Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Mystic & Noank Library Park Project

Active
18931949State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mystic and Noank Library Park Project, managed by the Connecticut DAS Procurement agency, is a solicitation for Phase 1 of the library landscape master plan. The scope of work encompasses comprehensive site development, including the installation of erosion and sediment controls, clearing and grubbing, selective demolition, and the implementation of site lighting and underground conduits. Infrastructure improvements involve the installation of catch basin tops, area drains, stormwater piping, asphalt paving, and precast concrete curbing. Additional site enhancements include the construction of exposed aggregate concrete sidewalks, concrete and stone stairs, dry laid stone walls, and metal handrails. The project also focuses on environmental landscaping through the planting of native trees, shrubs, and perennials. Interested parties must submit responses by October 2, 2026, with Christine Bradley serving as the primary point of contact for this Connecticut-based project.

General Info

Connecticut DAS solicitation for Mystic and Noank Library Park Phase 1 site development.

Agency

Connecticut → DAS ProcurementView Agency

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

CT, USA

Set-Aside

NONE

Documents

(2)

Mystic-Noank Library Master Plan_Phase 1_Issued for Bid_20260820.pdf

PDF

Mystic and Noank Library Landscape Project Manual for Bidding.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
Contacts1 person available
OfficeCT, USA
Organization / Agency
Connecticut → DAS Procurement
View Agency Profile
Office AddressCT, USA
Contacts
Christine BradleyPrimary Contact

Full Description

Show more
The Mystic & Noank Library Landscape Master Plan Phase 1 work consists of: Installation and maintenance of construction entrance and erosion and sediment controls, clearing and grubbing, selective demolition, site lighting; underground conduits and sleeves, catch basin top, area drain & stormwater piping; asphalt paving; precast concrete curbing; exposed aggregate concrete sidewalks; concrete stairs, stone stairs on concrete; dry laid stone walls; metal handrails; native tree; shrub and perennial plantings; as shown and described in the contract documents.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
Federal
ACC002 Utilities and Infrastructure
Solicitation # W911KB26RWP01
The US Army Corps of Engineers Alaska District is soliciting proposals for the Utilities and Infrastructure Fighter Town Recapitalization at Joint Base Elmendorf Richardson in Alaska. This project represents Phase I of a multi phase program focused on preparing a site of over 500 acres and establishing essential civil utility and airfield infrastructure. Due to complex topography and overlapping construction schedules, the project requires precise sequencing to maintain operational capabilities and support staggered occupancy dates. The procurement is being conducted as an Other Transaction Agreement under 10 USC 2808a, specifically intended for military construction involving new and emergent technologies to improve mission resilience and reduce costs. The project will utilize a Construction Manager at Risk delivery method divided into two primary phases. In Phase 1, the awardee provides preconstruction services to assist the government with scope, budget, quality, and schedule coordination alongside the Designer of Record. In Phase 2, the awardee will propose a Guaranteed Maximum Price once the design reaches a level between 65 and 95 percent. If the government accepts the GMP, the awardee will proceed with construction execution; otherwise, the government maintains an off ramp to pursue alternative construction methods.
W2SN Endist Alaska

POSTED

about 20 hours ago

DEADLINE

in 9 days
View Details
NAICS: 238910
New
Federal
Amendment - 003 - FY26 OTS Rappel Tower Demolition Service
Solicitation # FA3300FY26OTS091462
The Department of Defense, through the 42nd Contracting Squadron at Maxwell AFB, is soliciting firm-fixed price quotations for the professional demolition and removal of the 60-foot wooden Blue Thunder Rappel Tower. This total small business set-aside requires the contractor to provide all personnel, equipment, and materials to dismantle the structure, including the central stair access, decking, railing, vertical supports, and guy wires. The scope of work extends to subsurface support removal to a minimum depth of 4 inches below final grade, legal off-base disposal of all debris at an approved construction and demolition landfill, and full site restoration, including backfilling and replenishing the central sand pit. The period of performance is 30 days, following a pre-performance conference. Award will be granted to the lowest priced contractor that meets minimum technical compliance and security requirements. Contractors must adhere to strict safety and environmental standards, including the establishment of daily exclusion zones, FOD sweeps, and coordination of work schedules with the site manager due to active training in the area. Personnel must possess a REAL ID or valid US Passport for base access. Invoicing shall be processed electronically through the Wide Area WorkFlow system. Quotes are due by September 2, 2026.
FA3300 42 Cons Cc

POSTED

about 20 hours ago

DEADLINE

in 10 days
View Details

More opportunities from Connecticut → DAS Procurement

Same awarding agency