National Trails Highway (NTH) Bridge 56 Bagdad Ditch - Curb Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Bernardino County Flood Control District is undertaking a routine maintenance project to replace a damaged curb on the north side of National Trails Highway Bridge 56 at Bagdad Ditch, approximately 20.90 miles east of Amboy Road in the unincorporated desert region of San Bernardino County. The existing curb, measuring about 4.7 feet wide by 59 feet long, will be removed and replaced using light equipment such as a rubber tire loader and a rubber track skid steer, all within the existing county right-of-way. The work is a direct response to infrastructure damage caused by a traffic accident on May 22, 2025, and is designed to restore the curb to its original condition without altering the surrounding environment or requiring excavation, vegetation removal, utility relocation, or import/export of materials. Temporary electronic traffic control will be implemented to reduce the roadway to a single lane during construction, ensuring safety while minimizing disruption. The project is expected to take approximately 15 days to complete and will not result in any significant environmental impacts. It is classified as a maintenance activity and does not involve any major construction or expansion. The work is being conducted under the jurisdiction of the San Bernardino Flood Control District, with primary contact information provided by Planner III Ayida Smith, reachable at 909-387-1800 or ayida.smith@dpw.sbcounty.gov. The project was officially posted as a forecast on September 29, 2025, and is located within the city of San Bernardino, California, with no set-aside requirements or NAICS code specified. All activities are confined to the established right-of-way and adhere strictly to approved structural plans.

General Info

Replace damaged curb on National Trails Highway Bridge 56 due to May 2025 accident, within existing right-of-way, 15-day maintenance project.

Agency

California → San Bernardino Flood Control District

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

US 95 and Amboy Road, San Bernardino, CA

Set-Aside

NONE

Documents

(1)

NOE - Bridge 56 Bagdad Ditch - Curb Replacement_ml_20250922_signed

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino Flood Control District
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Bernardino Flood Control District
Office AddressN/A
Contacts

Full Description

Show more
The San Bernardino County Flood Control District (District) is proposing in-kind curb replacement at National Trails Highway Bridge 56 (Bridge No. 54C0259), located at Bagdad Ditch, approximately 20.90 miles east of Amboy Road in the unincorporated desert region of San Bernardino County. The project will remove and replace a damaged curb on the north side of the bridge in accordance with approved structural plans. The curb measures approximately 4. 7 feet wide by 59 feet long. All work will occur within the existing County right-of-way. Construction will be completed using light equipment, including a rubber tire loader and a rubber track skid steer. The project does not involve vegetation removal, excavation, utility relocation, or material import/export. Temporary electronic traffic control will be used to reduce the roadway to a single lane during construction. The work is expected to take approximately 15 days to complete. This routine maintenance activity is necessary to restore infrastructure damaged in a traffic accident that occurred on May 22, 2025, and will not result in significant environmental impacts.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water. The scope requires integrated engineering solutions to meet evolving regulatory standards for drinking water safety, with specialized focus on advanced filtration and extraction technologies tailored to the existing infrastructure at both sites. Work will include site-specific modifications to ensure seamless operational integration while maintaining continuous water service during implementation. This solicitation, issued by Pyramid Building & Engineering, Inc., is designated for Disadvantaged Business Enterprises under the Department of Transportation set-aside program and falls under NAICS code 237310 for Water and Wastewater Pipeline and Related Structures Construction. Proposals must be submitted by September 3, 2026, with primary point of contact John Garrison available for inquiries via phone or email. The project is located entirely within California, with no specified city or zip details provided in the public record, and all contractual obligations are tied to performance at the two designated treatment plants. Participation is open to qualified firms seeking to support critical public health infrastructure improvements in compliance with state and federal water quality mandates.
Pyramid Building & Engineering, Inc.

POSTED

about 6 hours ago

DEADLINE

in 26 days
View Details