Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 11, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Murrieta Hot Springs Road Pavement Rehabilitation Project

Closed
24-485State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; construction and utility tasks including tunneling, boring, jacking, and cathodic protection; and surface improvements such as asphalt paving, lighting, and landscaping. Additionally, the project requires various materials and support services, including ready mix, precast concrete, traffic control, and storm water pollution prevention. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, VBE, and OBE certifications. To be considered, responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a bid submission deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
CSAH 102 (Douglas Drive) Safety Improvements
Solicitation # 2211300
The CSAH 102 (Douglas Drive) Safety Improvements project, administered by Hennepin County and the Minnesota Department of Transportation under state project number 027-702-003, involves comprehensive infrastructure work including grading, bituminous surfacing, ADA improvements, and signal system revisions. The scope of work requires the contractor to provide all necessary labor, materials, and equipment to complete the project in accordance with the Department of Transportation Standard Specifications for Construction, 2025 Edition. Key deliverables include as-built feature survey memorandums, drainage and signal system mark-up plans, and professional surveyor certifications. Technical requirements include specific grounding electrode system standards and strict labeling for epoxy-coated bars. Contract administration is governed by a combination of quality control performed by the contractor and quality assurance managed by the agency, with electrical and traffic signal systems requiring certification by the Project Engineer. Financial and legal protections include a required bid bond of 5% of the bid total, as well as payment and performance bonds equal to the contract amount. Bidders must comply with prevailing wage laws, EEO regulations, and provide a Disadvantaged Business Enterprise certification. Proposals must be submitted electronically via the ProcureWare website, with specific requirements for non-collusion declarations and responsible contractor certifications. The contract also includes provisions for cost and fuel escalation and mandates that construction surveyors meet all MnDOT 1508 requirements.
Hennepin County

POSTED

about 17 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The contract involves comprehensive rehabilitation work on Murrieta Hot Springs Road, spanning approximately three-quarters of a mile from Whitewood Road to Margarita Road. The scope includes removing and replacing pavement sections that have failed, performing full-width grinding of the existing asphalt surface, and applying an asphalt rubber hot mix overlay to enhance durability. Additional tasks encompass replacing detector loops, installing new signage and striping, conducting surveying activities, and performing miscellaneous concrete removals and replacements. Special attention is required for structural section removal and replacement near the Warm Springs Creek bridge, as well as curb ramps, curb and gutter, spandrel, and cross gutter repairs at the intersection of Weeping Willow Lane and Thoroughbred Lane, all as detailed in the project plans and specifications or as directed by the City Engineer. The project is titled the Murrieta Hot Springs Road Pavement Rehabilitation Project, with solicitation number 24-485 (CIP 13047), issued by the City of Murrieta, California. Bids are due by August 1, 2024, and the project is estimated to cost between 1.5 and 3 million dollars. The work must be completed in accordance with the provided plans, specifications, and special provisions. The primary point of contact for inquiries is Garrett Strang, reachable via email at [email hidden] or by phone at [phone hidden]. The project aims to improve roadway conditions and safety through extensive pavement rehabilitation and related infrastructure upgrades.

General Info

Documents

1
PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Murrieta
Contacts1 person available
OfficeN/A

Full Description

Show more
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above-stated project. The general items of work to be done hereunder consist of: Rehabilitation of Murrieta Hot Springs Road from Whitewood Road to Margarita Road (approximately ¾ of a mile in length) includes removal and replacement of pavement failure sections, full width roadway grinding of existing asphalt, placement of asphalt rubber hot mix (ARHM) overlay, detector loop replacement, signing/striping, surveying, miscellaneous concrete removal and replacement, full structural section removal and replacement adjacent to the Warm Springs Creek bridge, and PCC removal and replacement for curb ramps, curb/gutter, spandrel, and cross gutter at the intersection of Weeping Willow Lane and Thoroughbred Lane as shown on the plans, these special provisions/specifications, or as directed by the City Engineer.

More opportunities from California → City of Murrieta

Same awarding agency

NAICS: 561720
SLED
Street Sweeping Services
Solicitation # 26-008
The City of Murrieta is soliciting proposals for citywide street sweeping services under solicitation 26-008. The contract is for a base five-year term with an option to renew for one additional five-year term, totaling a potential ten-year period. The scope of work includes the sweeping of approximately 300 curb miles of city streets, 446 miles of residential streets on a bi-monthly basis, 59 miles of medians bi-monthly, 76 miles of arterials twice per month, and 24 city-owned parking lots. The city requires the use of natural gas (CNG) vehicles equipped with specific safety markings, including NFPA 52 blue reflective CNG decals, 360-degree LED safety beacons, and DOT-C2 retroreflective conspicuity tape. Contractors must adhere to strict operational hours, with residential sweeping occurring Monday through Friday from 7:00 a.m. to 4:00 p.m., and arterial or facility sweeping conducted between 9:00 p.m. and 7:00 a.m. Performance is monitored via a failure threshold where any gutter line with more than five percent residual debris will fail inspection, requiring a re-sweep at the contractor's expense within 24 hours. Emergency services require a response time within 60 minutes. The selection process is a three-step evaluation involving a technical rating, cost analysis, and optional panel interviews, with a minimum technical score of 70 percent required to advance. Administrative requirements include monthly invoicing and compliance with prevailing wage laws per Labor Code sections 1720 and 1720.9. Proposals must be submitted via the PlanetBids portal by November 23, 2026, and must include a separate Response File and an Excel-based Cost File. Proposers are required to provide proof of insurance and certify non-discrimination and the absence of conflicts of interest. All proposals must remain valid for 90 days from the submission date.
Janitorial Services

POSTED

about 1 month ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS