Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Energy was posted on November 8, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Nation Renewable Energy Lab, RFP-2024-24045, Exterior Insulation and Finish Systems (EIFS) Repair

Closed
RFP-2024-24045Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238140
New
International
Maplelawn Garden Wall Rehabilitation
Solicitation # NCC-DC-039015-RFP
The National Capital Commission is seeking qualified proponents for the rehabilitation and reconstruction of 285 meters of historic native limestone masonry garden walls at the Maplelawn Garden Estate, located at 529 Richmond Road in Ottawa. The project objectives focus on restoring the structural and aesthetic integrity of the walls, eliminating public health and safety risks, and ensuring long-term durability while preserving the site's historic characteristics. The scope of work includes dismantling existing masonry, salvaging and reinstating stone units, installing new concrete footings, and constructing reinforced concrete retaining walls at the East and South sections. Performance is scheduled to begin with mobilization upon award, followed by demolition and excavation in Spring 2027, foundations in Summer 2027, and masonry reconstruction through Summer and Fall 2027. The contract will be awarded to the top-ranked proponent based on a multi-stage evaluation consisting of mandatory requirements, rated technical criteria, and pricing. Technical evaluation accounts for 60 points, with minimum thresholds required for project experience and approach and methodology, while pricing accounts for the remaining 40 points. Proponents must certify compliance with ethical procurement standards, including the prohibition of child and forced labor, and disclose any use of artificial intelligence in their proposals. Key contractual requirements include maintaining professional liability and errors and omissions insurance of at least 2 million dollars for specific engineering and soil management tasks. Payments are set at NET 30 days, and the contractor must adhere to strict material storage and site maintenance protocols to protect the historical environment.
National Capital Commission

POSTED

about 19 hours ago

DEADLINE

in 13 days

General Info

NAICS

238140 - Masonry Contractors

Place of Performance

Golden, CO, 80401, USA

Set-Aside

SBA

Documents

10

Attachment 4 - Fully Burdened Labor Rate and Expense Proposal Form

XLSX, High priority: read this firstspecifications
High

DOWSIL EIFS Restoration Guide

PDF, High priority: read this firstspecifications
High

Exhibit A - Dryvit EIFS Repair Guide

PDF, High priority: read this firstspecifications
High

Exhibit C - AFUF Window Seal Replacement: Section 072400 EIFS

PDF, High priority: read this firstspecifications
High

Exterior EIFS Repair Statement of Work

PDF, High priority: read this firstsow
High

RFP-2024-24045 EIFS Repair

PDF, High priority: read this firstrfp
High

RFP-2024-24045 - Exterior Insulation and Finish Systems (EIFS) Repair

PDF, High priority: read this firstrfp
High

RFP-2024-24045 Selection Criteria

PDF, High priority: read this firstrfp
High

SUB-2024-24045 - Exterior Insulation and Finish Systems (EIFS) Repair

PDF, High priority: read this firstcontract-document
High

RFP-2024-24045 Notice of Intent to Propose - EIFS Repair

DOCX, Low prioritynotice-of-intent
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Deadline changed

Response deadline changed from Oct 11, 2025 to Oct 11, 2024.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Alliance Sustainable Enrgy-Doecontr
Contacts2 people available
OfficeGolden, CO, 80402, USA
Office AddressGolden, CO, 80402, USA

Full Description

Show more
The Subcontractor shall provide all personnel, labor, management, tools, equipment, and services necessary to ensure that Exterior Insulation and Finish Systems (EIFS) repair and restoration is performed at NREL facilities. The Subcontractor shall ensure that all objectives outlined in this Appendix A - Statement of Work are met in a timely and professional manner. The EIFS Repair agreement will include work such as, but not limited to: - Subcontractor shall provide as-needed Dryvit EIFS repair and restoration. Subcontractor shall follow manufacturer's guidance. - The Subcontractor shall provide all supplies and chemicals as required to complete all tasks outlined in the SOW. Additional details are provided in the Statement of Work attached to this Notice.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS