NAVFAC Northwest, Waterfront (WF) Multiple Award Construction Contract (MACC)

Awarded
N44255Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Navy’s NAVFAC Northwest has awarded a $700 million indefinite-delivery, indefinite-quantity multiple award construction contract for waterfront infrastructure projects centered in Silverdale, Washington. Nine contractors were selected to perform a broad range of marine and waterfront construction, including new builds, renovations, demolitions, and repairs for piers, wharves, bulkheads, seawalls, dry docks, marinas, breakwaters, dredging, shoreline protection, and specialized facilities such as sensitive compartmented information spaces. The awardees include Manson Construction Co., DOD Marine Constructors JV, Triton Marine Construction Corp., Michels Construction, Orion Government Services, Kiewit Infrastructure West, Contrack Watts, SLSCO, and Ballard Marine Construction, with performance expected across the Pacific Northwest and other locations as needed. The contract has a total potential duration of up to 60 months, with an anticipated completion date of July 29, 2031, and encompasses both design-build and design-bid-build methodologies. Work will be managed by the CORE Planning Design and Acquisition team operating out of NAVFAC Northwest’s office in Silverdale, and all task orders will be issued through this framework to support U.S. Department of Defense maritime infrastructure needs.

General Info

$700M Navy contract for waterfront construction across Pacific Northwest, 9 firms, up to 60 months.

Contract Value

$47,886,482.6

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Silverdale, WA, 98315, USA

Set-Aside

NONE

Award Issued Date

Documents

146

01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS)

PDF, High priority: read this first16 pages · sow
High

1100+kW Generator Photo Collection

PDF, High priority: read this firstspecifications
High

601+Rev+2 - Technical Specifications and Diagrams

PDF, High priority: read this firstspecifications
High

AB101 First Floor Plan, FY19 MCON Project P-907

PDF, High priority: read this first1 page · specifications
High

AB101 Rev 5 - First Floor Plan

PDF, High priority: read this first1 page · specifications
High

AB104 Roof Plan - FY19 MCON Project P-907

PDF, High priority: read this first1 page · specifications
High

AB111 Rev 1 - Pressure Washer Enclosure Plans

PDF, High priority: read this first1 page · specifications
High

AB501 Rev 1 - Architectural Details Sheet

PDF, High priority: read this first1 page · specifications
High

AB502 Rev 1 – Built-In Storage Alcove Details

PDF, High priority: read this first1 page · sow
High

AB603 Rev 1 – Room Finish Schedules

PDF, High priority: read this first1 page · specifications
High

Amendment 0001

DOCX, High priority: read this first2 pages · amendment
High

Amendment 0001 - N4425520R0003, MCON P907 TPS Pier and Vessel Maintenance Facility

PDF, High priority: read this first2 pages · amendment
High

Amendment 0002 - N4425520R0003 Site Visit Instructions

PDF, High priority: read this first4 pages · amendment
High

Amendment 0003 - Solicitation N4425520R0003

PDF, High priority: read this first2 pages · amendment
High

Amendment 0004 - N4425520R0003

PDF, High priority: read this first2 pages · amendment
High

Amendment 0005 – N4425520R0003 Proposal Due Date Extension

PDF, High priority: read this first2 pages · amendment
High

Amendment 0006 - N44255-20-R-0003 P907 TPS Pier and Vessel Maintenance Facility

PDF, High priority: read this first4 pages · amendment
High

Amendment 0007 - N4425520R0003

PDF, High priority: read this first2 pages · amendment
High

Amendment 0008 - N4425520R0003 MCON P907

PDF, High priority: read this first3 pages · amendment
High

Amendment 0009 - N4425520R0003 P907 TPS Pier and Maintenance Facility

PDF, High priority: read this first3 pages · amendment
High

Amendment 0010 - N4425520R0003 / P907 Pier and Vessel Maintenance Facility

PDF, High priority: read this first5 pages · amendment
High

Amendment 001 - Site Visit and Proposal Due Date

PDF, High priority: read this first2 pages · amendment
High

Amendment #004 – Steel Pipe Piles and RFI Responses

PDF, High priority: read this first7 pages · amendment
High

Amendment #006 - P907 solicitation Q&A and revisions

PDF, High priority: read this first25 pages · amendment
High

Amendment #008 - Drawing and Specification Revisions

DOCX, High priority: read this first1 page · amendment
High

Amendment SF30 – RFP Section 00010 and Small Business Factor Revision

PDF, High priority: read this first6 pages · amendment
High

Attachment J - Washington General Decision WA20200071 Wage Determination

PDF, High priority: read this first13 pages · wage-determination
High

Bangor P-907 TPP Pier 217069 - Section 01 14 00 Work Restrictions

PDF, High priority: read this first348 pages · specifications
High

CS103 Rev 1 - Horizontal Control and Site Plan

PDF, High priority: read this first1 page · specifications
High

CS501 Rev 1 - FY19 MCON Project P-907 TPP Pier and Maintenance Facility

PDF, High priority: read this first1 page · specifications
High

EB101 Rev 3 - Partial Electrical Site Plan

PDF, High priority: read this first1 page · specifications
High

EB131 Rev 1 - Systems Floor Plan

PDF, High priority: read this first1 page · specifications
High

EB603 Rev 1 - Electrical One-Line Diagram

PDF, High priority: read this first1 page · specifications
High

EB605 Rev 3 - Electrical Schedules / Motor and Equipment Wiring Schedule

PDF, High priority: read this first1 page · sow
High

EB609 Rev 1 - Electrical Schedules and Cable Notes

PDF, High priority: read this first1 page · sow
High

EW001 Rev 1 – Electrical Symbols Sheet

PDF, High priority: read this first1 page · specifications
High

EW101 Rev 3 - Electrical Site Plan

PDF, High priority: read this first1 page · specifications
High

EW111 Rev 2 - Pier Power Plan Sheet 1

PDF, High priority: read this first1 page · sow
High

EW122 Rev 1 - Pier Lighting Plan Sheet 2

PDF, High priority: read this first1 page · specifications
High

EW124 Rev 1 - Under Pier Lighting Plan Sheet 1

PDF, High priority: read this first1 page · specifications
High

EW132 Rev 2 - Pier Systems Plan Sheet 2

PDF, High priority: read this first1 page · specifications
High

EW141 Rev 1 - Pier Grounding Plan

PDF, High priority: read this first1 page · specifications
High

EW301 Rev 1 - Electrical Sections Drawing

PDF, High priority: read this first1 page · specifications
High

EW303 Rev 2 - Electrical Sections and Details

PDF, High priority: read this first1 page · specifications
High

EW401 Rev 4 - Electrical Enlarged Plans, FY19 MCON Project P-907

PDF, High priority: read this first1 page · sow
High

EW401 Rev 7 - Enlarged Electrical Plans, FY19 MCON Project P-907

PDF, High priority: read this first1 page · specifications
High

EW404 Rev 1 - Enlarged Plan, P-907TPP Pier and Maintenance Facility

PDF, High priority: read this first1 page · specifications
High

EW404 Rev 3 - Enlarged Plan KB Dock North

PDF, High priority: read this first1 page · specifications
High

EW601 Rev 1 - FY19 MCON P-907TPP Pier and Maintenance Facility 15kV Electrical One-Line

PDF, High priority: read this first1 page · specifications
High

EW602 15kV Electrical One-Line C

PDF, High priority: read this first1 page · specifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

16 updates
PhaseAwarded
Posted

Award Notice

Notice updated

Notice type changed from Award Notice to Presolicitation. Response deadline changed from Dec 23, 2019 to Jun 26, 2020. The notice title changed. NAICS code changed from 541513 to 237990. The notice description changed. The point of contact changed.

Notice updated

Notice type changed from Presolicitation to Solicitation. Response deadline changed from Jun 26, 2020 to Aug 31, 2020. The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Aug 31, 2020 to Sep 7, 2020. The notice title changed. The notice description changed.

Notice updated

The notice title changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Sep 7, 2020 to Sep 10, 2020. The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Sep 10, 2020 to Sep 22, 2020. The notice title changed.

Notice updated

The notice title changed. The notice description changed.

Type Changed

Solicitation → Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice title changed.

Notice updated

Response deadline changed from Nov 10, 2020 to Jan 12, 2021. The notice title changed.

Notice updated

The notice title changed.

Notice updated

The notice title changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice title changed.

Notice updated

The notice title changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Northwest
Contacts2 people available
OfficeSILVERDALE, WA, 98315-1101, USA
Office AddressSILVERDALE, WA, 98315-1101, USA

Full Description

Show more

Contract Award Number:  N4425526D1501-N4425526D1509


Contract Value (Total Contract Value): $700,000,000


PSC: Z2PZ


NAICS: 237990 / 236220


Place of Performance: Silverdale, WA


AWARDEES:


Manson Construction Co. (N44255-26-D-1501)


5209 E. Marginal Way South


Seattle, WA 98134



DOD Marine Constructors, JV (N44255-26-D-1502)


185 Devlin Road


Napa, CA 94558



Triton Marine Construction Corp. (N44255-26-D-1503)


5405 Constance Dr. SW


Bremerton 98312



Michels Construction, Inc. (N44255-26-D-1504) 


817 Main St.


Brownsville, Wisconsin 53006



Orion Government Services LLC (N44255-26-D-1505)


1010 S. 336th St. Suite 202


Federal Way, WA 98003



Kiewit Infrastructure West Co. (N44225-26-D-1506)


2200 Columbia House Blvd.


Vancouver, WA 98661



Contrack Watts, Inc. (N44255-26-D-1507)


6862 Elm Street, 5th Floor


McLean, VA 22101



SLSCO, LTD. (N44255-26-D-1508)


6702 Broadway


Galveston, TX 77554



Ballard Marine Construction, LLC


(N44255-26-D-1509)


727 S. 27th Street


Washougal, WA 98671



Indefinite-delivery indefinite-quantity multiple award design-build or design-bid-build construction contracts, to include new construction, renovation, alteration, demolition, and repair work by DB or DBB for marine piers, wharves, quay walls, bulkheads, sea walls, dry docks, boat ramps, docks and marinas, shore protection, rip rap, breakwaters, wave attenuation, mooring dolphins, buoys, primary and secondary fendering, pile driving, sheet piles, structural repairs, waterfront utilities, dredging and disposal, industrial, maintenance, warehouses, production and administration facilities, special access program facilities or sensitive compartmented information facilities or other similar facilities.


The term of this contract is not to exceed 60 months, with an expected completion date of 29 July 2031. 


Contracting Office Address:  


CORE Planning Design and Acquisition 


NAVFAC Northwest 


1101 Tautog Circle 


Silverdale, WA 98315 

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 15 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 15 hours ago

DEADLINE

in about 15 hours
View Details
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 15 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 20 hours ago

DEADLINE

N/A
View Details

More opportunities from Department Of Defense → Navfacsyscom Northwest

Same awarding agency

NAICS: 237990
Federal
Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract
Solicitation # N4425526R0005
The Naval Facilities Engineering Systems Command (NAVFAC) is soliciting proposals for an Indefinite-Delivery Indefinite-Quantity (IDIQ) Multiple Award Construction Contract (MACC) to support the Shipyard Infrastructure Optimization Program (SIOP) Multi-Mission Dry Dock (MMDD). The project primarily involves heavy and civil engineering waterfront facilities, as well as commercial and institutional construction, located at the Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS and IMF) at Naval Base Kitsap in Bremerton, Washington. The contract has a maximum aggregate estimated value of 15 billion dollars over a potential 10-year period, consisting of a five-year base period and one five-year option. Major task orders are expected to range from 2 billion to 6 billion dollars, though smaller task orders for Early Contractor Involvement and Alternative Technical Concepts may be issued. Each MACC holder is guaranteed a minimum of 1 million dollars. The solicitation is unrestricted and open to full competition, though large businesses must provide an acceptable small business subcontracting plan. Evaluation factors include experience, price, and small business utilization and participation. A key initial component is a seed project task order for Alternative Technical Concepts (ATC) Package 1 Marine, which focuses on innovative strategies to improve cost, schedule, and constructability. This specific effort includes the delivery of an ATC report and a facilitated panel discussion led by the contractor's key personnel. Offerors must be registered in the System for Award Management (SAM) and provide comprehensive documentation, including bonding capacity via a surety form, financial questionnaires, and historical small business utilization data. All work is subject to Davis-Bacon Act wage determinations for Kitsap County, Washington.
Other Heavy and Civil Engineering Construction

POSTED

21 days ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS