Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on July 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ottawa River East Pathways (OREP) Rehabilitation Project

Closed
NCC-DC-040796-RFPInternational

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The National Capital Commission is seeking qualified proponents to deliver construction services for the rehabilitation of the New Orchard Twin Bridge on the Kichi Zibi Mikan Parkway, a critical multi-use pathway connecting New Orchard Ave. to the Trans Canada Trail. The project aims to extend the bridge’s operational life by at least 30 years through comprehensive structural and surface repairs including partial-depth concrete removal and replacement on abutments, wing walls, bearing seats, soffits, fascia, deck, and deck ends; removal and replacement of concrete curbs, sidewalks, and curtain walls; installation of new crash-tested railings; replacement of waterproofing systems and asphalt pavements; bearing and approach slab replacement; and repair of flagstone slope protection. Work must comply with ASTM standards for steel pipe, zinc coatings, and stainless-steel tubing, as well as specific construction specification sections covering demolition, concrete, metal fabrications, and earthwork. All materials must be delivered in original factory packaging, clearly labeled with manufacturer details, compliance standards, and color codes, with asbestos-containing materials requiring secure containment and bilingual warning labels. Materials must be stored off the ground in clean, dry, ventilated areas and protected from damage, with defective items replaced at no cost to the NCC. The procurement is a Negotiated Request for Proposals (NCC-DC-040796-RFP), with a submission deadline of June 30, 2026, at 2:00 PM EDT, requiring proposals to be submitted in three separate emails with strict file format and size restrictions. Proposals must include a completed Submission Form, Pricing Form, Certificate of Insurance, and Bonding Verification Letter—all of which are pass/fail gates—and must be solely in English or French. Evaluation is based on a best-value approach where proponents must achieve a minimum technical score of 70 out of 100, with 40 points awarded for Approach and Methodology and 30 points for the qualifications of the Lead Project Manager and Lead Site Superintendent, although the scoring for the remaining 30 points is unspecified. Contractors must maintain Commercial General Liability insurance of at least $5 million per occurrence and annual aggregate, with the NCC named as an additional insured, and must hold a valid security clearance with designated personnel possessing minimum Site Access status and submitting fingerprints through a Company Security Representative. The contract requires adherence to strict labor and human rights standards, including prohibition of child and forced labor, and compliance with ethical procurement certification. Work mobilization is targeted

General Info

NCC seeks proposals for New Orchard Twin Bridge rehabilitation to extend lifespan 30+ years.

Agency

Government of Canada → National Capital CommissionView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Canada, CAN

Set-Aside

NONE

Documents

(57)

Addendum 02 to RFP NCC-CP-PR-040433 for Ottawa River East Pathways Rehabilitation

PDFamendment

378_09 – Réfection du sentier Capital – Rive est de la rivière des Outaouais - Cahier des charges

PDFsow

NCC-DC-040796-RFP New Orchard Twin Bridges Appendix E Bid Form

PDFbid-form

New Orchard Ave. Twin Bridges Rehabilitation Issued for Tender May 1 2026

PDFsow

Addenda No. 3 for NCC-DC-040796-AON Ponts Jumelés de l'Avenue New Orchard

PDFamendment

NCC-DC-040796-RFP Addendum No. 2 for New Orchard Twin Bridge

PDFamendment

Capital Pathway Rehabilitation Ottawa River East Drawings DC2035-25

PDFdrawings

Appendix G-B Specifications - Project Construction Specifications

PDFspecifications

NCC-DC-040796 Unit Price Schedule for New Orchard Avenue Twin Bridges

PDFunit-price-schedule

Addenda No. 2 for NCC-DC-040796-AON New Orchard Twin Bridges

PDFamendment

CCN-DP-PR-040433-Réseau de sentiers - Appel d'offres négocié

PDFrfp

NCC DC-040796 RFP New Orchard Twin Bridges Appendix E Bid Form

PDFbid-form

Statement of Work for Pathway Rehabilitation Project

PDFsow

Addenda No. 1 for CCN-DP-PR-040433 Trail Rehabilitation Project

PDFamendment

RFP Addendum 03 NCC-DC-040796-RFP New Orchard Twin Bridge

PDFamendment

ANNEXE G. B Specifications - Mai 2026

PDFspecifications

Statement of Work for Pathway Rehabilitation Project NCC

PDFsow

Addendum 04 for NCC-CP-PR-040433-RFP Capital Pathways Rehabilitation

PDFamendment

Contract 22-5100E Pricing Form for Ottawa River Pedestrian Pathway

XLSXpricing-form

Contract NCC-DC-040796-RFP New Orchard Twin Bridge

PDFcontract-document

NCC-DC-040796 AON Ponts Jumelés de l’avenue New Orchard - Formulaire de Prix

XLSXprice-form

Addendum 03 to RFP NCC-CP-PR-040433 Ottawa River East Pathways Rehabilitation

PDFamendment

New Orchard Ave Bridges Rehabilitation IFT Specs May 2026

PDFspecifications

Contract 22-5100E NCC Ottawa River East Pathway Rehabilitation Pricing Form

XLSXpricing-form

NCC-DC-040796-RFP New Orchard Twin Bridge Appendix E Bid Form

XLSXrfp

Addenda No. 2 to Solicitation CCN-DP-PR-040433 Rehabilitation Project

PDFamendment

DC2035-25 Rehabilitation of Sentier de la Capitale Rivière - des - Outaouais Est - Drawings Annex

PDFsow

Addenda No. 3 to Solicitation CCN-DP-PR-040433 Rehabilitation Project

PDFamendment

NCC-DC-040796-RFP New Orchard Twin Bridge Contract

PDFcontract-document

NCC-DC-040796-RFP Addendum 4 New Orchard Twin Bridge

PDFamendment

Capital Pathway Rehabilitation Ottawa River East Drawings DC2035-25

PDFdrawings

Addenda No. 4 for NCC-DC-040796-AON New Orchard Twin Bridges

PDFamendment

Addendum 01 to NCC-DC-040796-RFP New Orchard Twin Bridge

PDFamendment

NCC-CP-PR-040433-RFP-Capital Pathways Rehabilitation

PDFrfp

NCC-DC-040796-RFP Addendum 3 for New Orchard Twin Bridge

PDFamendment

Addendum 01 for Ottawa River East Pathways Rehabilitation Project RFP NRF#NCC-CP-PR-040433

PDFamendment

NCC-DC-040796-RFP New Orchard Twin Bridge Rehabilitation

PDFrfp

Appendix G-B Specifications - Project Construction Specifications

PDFspecifications

NCC-DC-040796-RFP New Orchard Twin Bridges Negotiated Request for Proposals

PDFrfp

Addendum 03 for NCC-DC-040796-RFP New Orchard Twin Bridge

PDFamendment

NCC Contract for Ottawa River East Pathways Rehabilitation Project

PDFcontract-document

NCC-CP-PR-040433-RFP Capital Pathways Rehabilitation Project

PDFrfp

NCC-DC-040796-AON Ponts Jumelés de l’avenue New Orchard

PDFaon

Contrat NCC-DC-040796-AON - Ponts Jumelés de l’avenue New Orchard

PDFcontract-document

NCC-DC-040796-RFP Addendum 01 for New Orchard Twin Bridge

PDFamendment

Annexe G - New Orchard Ave Bridges Rehab IFT Specs FR

PDFspecifications

Annex A - New Orchard Ave Bridges Rehab IFT Specs

PDFspecifications

NCC-DC-040796-RFP Addendum 4 New Orchard Twin Bridge

PDFamendment

NCC-DC-040796-RFP Addendum No. 2 for New Orchard Twin Bridge

PDFamendment

NCC Contract for Ottawa River East Pathways Rehabilitation Project

PDFcontract-document

Contrat CCN Projet Réhabilitation Sentiers Rive Est Rivière Outaouais

PDFcontract-document

New Orchard Ave. Twin Bridges Rehabilitation Issued for Tender May 1 2026

PDFspecifications

NCC Ottawa River East Pathway Rehabilitation Pricing Form Contract 22-5100E

XLSXpricing-form

NCC DC-040796 RFP New Orchard Twin Bridges Appendix E Bid Form

XLSXrfp

New Orchard Ave. Twin Bridges Rehabilitation Issued for Tender May 1 2026

PDFspecifications

Addendum 1 - FR_0 for NCC-DC-040796-AON Ponts Jumelés de l'Avenue New Orchard

PDFamendment

Addenda No. 4 to Solicitation CCN-DP-PR-040433 Rehabilitation Project

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → National Capital Commission
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → National Capital Commission
View Agency Profile
Office AddressN/A
Contacts
Guy Alex CubahiroContracting Authority

Full Description

Show more
The NCC is inviting experienced and qualified proponents to submit proposals for construction services for the Ottawa River East Pathways Project (OREP). The project involves the rehabilitation of 12 sections of pathway between the paved OREP to the gravel pathway along the Ottawa River. Proponents will need to demonstrate their ability to deliver practical, effective solutions and work collaboratively to achieve project objectives.

More opportunities from Government of Canada → National Capital Commission

Same awarding agency

NAICS: 237130
International
New Underground Electric Service System
Solicitation # NCC-CS-041053-NRFP
The National Capital Commission has issued a Negotiated Request for Proposals, solicitation number NCC-CS-041053-NRFP, for the installation of a new underground electric service system at Jacques-Cartier Park North in Gatineau, Quebec. The primary objective is to establish a permanent, higher-capacity power supply to support major events, such as Winterlude, and reduce reliance on diesel generators. The scope of work is divided into two phases: Phase 1 focuses on core infrastructure and civil works near Laurier Street, including the installation of a new Hydro-Quebec infrastructure, a 600 V electrical entrance, and low-voltage distribution for the park and Maison du Vélo. Phase 2 is an optional scope extending the distribution to secondary kiosks and additional pull manholes. The project requires the removal of existing electrical infrastructure and the installation of a main 600 V switchboard and 208 V kiosks. Contractors must adhere to strict environmental and safety standards, including the implementation of tree protection, erosion and sediment control, and excess soil management plans. All work must be completed and the contractor demobilized by Winter 2027/2028, as the site will be required for other uses starting in spring 2028. Award selection is based on a multi-stage evaluation of mandatory requirements, technical capabilities, and pricing, with the top-ranked proponent entering direct contract negotiations. Required security includes performance and labour and material payment bonds, each equal to 50 percent of the project value.
Power and Communication Line and Related Structures Construction

POSTED

9 days ago

DEADLINE

in 18 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS