MWD Rialto Pipeline Treatment Plan for Golden Mussel Mitigation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of Water Resources (DWR) is implementing a targeted chemical treatment plan to prevent the settlement and establishment of golden mussels in the Metropolitan Water District of Southern California’s Rialto Pipeline and associated downstream pipelines by injecting EarthTec QZ at the downstream bulkhead gate slot of Devil Canyon Second Afterbay. All activities are confined within DWR’s right of way, with a 6,300-gallon Ironclad poly cube staged on concrete adjacent to the afterbay structure and surrounded by a 12x25 foot spill berm to ensure secondary containment and prevent environmental release. The project is classified under CEQA Categorical Exemption Class 1, Section 15301, as routine maintenance of an existing facility, with a Notice of Exemption signed by DWR’s Environmental Program Manager on July 15, 2026. The performance location is specifically identified as Devil Canyon Second Afterbay at Mile Marker 412.9 in San Bernardino County, California, with geographic coordinates provided, and all work is to be conducted with zero disruption to water operations. While the scope includes precise application of the treatment and safe chemical handling, no contract value, pricing details, payment terms, invoicing system, or contracting officer information are specified in the available documentation. There are no stated period of performance dates, delivery schedules, FOB terms, or formal evaluation criteria for award. Contact for the project is led by Janine Beck, Environmental Scientist, and Sara Lowry, Environmental Program Manager, with no identification of a formal Contracting Officer’s Representative, Contractor Technical Representative, or Procuring Contracting Officer. No FAR clauses, contract clauses, representations from offerors, socioeconomic certifications, unique entity identifiers, packaging specifications, or special requirements such as security clearances or OCI provisions are present in the provided materials, suggesting these details may reside in supporting or unprovided contractual documents.

General Info

DWR injects EarthTec QZ at Devil Canyon Afterbay to block golden mussels, using containment measures, no cost or duration specified.

Agency

California Water Resources, Department of

NAICS

562910 - Remediation ServicesView NAICS

Place of Performance

Memory Lane, Devil Canyon Road, CA

Set-Aside

NONE

Documents

(1)

NOE MWD Rialto DC2AF Golden Mussel Mitigation

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Janine BeckEnvironmental Scientist
Sara LowryEnvironmental Program Manager

Full Description

Show more
Department of Water Resources (DWR) will inject EarthTec QZ at the downstream bulkhead gate slot of Devil Canyon Second Afterbay to prevent settlement and establishment of golden mussels in the Metropolitan Water District of Southern California’s Rialto Pipeline & downstream member agency pipelines. A 6,300-gallon Ironclad poly cube will be staged immediately next to the afterbay structure on concrete and will be surrounded by a 12x25 foot spill berm for secondary containment. All access and work is within DWR right of way.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
WOJC - Asbestos Abatement (Food Service and Wellness Department)
Solicitation # WOJC – Asbestos Abatement (Food Service and Wellness Department)
Education & Training Resources (ETR) is seeking quotes for a subcontracting opportunity to perform asbestos abatement services at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work involves the removal and disposal of asbestos-containing materials in two primary locations: the Food Service Building (Bldg. 5906) mop room area and the Administration Building (Bldg. 5905) Wellness Department, specifically targeting approximately 10 linear feet of heat pipe insulation in the hallway ceiling. The selected contractor must provide all labor, materials, and equipment, ensuring compliance with EPA, OSHA, and state regulations. Key deliverables include the safe containment and wetting of materials, HEPA vacuuming, and the documented disposal of waste at licensed facilities using appropriate manifests. Final project acceptance requires a signed punch list and applicable warranties, with a third-party hygienist provided by the center for air monitoring and clearance testing. Bids are due by September 11, 2026, and a site walkthrough is scheduled for September 3, 2026. To be considered, applicants must submit a completed bid sheet with a detailed cost breakdown, a proposed service schedule, and all required Massachusetts licensing and credentials. Administrative requirements include a W-9, Vendor Acknowledgement Form, Certificates of Insurance (Builders Risk, Automobile, Liability, and Workers Compensation), and an active SAM.gov registration with a Unique Entity ID (UEI). The contract is subject to various federal regulations, including the Davis-Bacon Act, the Service Contract Act, and FAR clauses regarding anti-lobbying and debarment. Award selection is at the sole discretion of ETR and is not based solely on the lowest bid.
Westover Job Corps Center

POSTED

about 10 hours ago

DEADLINE

in 11 days
View Details