirements for the seismic retrofit of the Murray Street Bridge, including the installation of CISS and CIDH piles, construction of temporary trestles, and the temporary removal and replacement of harbor boat berths to protect fish and wildlife resources.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Murray RW Retaining Wall No. 9 Plans: Technical construction plans and specifications for Retaining Wall No. 9. The document includes an index of plans, detailed quantity take-offs (excavation, concrete, steel soldier piles, and timber lagging), pile data tables with design tip elevations, and structural design data based on AASHTO LRFD Bridge Design Specifications. It contains critical technical requirements for pile installation and utility protection.
PDF
PDF, High priority: read this firstjustification-and-authorization
HighAI Summary for Murray St. Bridge Incidental Harassment Authorization (2023-2024): This document is an Incidental Harassment Authorization (IHA) issued to the City of Santa Cruz under the Marine Mammal Protection Act. It authorizes the incidental take of California sea lions and harbor seals during pile driving activities for the Murray St. Bridge seismic retrofit project in Santa Cruz Harbor. The authorization is valid from July 1, 2023, through June 30, 2024, and outlines strict mitigation requirements, including the use of Protected Species Observers (PSOs), shutdown zones, and mandatory reporting protocols to NMFS.
PDF
PDF, High priority: read this firstspecial-notice
HighAI Summary for Murray St. Bridge Incidental Harassment Authorization (2023 IHA Year 2): This document is an Incidental Harassment Authorization (IHA) issued to the City of Santa Cruz for the Murray St. Bridge seismic retrofit project. Valid from July 1, 2024, through June 30, 2025, it authorizes the incidental take of California sea lions and harbor seals during pile driving activities. The document outlines critical mitigation requirements, including the use of Protected Species Observers (PSOs), shutdown zones, soft start techniques, and mandatory reporting protocols to NMFS.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Murray Street Bridge (# 36C-0108) Natural Environment Study: August 2010 Natural Environment Study for the Murray Street Bridge (# 36C-0108) Seismic Retrofit Project in Santa Cruz, CA (Federal Project Number STPLX-5025). The document details environmental impacts, critical habitat alterations for steelhead and green sturgeon, and required avoidance and minimization measures for construction, including pile driving restrictions and marine mammal mitigation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Murray Street Bridge (36C0108) - Seismic Retrofit and Barrier Replacement: Technical engineering plans and specifications for the Murray Street Bridge (Bridge No. 36C0108) seismic retrofit and barrier replacement for the City of Santa Cruz Public Works Department. The document includes detailed drawings for railing, fender details, girder layout, and utility water line hangers, along with specific fabrication notes regarding galvanization and reinforcement.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Murray Street Bridge Environmental Commitments Record (ECR): Environmental Commitments Record (ECR) for the Murray Street Bridge Seismic Retrofit and Barrier Replacement at Santa Cruz Small Craft Harbor. Last modified 6/28/23, the document tracks environmental permits (USACE, RWQCB, CDFW, NOAA, CCC, USCG) and specific biological mitigation measures, including pile driving timing and vegetation removal requirements, to ensure compliance with CEQA and other regulatory agencies.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Murray Street Bridge Final Foundation Report (July 2023): Final Foundation Report prepared by Crawford & Associates, Inc. in July 2023 for the Murray Street Bridge Seismic Retrofit and Barrier Replacement project in Santa Cruz, California. The document provides geotechnical subsurface exploration results, seismic design recommendations, and specific foundation design criteria for new bridge foundations and approach roadways, including pile data and construction notes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Murray Street Bridge Final Foundation Report - Retaining Walls 11, 17 & 18: Final Foundation Report dated September 20, 2023, prepared by Crawford & Associates, Inc. for the Murray Street Bridge Seismic Retrofit and Barrier Replacement project in Santa Cruz, CA. The document provides geotechnical subsurface exploration results, seismic design recommendations, and specific foundation data for Retaining Walls No. 11, 17, and 18, including pile data and lateral earth pressures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Murray Street Bridge RW-9 Final Foundation Report: Final Foundation Report dated July 19, 2023, prepared by Crawford & Associates, Inc. for TRC regarding the Murray Street Bridge Seismic Retrofit and Barrier Replacement in Santa Cruz, CA. The document provides geotechnical exploration results, subsurface conditions, and specific engineering recommendations for the design and construction of Retaining Wall No. 9 (RW-9), including soldier pile specifications and lateral earth pressures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Murray Street Bridge Seismic Retrofit/Barrier Replacement Project Plans: Project plans and construction notes for the seismic retrofit and barrier replacement of the Murray Street Bridge (Br. No. 36C0108) at Santa Cruz Small Craft Harbor, Federal Aid Project No. STPLZ-5025(084). The document includes construction notes, utility legends, a port relocation table detailing contractor responsibilities for temporary buildings and storage, and technical specifications referencing City of Santa Cruz and Caltrans standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Murray Street Bridge Seismic Retrofit - Hydroacoustic Monitoring Plan: Dated May 2023, this Hydroacoustic Monitoring Plan for the Murray Street Bridge Seismic Retrofit Project (Federal Project Number STPLX-5025 (048)) outlines the requirements for monitoring underwater noise during pile removal and installation. It details regulatory compliance for marine wildlife protection, monitoring methodology, equipment requirements, and reporting procedures to mitigate impacts on marine mammals and fish.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Murray Street Bridge Seismic Retrofit - Marine Wildlife Protection Plan (April 2023): Dated April 2023, this Marine Wildlife Protection Plan (MWPP) outlines mitigation measures for the Murray Street Bridge Seismic Retrofit Project in Santa Cruz, CA. It establishes protocols to protect marine mammals—specifically the southern sea otter, harbor seal, and California sea lion—during on-land and in-water construction. The document integrates requirements from the NOAA Incidental Harassment Authorization, California Coastal Commission, and CDFW, focusing on noise monitoring, pile driving timing, and the establishment of stop-work zones to minimize incidental take.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Murray Street Bridge Seismic Retrofit - Mitigation and Avoidance Measures Summary: Revised July 28, 2023, this document provides a comprehensive summary of mitigation, avoidance, and minimization measures for the Murray Street Bridge Seismic Retrofit Project. It compiles requirements from CEQA, NEPA, and various regulatory permits (CCC, NOAA, CDFW, RWQCB). The document outlines specific implementation timing, including measures to be included in construction plans, pre-construction surveys, biological monitoring during construction, and post-construction requirements, specifically focusing on environmental protections for marine mammals, birds, and bats.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Murray Street Bridge Seismic Retrofit Project - Initial Study: A November 2007 Mitigated Negative Declaration and Initial Study for the Murray Street Bridge Seismic Retrofit Project in the City of Santa Cruz. The document outlines the project scope, including seismic retrofitting and barrier modifications, and details specific environmental mitigation measures regarding biological resources, including protections for steelhead, bats, marine mammals, and nesting birds.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Reconstruction of Boatyard, K and Rowing Docks - Santa Cruz Harbor Tsunami Recovery: Technical record drawings and specifications dated June 1, 2014, for the reconstruction of Boatyard, K, and Rowing Docks at Santa Cruz Harbor. The document contains detailed electrical general notes, substation enclosure requirements, utility vault specifications, and installation details for conduits and feeders.
PDF
PDF, Low priorityother
LowAI Summary for 8.1_-_1962-028.pdf: Unreadable document.
PDF
PDF, Low priorityother
LowAI Summary for 8.2 - 1962-029: Unreadable document.
PDF
PDF, Low priorityother
LowAI Summary for 8.5_-_1974-050.pdf: Unreadable document.
PDF
PDF, Low priorityspecifications
LowAI Summary for As-Builts: West Harbor Plaza Area - Turning Basin Project II: As-built documentation for the Santa Cruz Port District Lower Harbor Turning Basin Project II at the Santa Cruz Small Craft Harbor.
PDF
PDF, Low priorityspecifications
LowAI Summary for Caltrans Bridge Inspection Report - Bridge 36C0108 (Woods Lagoon): A July 6, 2018, transmittal and inspection report from Caltrans Structure Maintenance and Investigations to the City of Santa Cruz. The document includes an underwater inspection report for the Woods Lagoon (Glenn E. Coolidge Memorial Bridge), detailing structural adequacy, load ratings, and physical condition in compliance with NBIS and Federal Highway Act standards.
PDF
PDF, Low prioritypermit
LowAI Summary for CDP 3-22-0165 Murray Street Bridge Improvements: Coastal Development Permit (CDP) 3-22-0165 issued by the California Coastal Commission on December 21, 2022, to the City of Santa Cruz. The permit authorizes seismic safety improvements, widening, and utility relocation for the Murray Street Bridge, subject to specific standard and special conditions regarding construction plans, water quality BMPs, and debris disposal.
PDF
PDF, Low priorityother
LowAI Summary for Commune of 7th Ave RECORD DW6 (1971-045): A brief record or filing notice from the Commune of 7th Ave, referencing files CWO A-24, A-42, 71-45, 72-S2, and 76-6S, received from District on 1/5/03.
PDF
PDF, Low prioritycontract-document
LowAI Summary for HSCG89-22-6-0049 - Revocable License for Coast Guard Station Santa Cruz: A revocable license (HSCG89-22-6-0049) granted by the U.S. Coast Guard to Bender Rosenthal Incorporated for the non-federal use of federal real property at Coast Guard Station, Santa Cruz, CA. The license is effective from 4/15/22 to 4/14/24 and authorizes land use specifically for the Murray Street Bridge seismic retrofit project, including the installation of piles, concrete infill walls, and bridge barrier improvements.
PDF
PDF, Low prioritybiological-assessment
LowAI Summary for Murray Street Bridge (# 36C-0108) Biological Assessment: Dated July 2010, this Biological Assessment evaluates the environmental impact of the seismic retrofit and rehabilitation of the Murray Street Bridge in Santa Cruz, CA. The document identifies potential impacts on federally-listed species, including steelhead trout, green sturgeon, and southern sea otters, and outlines avoidance and minimization measures such as specific pile-driving windows and a marine mammal mitigation plan.
PDF
PDF, Low priorityspecifications
LowAI Summary for Murray Street Bridge (# 36C-0108) Essential Fish Habitat Assessment: An Essential Fish Habitat (EFH) assessment dated July 2010 for the Murray Street Bridge Seismic Retrofit Project in Santa Cruz, CA. The document evaluates potential adverse effects on EFH as required by the Magnuson-Stevens Fishery Conservation and Management Act and describes the proposed seismic retrofit and bridge improvements, including the installation of CISS and CIDH piles.
PDF
PDF, Low priorityother
LowAI Summary for Murray Street Bridge Seismic Retrofit - Incidental Harassment Authorization Application: An application for Incidental Harassment Authorization (IHA) revised July 2016 for the Murray Street Bridge Seismic Retrofit Project (Federal Project Number STPLX-5025 (048)) in Santa Cruz, CA. The document details the project's scope, including the installation of CISS and CIDH piles, and assesses the potential impact and incidental take of marine mammals (sea otters, harbor seals, and California sea lions) during construction.
PDF
PDF, Low priorityother
LowAI Summary for Murray Street Bridge Seismic Retrofit Project - Mitigated Negative Declaration Addendum: An addendum dated February 2009 to the Mitigated Negative Declaration for the Murray Street Bridge Seismic Retrofit Project in Santa Cruz, CA. The document details project components including seismic retrofitting of bridge bents and abutments, bridge barrier improvements, and the temporary relocation of harbor facilities and boat berths to accommodate construction.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for Murray Street Bridge Seismic Retrofit Project - MND Addendum: This document is a Mitigated Negative Declaration (MND) Addendum dated September 15, 2014, for the City of Santa Cruz Murray Street Bridge Seismic Retrofit Project. It outlines project modifications, including the removal of seven heritage trees and the elimination of previously proposed new boat berths. The document provides a detailed project description of seismic retrofitting elements (piles, infill walls, and shear keys) and a phased construction schedule.
PDF
PDF, Low priorityq-and-a
LowAI Summary for Murray Street Bridge Seismic Retrofit - Response to Comments: Dated January 10, 2008, this document provides the City's responses to public and agency comments regarding the Initial Study/Mitigated Negative Declaration for the Murray Street Bridge Seismic Retrofit Project (SCH#: 2007112037). It addresses concerns from the California Coastal Commission, UCSC, MBUAPCD, Santa Cruz County, RTC, and Union Pacific Railroad regarding pile installation, air quality, traffic impacts, and right-of-way encroachment.
PDF
PDF, Low priorityother
LowAI Summary for SCMU Work Order #4869: A service work order and report (Work Order #4869) dated July 21, detailing the installation of a 12-inch main material at Eatou St @ Bridge, between Lake Ave and Seabright. The document includes material lists, labor codes, and completion dates from September 1998.
PDF
PDF, Low priorityother
LowAI Summary for SIO-11802 - Santa Cruz Municipal Utilities Service Installation Order: A Service Installation Order (SIO-11802) from Santa Cruz Municipal Utilities for a 1-inch service installation at 495 Duke Ave for S.C. Port. The document includes a field report detailing material and pipe sizes, with completion noted on April 12, 1981.
PDF
PDF, Low priorityother
LowAI Summary for SIO-15515 - Service Installation Order: A service installation and inspection record dated August 2, 1996, for the SC Port Dist at Pier G, Yacht Harbor. The document details the installation of a 1-1/2 inch fire hose reel with an RP backflow device, including field reports on pipe materials and a final installation date of March 13, 1996.
PDF
PDF, Low priorityother
LowAI Summary for SIO-15516 - Pier G Water Service Relocation: A service installation order (SIO# 15516) dated August 2, 1996, for the SC Port Dist at Pier G. The document details the relocation of a 3/4 inch water service and RP backflow device for the Elevated Walkway/Charter Office and Site Improvements, including field report data on materials and installation depths.
PDF
PDF, Low prioritydetermination-and-findings
LowAI Summary for USFWS Biological Opinion - Murray Street Bridge Seismic Retrofit (#36C-0108): Letter dated February 4, 2011, from the US Fish and Wildlife Service to Caltrans regarding the Seismic Retrofit of the Murray Street Bridge. The document concludes formal consultation under the Endangered Species Act, determining that the project is not likely to adversely affect southern sea otters based on proposed mitigation measures and habitat analysis.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for USFWS Listed Species Update - Murray Street Bridge Seismic Retrofit: A letter dated August 3, 2010, from the USFWS Ventura Fish and Wildlife Office to Ecosystems West Consulting Group providing an official updated list of endangered, threatened, and special status species for the Murray Street Bridge Seismic Retrofit project in Santa Cruz County, California. The update was prompted by the delisting of the brown pelican.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for Water Quality Certification No. 34422WQ06 - Murray Street Bridge Seismic Retrofit Project: Issued July 12, 2023, by the Central Coast Regional Water Quality Control Board, this document provides the Clean Water Act Section 401 Water Quality Certification for the Murray Street Bridge Seismic Retrofit Project in Santa Cruz County. It outlines the certification action, standard conditions, and administrative requirements necessary to protect state water quality during project implementation.
This project will install new piles, extend the existing pile caps to incorporate the new piles, construct a new line of columns, place new bent caps, widen the bridge deck, and construct new see-through barrier rails. The resulting project, in addition to the structural upgrades, will result in a bridge deck with wide 6-foot bike lanes and a 7.5-foot sidewalk along the south (ocean) side to support a two-way pedestrian path of travel. The elevated curbs adjacent to the bike lanes will be replaced with standard 6-inch high curbs to improve the bicycle user experience. The solid concrete vehicular barrier will be replaced with rails, allowing for better harbor and ocean views. State and federal funding allows for improvements within 200 feet of the bridge abutments. Therefore, the project includes widening the bike lanes and sidewalks to improve the transitions and storm drain system on the west side of the bridge.