The County of Riverside Transportation Department is undertaking the resurfacing of approximately 1,350 feet of New Chicago Avenue, stretching from East Florida Avenue/State Highway 74 to Lincoln Avenue, within the community of Valle Vista. This project involves full removal of the existing asphalt pavement and reconstruction with hot mix asphalt, along with the rebuilding of asphalt dikes, concrete cross gutters, and spandrels to restore the road’s structural integrity. Additional work includes relocating existing utilities, restriping the roadway with new pavement markers and reflectors, removing and replacing traffic signs, and reinstalling traffic inductive loop detectors. The road, classified as a Local Road under the County’s General Plan, is currently two lanes wide with widths ranging from 27 to 53.5 feet and is being improved within its existing footprint without any right-of-way acquisition. The project is exempt from full environmental review under CEQA Section 15301(c) as it constitutes maintenance of an existing facility and is covered under the Western Riverside County Multiple Species Habitat Conservation Plan, with mandatory migratory bird nesting surveys required between February 1 and September 1. All work must comply with County transportation standards and engineering practices. The project is administered via internal work orders, including ZD10066C and ZD50060C, with funding traced to an ACRN of 537280-20000-3130500000 and processed through a journal voucher system rather than formal federal or state procurement mechanisms. There is no publicly listed contract value, solicitation number, or formal bidding process documented, and no contract clauses, evaluation factors, or offeror certifications are included in the materials. Payment and oversight are handled internally, with Lisa Ann Wadley serving as the Contracting Officer’s Representative and Frances Segovia as the primary point of contact for project planning. Proposals are to be mailed to Mail Stop #2136, Attention: Lisa Wadley, though no submission deadline or formal proposal requirements such as format, page limits, or electronic portal instructions are specified. The project is forecasted as active with a posted date of November 18, 2025, but no period of performance, delivery schedule, FOB terms, or contract type are defined in the documentation.

General Info

Resurface 1,350 feet of New Chicago Avenue with asphalt, rebuild utilities and signage, no bidding, internal funding, bird surveys required.

Agency

California → Riverside County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

New Chicago Avenue Resurfacing Project Notice of Exemption June 27, 2025

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Riverside County
Office AddressN/A
Contacts
Frances SegioviaSenior Transportation Planner

Full Description

Show more
The County of Riverside Transportation Department is proposing to resurface approximately 1,350 feet (0.26 miles) of New Chicago Avenue from East Florida Avenue/State Highway 74 (SH-74) to Lincoln Avenue. The County of Riverside General Plan classifies New Chicago Avenue as a Local Road. This road is currently two-lanes and ranges from 27 to 53.5 feet wide with cross gutters, asphalt concrete dikes, and spandrels. The proposed improvements consist of removing the existing roadway followed by paving back with hot mix asphalt (HMA). The project will include the following: • Reconstruction/construct asphalt dikes. • Reconstruction of concrete cross gutters and spandrels. • Remove/relocate existing utility. • Restriping of roadway, including pavement markers and reflectors. • Salvage/removal and installation of new signs. • Reinstallation of traffic inductive loop detectors.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 18 hours ago

DEADLINE

in 24 days
View Details