Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on August 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Myrtle Grove Fire Station 11 - Construction

Closed
PD 25-26.096State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262, with potential options for Buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring, updating electrical distribution with simple dimming controls and new ceiling fans, replacing variable air volume systems, and correcting plumbing deficiencies. The contractor is also responsible for providing new signage and managing the movement and protection of all loose furniture. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using the best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience, with minimum ratings of Satisfactory and Acceptable required, respectively. The contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict quality control, safety, and ADA accessibility standards. Proposals must be submitted electronically to the Contracting Officer by November 9, 2026, and must include a detailed bid schedule in Excel and technical documentation in PDF format.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year warranty, and exterior wall system updates. Interior improvements consist of reconfiguration, new finishes, epoxy mortar flooring, and the installation of a full NFPA-compliant fire suppression system. Infrastructure upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements including paving removal and replacement, drainage upgrades, and hazardous materials abatement. The contract is divided into two primary exhibit line items: ELIN 0001 for building renovation and ELIN 0002 for paving work. Award will be based on the lowest price, and bidders must propose on all line items to avoid rejection. Performance is subject to the Davis-Bacon Act and Buy American requirements. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. Quality control is managed through a three-phase process requiring a government-accepted QC Plan and adherence to various ASTM and NFPA standards. Administrative requirements include monthly invoicing via Wide Area Work Flow using NAVFAC Form 7300/30 and the submission of detailed monthly work-hour and safety reports.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 26 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, categorized under NAICS code 236220, focuses on basin improvements in California, specifically within the Riverside and Los Angeles project areas. The solicitation is designated as a set-aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. The response deadline for this opportunity is November 4, 2026. A critical component of this contract is the strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements, which are expanded from State Water Resources Control Board standards to secure project financing. To avoid being deemed non-responsive, bidders must provide proof of specific actions within their bid package, including posting solicitations in an online publication for 30 consecutive calendar days, a print newspaper posting for at least one day, and documented utilization of the Small Business Administration and Minority Business Development Agency. While outreach documentation such as call logs or emails may be submitted up to three business days after the bid closing, failure to meet the primary posting and agency utilization requirements prior to the opening date will result in disqualification.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes the construction of a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention and utility systems. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and project documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected dormitory rooms, vanity areas, hallways, offices, and conference rooms across the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to Small Businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms. Award will be based on best value, with evaluation weights assigned to price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a W9, a completed vendor questionnaire, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act and specific Executive Orders regarding minimum wage and paid sick leave. Contractors must comply with OSHA safety regulations, NFPA-101 life safety codes, EPA regulations, and all applicable local and state building codes. Insurance requirements include automobile liability coverage of 200,000 dollars per person and 500,000 dollars per occurrence, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

Escambia County is soliciting sealed bids under solicitation number PD 25-26.096 for the construction of the Myrtle Grove Fire Station 11 located at 7209 Lillian Highway in Pensacola, Florida. The project involves the demolition of the existing facility and the construction of a new approximately 12,780-square-foot, three-bay essential facility. This initiative aims to restore a permanent fire-rescue presence in the Myrtle Grove community to improve emergency response times, enhance firefighter safety, and increase system resiliency in one of the county's most densely populated areas. The scope of work includes site clearing, earthwork, and the installation of critical systems such as automatic fire sprinklers, fire alarms, high-efficiency HVAC with dehumidification, and emergency standby power generation. Qualified licensed contractors must submit their bids via the OpenGov e-procurement portal by September 25, 2026, at 10:00 am, with a deadline for questions set for September 8, 2026. The contract requires strict adherence to federal, state, and local codes, including ADA, OSHA, and NFPA standards. Bidders must provide bid security and are subject to evaluation based on their stability and lack of conflict of interest. Required insurance includes general liability with limits of at least 2,000,000 dollars per occurrence and 4,000,000 dollars annual aggregate. Additionally, offerors must submit a Sworn Statement on Public Entity Crimes and comply with Florida's Public Records Act. The county reserves the right to purchase additional quantities for up to 180 days from the date of the offer.

General Info

Escambia County seeks bids for Myrtle Grove Fire Station 11 construction by September 2026.

Documents

4

Myrtle Grove Station 11 Project Manual and Bid Documents

PDF, High priority: read this first875 pages · sow
High

PD 25-26.096 Myrtle Grove Fire Station 11 - Construction

PDF, High priority: read this firstitb
High

PD 25-26.096 Myrtle Grove Fire Station 11 Construction ITB

PDF, High priority: read this first32 pages · itb
High

Myrtle_Grove_Fire_Station_11_Bid_Set_Drawings_8-20-26.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Purchasing
Contacts1 person available
OfficePensacola, FL, 32502-5822, USA
Organization / AgencyFlorida → Purchasing
Office AddressPensacola, FL, 32502-5822, USA
Contacts
Kent JensenPurchasing Coordinator

Interested Companies (79)

Ward HumphreyMarietta, GA
Patriot Roofing & ConstructionNavarre, FL
NuJak CompaniesLakeland, FL

See All 79 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
During a regularly scheduled Board Meeting, the Escambia County Board of County Commissioners voted to replace and add new fire stations to areas of the county that currently do not have adequate fire protection. The Myrtle Grove community has historically been served by the Myrtle Grove Volunteer Fire Department and later by Escambia County Fire Rescue Station 11 on Lillian Highway. Due to the age and condition of the facility, Station 11 has since been removed from active service, requiring neighboring fire stations to absorb the Myrtle Grove response district. While fire protection continues to be provided through automatic and mutual aid responses from surrounding stations, the absence of an active station within the Myrtle Grove community has increased travel distances, reduced response efficiency, and placed additional demand on adjacent response districts. The proposed replacement Myrtle Grove Fire Station 11 will restore a permanent fire-rescue presence within the community, improve emergency response times, enhance firefighter safety, and strengthen overall system resiliency for one of Escambia County's most densely populated service areas.

More opportunities from Florida → Purchasing

Same awarding agency

NAICS: 561730
New
SLED
Dune Matrix Enhancement- Pensacola Beach - National Coastal Resilience Fund NFWF
Solicitation # PD 25-26.118
Solicitation PD 25-26.118 is an Invitation to Bid issued by Escambia County for the Dune Matrix Enhancement project at Pensacola Beach, Florida. Funded by the National Fish and Wildlife Foundation National Coastal Resiliency Fund, the project aims to improve coastal resiliency and biodiversity through the installation of approximately 78,710 units of native vegetation, including sea oats, panic grass, and diversity groundcover. The scope of work also includes the installation of sand fencing, post-and-rope fencing, and signage, as well as the removal of asphalt debris across approximately 24,004 square yards. All planting must utilize a super absorbent polymer pre-hydrating gel and adhere to specific root ball and depth requirements. The contract requires substantial completion within 150 consecutive calendar days from the Notice to Proceed, with total completion due within 180 days, excluding documented weather delays. Bids are evaluated based on responsiveness, responsibility, and price, with the County reserving the right to award on an all-or-none or lot-by-lot basis. Because of the federal funding source, the project must comply with the Davis-Bacon Act for prevailing wages, the Copeland Anti-Kickback Act, and Build America, Buy America requirements for iron, steel, and construction materials. Contractors must provide performance and payment bonds, maintain general liability insurance, and ensure all work complies with OSHA standards and the Americans with Disabilities Act.
Landscaping Services

POSTED

about 21 hours ago

DEADLINE

in 6 days
View Details
New
SLED
Pool Demolition
Solicitation # 26-CD-041
The School Board of Pinellas County, acting through its Superintendent, is soliciting bids for the demolition of the existing pool, pool deck, and pool building at Clearwater High School, including all required infill. The project must be completed within 120 calendar days from the Notice to Proceed, with all utilities left capped in a legal manner. Work must adhere to the State Requirements for Educational Facilities and design documents prepared by Williamson Design Associates and Coastal Design Consultants, Inc. The contractor is responsible for quality control and must ensure all materials and installations meet specific standards, including ASTM specifications for concrete and various Florida and national standards for landscaping and electrical facilities. Bidders must submit their proposals via the OpenGov Procurement portal by November 23, 2026. Required documentation includes original bid proposal forms, a proposed subcontractor list, a notarized sworn statement regarding public entity crimes, a Florida Licensed CGC License, and evidence of five years of operation as a legal entity. The District may conduct interviews or presentations prior to selection. Payment will be processed on the 30th of each month using Owner-provided forms, with the option for payment via purchasing card through JP Morgan. Performance and payment bonds are required, and the project includes a contingency fee of 75,000.00 dollars. Final project closeout requires an AHERA Certification for the absence of asbestos and various notarized waivers and certifications.

POSTED

2 days ago

DEADLINE

in 26 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS