Sealed Bids for furnishing all materials, labor, tools, equipment & appurtenances necessary for the construction of the North Columbus Water Resource Facility Finished Water Pump and Chemical Improvements (Project No. 35774-87) will be received at the Columbus Water Works, 1421 Veterans Parkway, Columbus, Georgia 31901, until 2:00 p.m., local time, on May 23, 2024 and then at said location publicly opened & read aloud. The Project includes finished water pumping & chemical feed improvements at North Columbus Water Resource Facility in Columbus, Georgia including the following improvements: 1. Replacing the existing 6,000 gpm NCPS Pump No. 1 with a new 9,000 gpm pump, motor, and electrical conduit and wiring. 2. Upgrading the electrical systems at the North Columbus Pump Station and High Service Pump Station as shown on the Drawings. 3. Replacement of existing chlorine gas system with new 12% bulk sodium hypochlorite feed system, including 6 fiberglass reinforced plastic (FRP) bulk storage tanks, 3 day tanks, and twelve chemical feed pumps. 4. Relocation of the existing PAC feed point to the new Raw Water Chemical Feed Vault, including extension of feed piping in the new chemical trench/ductbank, replacement of the eductor, and replacement of the water booster pump, within the existing PAC silo. 5 Replacement of the existing chlorine dioxide generation system with a new generation system, including replacement of the sulfuric acid tank, feed pumps, & water booster pump, within the existing Chemical Building. 6. Replacement of pretreatment chemical feed lines, including alum, PAC, chlorine dioxide, liquid lime, polymer,& pre-chlorine (sodium hypochlorite), with Schedule 80 PVC in a new concrete chemical trench or duct ban. All chlorine gas solution lines will be replaced as part of the conversion to sodium hypochlorite. 7. Replace or modify the ventilation equipment in the Chlorine Storage Building & the basement of the Operations Building & as shown on drawings.