The Defense Supply Center Philadelphia has a requirement for eighty five (5) work stations to be installed in building 26-1. The service will be done in two different parts of the building. Sixty five (65) work stations will be installed in the north east section of the building and twenty (20) work stations will be installed in the south section of the building. The due date for all quotations is December 17, 2007 at 12:00 pm. A site visit is a requirement for this service. If you do not attend a site visit you will not be considered for award. To attain a copy of the solicitation and statement of work, contact Matt Ryan at
+1 (555) 000-0000 or
contact@example.gov. The following is the description of the service: North East: The contractor shall be responsible for providing all labor, tools, expertise, and certified management to perform work station installation. The contractor shall ensure that all work station installation shall be in accordance with manufactures specifications and the blue print provided by DSCP. The contractor shall first, sign in at the front gate of DSCP, at the Security Office, then phone the COR, to escort contractors to the job. The contractor shall use work station building materials provided by DSCP. The contractor shall install approximately 65 (each), 6?x6? work stations. This includes, but not limited to: partitions, flipper door compartments, all electrical parts, baseboards, light fixtures, lamps, table tops, brackets, stick pin boards, hardware, posts, wires, pedestal cabinets, styles, and connectors. The contractor shall clean all work station fabric, partitions, rails, table tops, flipper doors compartments, styles, cove base covers, table tops, pedestal cabinets, lights, hardware, posts, brackets, and stick-pin boards. The contractor shall clean and vacuum rug, and clean cove base. The contractor shall ensure that all storage of tools and materials shall be approved by the COR. The contractor shall remove all trash and debris at the end of each working day from the premises of DSCP. South: The contractor shall provide all labor, tools, expertise, and certified management to complete work station installation. The contractor shall ensure that all work station installation shall be in accordance with manufacturers specifications and a blueprint provided by DSCP. The contractor shall first, sign in at the front gate security Office at DSCP. The contractor shall use the ?Hayworth? type work-station building material, provided by DSCP, at the jobsite The contractor shall install 20(each), 6?x10? workstations in Building 26-1 South/East area of warehouse. This includes, but not limited to work station partitions, table tops, flipper door compartments, all electrical parts, baseboards, stick pin boards, light fixture, pedestal cabinets, brackets, posts, wires, all electrical parts, hardware, styles and connectors. The contractor shall ensure that all storage of tools and material shall be in approved location, by the COR. The contractor shall remove all trash and debris at the end of each working day. The contractor shall note that 4 of the 20 work stations shall include wall hung partitions.