New Well #8 and Pipeline Replacement Project

Forecast
2026071097State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Frazier Park Public Utilities District is implementing the New Well #8 and Pipeline Replacement Project in Kern County, California, with funding sought from the State Water Resources Control Board's Division of Drinking Water. The project consists of two primary infrastructure components: the installation of a new potable water well, designated as District Well #8, located west of the intersection of Mt. Pinos Way and Frazier Mountain Park Road, and the replacement of approximately 18,300 lineal feet of potable water distribution pipelines. The pipeline work will span the Summit Area, Lower Summit Area, and Texas Trail, with most installations occurring within existing road rights-of-way using standard trenching methods. The project is subject to the California Environmental Quality Act, with a Mitigated Negative Declaration adopted to ensure environmental compliance. Technical support for the project includes a comprehensive suite of appendices covering hydrogeologic studies, air quality and greenhouse gas analyses, and biological and cultural resource assessments. The installation of the replacement pipelines is estimated to take between 45 to 60 working days, while the drilling of Well #8 using a Direct Rotary Rig is expected to take 14 to 21 days. Project administration is led by General Manager Jonnie Allison, with environmental consulting provided by Tom Dodson & Associates.

General Info

Frazier Park Public Utilities District installing new well and replacing 18,300 feet of pipeline.

Place of Performance

Mt Pinos Way and Frazier Park Mountain Road, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Frazier Park Public Utility District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Jonnie AllisonGeneral Manager

Interested Companies (1)

Tom Dodson & AssociatesSan Bernardino, CA

Full Description

Show more
The Frazier Park Public Utilities District (FPPUD or District) is proposing to implement two water infrastructure Projects in the near future for which the District is seeking funding from the State Water Resources Control Board’s Division of Drinking Water (DDW). The first Project is a new potable water well, proposed District Well #8. The second Project is the replacement of approximately 18,300 feet of District potable water distribution pipelines in three of the District’s service areas, Summit Area, Lower Summit Area, and Texas Trail. The well drilling rig (Direct Rotary Rig) will be brought onto the site to drill the well. This will require about two to three weeks (14-21 days). Once Well #8 is completed, the equipment will be brought onsite to complete the well for production. Most of the 18,300 lineal feet of 8” pipeline (of the District’s total of approximately 100,000 lineal feet) within these areas will be installed within existing road rights-of-way (ROW), with a few alignments located on undisturbed land immediately adjacent to developed areas. The pipelines will be installed using standard trenching methods.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional requirements include the installation of new gravity sewers, manholes, stormwater facilities, and site restoration. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and compliance with M/WBE requirements, including the submission of Good Faith Efforts forms. Bidders must adhere to strict technical standards, such as AWWA Specification C-600 for pipelines and NEMA standards for motors. Contract administration is managed by Willis Engineers on behalf of the City of Belmont, utilizing EJCDC standard forms for agreements and payment applications. Required security includes performance and payment bonds, and insurance providers must typically maintain an A.M. Best rating of A-VII or better.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 1 day
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement