This Solicitation opportunity from Department Of State was posted on September 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
NEC - Warehouse Parking Lot
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation 19PM0726Q0018 is a request for quotes from the U.S. Embassy in Panama City for the construction of a reinforced concrete parking lot at the New Embassy Compound warehouse. The project involves converting an existing gravel path into a 10-space parking lot, encompassing earthworks, subgrade stabilization, aggregate base installation, and the construction of 5,000 psi monolithic concrete pavement. The scope includes the installation of concrete curbs, wheel stops, ADA-compliant ramps, and sidewalks. Technical specifications were refined through two amendments, which aligned the parking lot elevation with existing sidewalks, eliminated the need for utility relocation, removed the storm drainage trench/grille structure, and reduced the total pavement area by approximately 140 square meters. The contract is not a small business set-aside and will be awarded to the responsible quoter offering the lowest acceptable price. The performance period is 60 business days following the Notice to Proceed, with work commencing within 10 calendar days of that notice. Key requirements include the provision of an English-speaking on-site supervisor and strict adherence to OBO 2025 Facilities Standards, AASHTO, ASTM, and ACI guidelines. Offerors must be registered in the System for Award Management and submit their quotations electronically by September 11, 2026. Payment terms are set at 30 days, and the government requires a comprehensive quality control plan including laboratory and field testing for subgrade, base course, and concrete strength.
General Info
Contract Value
$88,107.28Place of Performance
PANAMA, PA-8, PANSet-Aside
Awardee
STORE Q PANAMA SAAward Issued Date
Timeline
Submission Closed
Organization & Contact Information
Full Description
Dear Prospective Offeror:
Subject: Request for Quotes NEC - Warehouse Parking Lot
Enclosed is a Request for Quotes (RFQ) for 19PM0726Q0018 NEC - Warehouse Parking Lot. If you would like to submit a quotation, follow the instructions in Section J of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard Form that follows this letter.
The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial proposals, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.
AMENDMENT / MODIFICATION OF SOLICITATION No.: 19PM0726Q0018 – NEC - Warehouse Parking Lot Amendment No.: 0001 Date: August 25th, 2026.
- Purpose of Amendment This amendment is issued to extend the solicitation closing date and to incorporate substantive technical clarifications resulting from the Pre-Proposal Conference/Site Visit held on August 11, 2026.
- Extension of Closing Date The solicitation due date and time is hereby extended as follows:
Previous due date: August 25, 2026, 03:00 PM (local time) New due date: August 31, 2026, 03:30 PM (local time)
No quotations will be accepted after this new date and time.
- Summary of Substantive Changes
The following clarifications and changes are incorporated into the solicitation and supersede any prior answers issued in the Q&A:
a. Parking Lot Elevation / Level Changes The overall parking lot level will be set to match the existing concrete warehouse sidewalk elevation. As a result:
- Existing manholes and infrastructure will remain at their current levels — no demolition or lowering is required.
- No relocation of existing utilities (sanitary sewer, storm drainage, electrical manholes) is required; no differential leveling will be needed.
b. High-Voltage Electrical Boxes Due to the elevation change described above, de-energization coordination with the COR for high-voltage catch boxes will no longer be necessary, as these boxes will not be modified.
c. Curb Detail The curb detail will remain Type A. Because the parking lot level will match the sidewalk elevation, curbs will not run along the sidewalk in that area.
d. Base Material at Curb/Gutter Areas For any remaining curb/gutter Type B condition, all base material must be new — reuse of existing crushed rock base is not permitted.
e. Contract Performance Period The contract completion period is extended from 45 business days to 60 business days after Notice to Proceed (NTP). Offerors should refer to the Holiday list published in Section J of the RFQ when planning the schedule.
f. Updated/Additional Documents Incorporated by this Amendment The following revised and additional documents are hereby incorporated into the solicitation, superseding their previous versions where applicable:
- Attachment 2 – Statement of Work, Revision 02
- Attachment 3 – Drawings, Revision 02 (Sheets 1/4 through 4/4)
- Preproposal Conference Minutes, dated August 13, 2026
- 60-Day Construction Schedule Template (for planning purposes)
- Effect on Quotations All other terms and conditions of the solicitation remain unchanged. Offerors who have already submitted a quotation may submit a revised quotation reflecting these changes prior to the new closing date.
- Acknowledgment Offerors must acknowledge receipt of this amendment in accordance with Section J of the RFQ, either by signing and returning a copy of this amendment, or by identifying the amendment number and date on the quotation submitted.
AMENDMENT / MODIFICATION OF SOLICITATION No.: 19PM0726Q0018 – NEC - Warehouse Parking Lot Amendment No.: 0002 Date: September 9, 2026.
This amendment is issued to modify the technical scope of the Statement of Work and drawings, offering a scope-reduction option to offerors.
Previous due date: August 31, 2026, 03:30 PM (local time) New due date: September 11, 2026, 03:30 PM (local time)
Scope Modifications:
- Concrete pavement shall be 5,000 psi without synthetic fiber reinforcement (eliminates SOW Section 11.3 fiber requirement).
- The specified welded wire mesh reinforcement is replaced with 3/8" rebar at 0.10 m spacing, both directions.
- The storm drainage trench/grille structure is eliminated from the scope of work (revises SOW Section 12).
- The concrete pavement area in the hatched section near the 14.00 m reference line (adjacent to the existing warehouse sidewalk) is reduced by approximately 140 m².
All other terms, conditions, and requirements of the solicitation remain unchanged.
Offerors must acknowledge receipt of this amendment in accordance with Section J of the RFQ.
Your quotation must be submitted electronically to pnmprocreq@state.gov It is important to make sure the submission is made in specific size and format; in MS-Word 2007/2010 or MS-Excel 2007/2010 or Adobe Acrobat (pdf) file format.
In order for a quotation to be considered, you must also complete and submit the following:
- 1. SF-18 fully filled.
- 2. Section A, Pricing.
- 3. Section L Representations and Certifications.
- 4. Additional information as required in Section J.
- 5. Proof of SAM Registration.
Offerors shall be registered in the SAM (System for Award Management) database at https://www.sam.gov prior to submittal of their offer/proposal. Failure to be registered at time of proposal submission may deem the offeror’s proposal to be considered non-responsible and no further consideration will be given. Therefore, offerors are highly encouraged to register immediately if they are interested in submitting a response to this requirement.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS