MWWTP Effluent FM Surge & Transient Design Build Services (UN 1282)

Active
27-002State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mattawoman Wastewater Treatment Plant (MWWTP) in Charles County, Maryland, requires turn-key design-build services to manage force main surge and transients. Following a project that increased the effluent pump station's design peak flow to 60 million gallons per day, the County is concerned that cyclical pump operations and potential pump trips could damage the 50-year-old, 54-inch diameter prestressed concrete cylinder pipe and the existing air release valve. The project involves the design and construction of a new 40-foot diameter welded steel standpipe with separate influent and effluent pipes, including a welded steel roof cover, internal ladders, safety cages, and an overflow system. Key technical requirements include the creation of a water hammer model using Bentley HAMMER software to simulate various pump trip events and adherence to NACE II or higher qualifications for the agent. The procurement process is managed by the DPW Capital Project Management office, with proposals evaluated based on a combination of team qualifications, key personnel experience, and proposed price. The project timeline allows for a design phase of up to 270 consecutive calendar days, with construction starting within 270 days of the Notice to Proceed and reaching substantial completion within 420 days of the construction start date. Contractors must provide a 5 percent bid bond, as well as performance and labor and material bonds for 100 percent of the contract price. Additionally, the design-builder must maintain professional liability insurance of at least 2 million dollars per occurrence and aggregate, and all work must comply with ADA standards and prevailing wage requirements.

General Info

Design-build services for a new surge standpipe at Mattawoman Wastewater Treatment Plant.

Documents

32

86-14894 Record Drawings - Mattawoman WWTP

PDF, High priority: read this first11 pages · specifications
High

Closed Loop System Improvements at the Mattawoman WWTP - Contract No. 12-03

PDF, High priority: read this firstspecifications
High

ITB #27-002 - MWWTP Effluent FM Surge & Transient Design Build Services

PDF, High priority: read this firstsow
High

Mattawoman WWTP Effluent Force Main Standpipe Geotechnical Report

PDF, High priority: read this firstspecifications
High

MWWTP Effluent FM Surge & Transient Design Build Services (UN 1282)

PDF, High priority: read this firstrfp
High

MWWTP Effluent PS Force Main Surge Management System Construction - Bridging Documents

PDF, High priority: read this first8 pages · specifications
High

MWWTP PS Site Plan - Charles County Sanitary District No.

PDF, High priority: read this firstspecifications
High

Price Brothers Company Laying Schedule - Charles County, MD

PDF, High priority: read this firstspecifications
High

Project 27-002: Mattawoman WWTP Effluent PS Force Main Surge Management System Technical Specifications

PDF, High priority: read this firstspecifications
High

Proposed Site Piping and Grading Plan - Mattawamon Wastewater Treatment Plant

PDF, High priority: read this firstspecifications
High

RFP 27-002 Addendum 2 - MWWTP Effluent FM Surge & Transient Design Build Services

PDF, High priority: read this firstamendment
High

RFP 27-002 Addendum #3 - MWWTP Effluent FM Surge & Transient Design Build Services

PDF, High priority: read this firstamendment
High

RFP 27-002 Addendum Number One - MWWTP Effluent FM Surge & Transient Design Build Services

PDF, High priority: read this firstamendment
High

Sample Contract - Consecutive Number of Days Specified

PDF, High priority: read this first2 pages · contract-document
High

Submittal E-15100-08-03 - Linestock and Wet Tap Resub

PDF, High priority: read this firstshop-drawing
High

UN 1282 - MWWTP Effluent FM Surge & Transient Design Build Services

PDF, High priority: read this firstrfp
High

Performance and Labor Bonds for Charles County ITB

PDF, Low priority2 pages · bond
Low

Project Close Out Documents - Charles County

PDF, Low priority7 pages · closeout-documents
Low

RFP 27-002 Pre-Proposal Meeting Attendance Roster

PDF, Low priorityattendance-roster
Low

RFP 27-002 Pre-Proposal Meeting Minutes - MWWTP Effluent FM Surge & Transient Design Build Services

PDF, Low prioritypre-proposal-minutes
Low

RFP 27-002 Site Visit Attendance

PDF, Low prioritysite-visit-attendance
Low

75-11900.TIF

TIF

75-11901.TIF

TIF

75-11902.TIF

TIF

75-11903.TIF

TIF

75-119_1.TIF

TIF

75-119_2.TIF

TIF

75-119_3.tif

TIF

75-119_4.tif

TIF

75-119_5.TIF

TIF

75-119_6.TIF

TIF

75-119_9.TIF

TIF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseSolicitation
Posted

Solicitation

Deadline changed

Response deadline changed from Nov 2, 2026 to Nov 9, 2026.

Notice updated

The notice description changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMaryland → DPW - Capital Project Management
Contacts2 people available
OfficeLa Plata, MD, 20646, USA
Office AddressLa Plata, MD, 20646, USA
Contacts
David StegerProject Manager
Latasha MinorSenior Procurement Specialist

Interested Companies (40)

Kokosing IndustrialAnnapolis Junction, MD
Barton & LoguidiceAnnapolis, MD

See All 40 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Mattawoman Wastewater Treatment Plant (MWWTP) is rated for an average daily flow of 20 million gallons per day. In 2020, a major Project to improve he effluent pump station occurred. During this Project, the Design peak flow of the effluent pump station increased to 60 mgd. Treated effluent is pumped two miles through 54-inch diameter, 50-year old prestressed concrete cylinder pipe (PCCP) before transitioning to gravity flow for final discharge into the Potomac River. The County experiences transient surges in their effluent force main when effluent pumps turn on and off, causing the intermediate high point air release valve (ARV) located approximately 7,000 ft. from the pump station to actuate. With the recent increase to design peak flow, the County is concerned that future transient surges caused by cyclical pump operation or multiple pump trips may damage the existing force main and ARV.
Addendum #1: Please use the See What Changed link to view all the changes made by this addendum. Attachments: RFP_27-002_-_Addendum_1_-_FINAL_-_260803.pdf
Official Notice #1: Optional Pre-Proposal Meeting Attendance Roster and Minutes: Attachments: RFP_27-002_-_Pre_Proposal_Meeting_Minutes_-_260730.pdf, RFP_27-002_-_Pre_Proposal_Attendance_-_260730.pdf
Official Notice #2: Optional Site Visit Attendance Roster: Attachments: RFP_27-002_-_Site_Visit_Attendance_-_260813.pdf
Addendum #2: Please use the See What Changed link to view all the changes made by this addendum. Attachments: RFP_27-002_-_Addendum_2_-_FINAL-_260924.pdf
Official Notice #3: Additional as-builts: Attachments: 75-136_MWWTP_PS_Site_Plan.pdf, 75-119_6.TIF, Submittals_54-inch_Concrete_Pipe_by_Price_Brothers_66.75_(as_received_from_Hanson_Pipe).pdf, 75-119_9.TIF, 75-11900.TIF, 75-11901.TIF, 75-11902.TIF, 75-11903.TIF, 75-119_1.TIF, 75-119_2.TIF, 75-119_3.tif, 75-119_4.tif, 75-119_5.TIF, Closed_Loop_Record_drawings_Complete_Set.pdf
Addendum #3: Attachments: RFP_27-002_-_Addendum_3_-_FINAL_-_261021.pdf, REVISED_SHEET_C002_261021.pdf

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
Water Line Replacement on S Center Street and Crane Avenue
Solicitation # 24-022
The City of Turlock, California, is soliciting bids for Project No. 24-022, which involves the water line replacement on S Center Street and Crane Avenue. The scope of work includes the installation of approximately 1,677 lineal feet of new PVC water main pipe and new water service laterals, the removal of existing water main pipe, and the restoration of trenches. The Engineer's Estimate for the project is $1,100,000. Bidders must hold a General Engineering Contractor (A) or Pipeline Contractor (C-34) license and provide a bid bond equal to 10% of the total bid. The contract will be awarded to the lowest responsive and responsible bidder based on licensing, insurance compliance, and relevant experience. The project timeline requires work to commence within ten working days of the Notice to Proceed, with substantial completion due within 60 working days and final completion within 65 working days. Substantial delay damages are set at $2,800 per substantial working day and $700 per final working day. The contractor must provide performance and payment bonds each equal to 100% of the contract price and adhere to California prevailing wage rates. Payment will be made via monthly progress invoices, subject to a 5% retention released approximately 35 days after the Notice of Completion. Proposals are due by 11:30 am on November 4, 2026, via the OpenGov Procurement Portal.
Municipal Services-Engineering

POSTED

about 2 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 19 days
View Details

More opportunities from Maryland → DPW - Capital Project Management

Same awarding agency

NAICS: 237110
New
SLED
Cobb Island and Hill Road Pump Station Improvements (UN 1308\UN 1309)
Solicitation # 27-010
The Board of Commissioners for Charles County, Maryland, is soliciting bids for construction services to improve the Cobb Island and Hill Road sewage pump stations. The scope of work involves the demolition of existing mechanical and electrical equipment from the 1980s and the installation of new process mechanical piping, submersible pumps, HVAC, electrical and control systems, and interior coatings for wet wells and valve vaults. Additional requirements include the installation of new odor control systems, electrical and instrumentation canopies, and civil site work encompassing temporary bypass pumping, erosion and sediment control, final grading, and paving. Specific technical mandates include the use of Type 316 stainless steel for hardware inside manholes and wet wells, and compliance with NEC Class I, Division 1, Group C and D standards for hazardous locations. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of base bid items and contingency items. Bidders must provide a five percent bid bond and demonstrate technical competency through an experience form listing three similar projects. The project is subject to Maryland state law, prevailing wage requirements, and a 9.5 percent MWBE goal. Once awarded, the contractor must submit a schedule of values within ten days of the construction schedule. Payments are issued monthly, subject to a five percent deduction. The completed work is subject to a one-year warranty from the date of final acceptance, and the contractor must provide performance and labor bonds to guarantee fulfillment of the contract.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 6 days
View Details
NAICS: 236220
SLED
Charles County VanGo Maintenance Facility Construction
Solicitation # 27-012
The Board of Commissioners for Charles County is soliciting bids for the turnkey construction of the VanGo Transit Operations and Maintenance Facility in Waldorf, Maryland. Located on a 6.72-acre site, the project involves the complete construction, testing, commissioning, and turnover of an approximately 180,000-square-foot facility designed to support 50 transit buses. The scope of work includes 20,000 square feet of administration and maintenance space, 82,000 square feet of commuter-bus parking, bus and chassis wash facilities, fueling islands, fare-collection facilities, and comprehensive site improvements including grading, drainage, and utility installation. The project is funded in part by Federal and State transit funds administered through the Maryland Transit Administration. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of base bid and contingency items. The successful contractor must complete all work within 547 consecutive calendar days from the Notice to Proceed. Key compliance requirements include adherence to the Davis-Bacon Act for prevailing wages, Buy America and Build America Buy America standards, and 2010 ADA Standards for Accessible Design. Bidders are required to provide a 5% bid bond and must submit all proposals electronically via the County's eProcurement Portal. Performance and labor bonds are required to ensure contract fulfillment and payment for materials and labor.
Commercial and Institutional Building Construction

POSTED

8 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
SLED
On-Call Maintenance, Repair and Upgrade of Utilities Infrastructure
Solicitation # 27-008
The Board of Commissioners for Charles County is soliciting bids for a Task Order Contract to provide on-call construction services for the maintenance, repair, and upgrade of utilities infrastructure, primarily supporting the Department of Public Works. The scope of work includes the removal and reinstallation of various sewage pumps, maintenance of electrical and mechanical equipment, welding, fabrication, and the rehabilitation of water, sewer, and reclaimed water piping systems, including valves, vaults, and manholes. The contract also covers general excavation, site work, and water well repairs. Each contract has a maximum price of 500,000 dollars, though the County may authorize tasks exceeding this amount with prior written approval. The base period begins upon execution and ends on December 31, 2027, with four optional one-year renewals. Award will be granted to the lowest responsive and responsible bidder who has been actively engaged in the field for at least ten years and is in good standing with the State of Maryland. Bidders must submit a 25,000 dollar bid bond and comply with MWBE program requirements for applicable task orders. Performance and payment bonds of 100 percent of the job order price may be required. Contractors are expected to provide monthly invoicing, subject to a 5 percent retainage, and must adhere to prevailing wage laws and strict safety and environmental codes. Final acceptance of work is contingent upon inspection by the Contracting Officer to ensure all services are performed in a skillful and workmanlike manner.
Water and Sewer Line and Related Structures Construction

POSTED

23 days ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS