Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has issued a Lake and Streambed Alteration Agreement under Section 1602 of the Fish and Game Code to Emily Neuroth for the Neuroth Stream Crossing Project, identified by Notification No. EPIMS-MEN-56354-R1C. This authorization permits the replacement of an existing culvert at a stream crossing located approximately one mile east of Dos Rios in Mendocino County, within the Eel River watershed. The scope of work involves excavation, removal of the old culvert, installation of a new culvert embedded 12 inches into the streambed, backfilling and compaction, and the application of rock armoring for erosion control. Specifically, a 36-inch median diameter (D50) rock riprap energy-dissipating apron will be installed at the outlet, while 24-inch D50 rock armoring will be applied along both inlet and outlet embankments. All work must strictly comply with the most recent version of the notification dated August 25, 2025, and is subject to regulatory exemptions under California Code of Regulations, Title 14, Sections 15301, 15302, and 15304, which classify the project as a minor alteration with minimal environmental impact. This action is a regulatory permit approval, not a federal procurement, and therefore does not involve pricing, contract types, or competitive award processes. The project is not subject to Federal Acquisition Regulation clauses, solicitation numbers, or federal contracting requirements such as small business set-asides, payment terms, invoicing systems, or evaluation factors. The permittee, Emily Neuroth, is responsible for executing the work in accordance with the technical specifications and environmental protections outlined in the notification. Oversight and acceptance are the responsibility of the California Department of Fish and Wildlife, Northern Region, with John Herrera, Senior Environmental Scientist, serving as the primary point of contact. The agreement was executed on November 20, 2025, and must be completed in line with the August 25, 2025, notification version. Submission was made through the EPIMS online portal, with digital documentation in PDF and other standard formats accepted. No cost estimates, financial line items, or delivery terms are provided, as the instrument is a permit for environmental compliance rather than a procurement contract.

General Info

Emily Neuroth permitted to replace culvert in Mendocino County with rock armoring under California environmental regulations.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

approximately one mile east of the town of Dos Rios, CA

Set-Aside

NONE

Documents

(1)

EPIMS-MEN-56354-R1C Neuroth Stream Crossing Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
John HerreraSenior Environmental Scientist Specialist
Emily NeurothPlease contact John Herrera of CDFW

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MEN-56354-R1C, pursuant to Section 1602 of the Fish and Game Code to Emily Neuroth. The Project is limited to one encroachment. The proposed encroachment is to upgrade an existing stream crossing culvert. Work for this encroachment will include excavation, removal of the existing culvert, replacement with new properly sized culvert, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. The culvert will be embedded 12 inches into the streambed. The crossing will have a rock riprap energy dissipating apron in the stream channel below the outlet, consisting of 36-inch median diameter (D50) rock. In addition, 24-inch D50 rock armoring will be used for the embankment along the sides of the inlet and outlet of the culvert. All work will be completed as specified in the most recent version of the Notification dated August 25, 2025.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 18 hours ago

DEADLINE

in 24 days
View Details