Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Massachusetts was posted on September 2, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Next-Generation Model Component Design

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Orange County Managed Lanes Segment Advancement Study C265256
Solicitation # C265256
The Orange County Transportation Authority is soliciting professional services for the Orange County Managed Lanes Segment Advancement Study, identified as Agreement No. C265256. The primary objective of this firm fixed price contract is to evaluate existing, planned, and potential managed lane facilities in Orange County to identify up to two priority segments most suitable for advancement into the Project Initiation Document phase. The study is estimated to take 18 months and is budgeted at 350,000 dollars. The scope of work is divided into four primary tasks: project management and coordination, segment inventory and priority selection, priority segment advancement assessment, and the delivery of a final study report with supporting technical files. The selection process is based on identifying the proposal most advantageous to the Authority, with a competitive range and a potential Best and Final Offer phase. Awarded consultants must provide key personnel, maintain comprehensive insurance, and adhere to Level 1 Health, Safety and Environmental Specifications. Administrative requirements include monthly electronic invoicing with a ten percent retention fee, which is released upon final acceptance. The contract is managed by Project Manager Carolyn Mamaradlo and Senior Contracts Administrator Josie Mellen, with all proposals required to be submitted electronically via the OpenGov Procurement portal by November 30, 2026.
Planning-Planning & Analysis

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements
Solicitation # BPM059336
The Town of Port Deposit, in coordination with WILMAPCO, is seeking a multidisciplinary planning and engineering consultant to implement an integrated safety and mobility project for the Susquehanna River Road corridor. The scope of work focuses on establishing a context-sensitive safety strategy using the Safe System Approach, determining safe multi-modal access to the planned Hopkins Quarry Park, and evaluating the feasibility and preliminary design of a shared-use path between Granite Avenue and Octoraro Park. The project aims to produce an actionable 30 percent design and basis-of-design package by June 30, 2027, with the potential for future progression to final Plans, Specifications, and Estimates. This is a qualifications-based selection process where the contract will be awarded to the most qualified firm based on equal weighting of their proposed team and key staff, project approach, and related experience in rural corridor safety and riverfront access. Compensation and detailed scope will be negotiated after the selection of the highest-ranked firm; therefore, no fee or price information should be included in the technical proposal. The project is initially funded by the Wilmington Area Planning Council and the Maryland Department of Transportation Kimberly Lamphier Bikeways Grant Program. Selected consultants must provide proof of financial capacity, a bid affidavit, and professional liability insurance of at least 1,000,000 dollars per occurrence, while adhering to federal civil rights and non-discrimination provisions.
Town of Port Deposit

POSTED

about 12 hours ago

DEADLINE

in 19 days
NAICS: 541330
New
SLED
Engineering and Traffic Surveys Supporting the Town's Speed Limits to Continue Radar Enforcement
Solicitation # 27-004
The Town of Los Gatos, through its Parks and Public Works agency, is soliciting proposals for solicitation number 27-004 to conduct engineering and traffic surveys across 65 designated roadway segments and all existing school zones. The primary objective is to renew the surveys supporting prima facie speed limits to ensure continued legal radar enforcement in compliance with the California Vehicle Code and AB 382. The selected consultant, who must be a California-licensed Professional Engineer qualified in traffic engineering, will perform speed data collection on 31 high-volume segments using radar and 34 low-volume segments using 24-hour mechanical counters. The scope also requires a review of three years of accident history, field checks of each segment, and the delivery of a final engineering report in searchable PDF format containing 85th-percentile speeds and a speed-limit recommendation matrix. The contract is for a one-year term beginning in January 2027 with no option for renewal. Proposers must submit electronic bids by November 27, 2026, and will be evaluated through a two-phase process consisting of a pass/fail responsiveness check followed by a 100-point scoring system based on qualifications, work plan, price, and references. Awardees must maintain significant insurance coverage, including 2 million dollars in general liability, 1 million dollars in automobile liability, and 1 million dollars in professional liability. The agreement includes strict non-discrimination requirements with potential liquidated damages of 100 dollars per day for non-compliance and allows for termination by either party with 15 days written notice. Payment is structured as monthly invoicing with net 30-day terms.
Parks and Public Works

POSTED

about 12 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Next-Generation Model Component Design subcontract, issued by the Metropolitan Area Planning Council in Massachusetts, focuses on the creation of conceptual frameworks for advanced model components. The primary objective is to develop designs for activity-based, freight, and equity impact modeling to support future implementation efforts. Interested parties must submit their responses by the deadline of October 3, 2025. This opportunity is categorized under NAICS code 541330, reflecting its focus on engineering services related to the design of these specialized modeling frameworks.

General Info

Documents

This scope was carved out of BD-26-1217-MAPC1-MAPC1-120397.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Modeling consultant for travel demand capacities

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → Metropolitan Area Planning Council
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design conceptual frameworks for advanced model components including activity-based, freight, and equity impact modeling for future implementation.

More opportunities from Massachusetts → Metropolitan Area Planning Council

Same awarding agency

SLED
OFF50 & ITC73 - Audio Visual Solution for Boston Regional MPO
Solicitation # BD-27-1217-MAP05-MAP05-134471
The Metropolitan Area Planning Council is soliciting bids under solicitation number BD-27-1217-MAP05-MAP05-134471 for a qualified vendor to assess, recommend, design, and install audiovisual solutions for multiple collaboration spaces at the Boston Region Metropolitan Planning Organization office in Boston, Massachusetts. The goal is to implement reliable and scalable technology to support in-person, hybrid, and virtual meetings. The project includes the procurement of equipment such as microphones and ceiling-mounted speakers, and requires the selected vendor to perform testing and commissioning of all systems. The award will be granted to the responsible bidder offering the lowest total value, encompassing construction, labor, and all installed media equipment. Eligible vendors must be OFF50 or ITC73 contract holders with at least five years of experience and a proven track record of completing similar government projects within the last three years. Mandatory requirements include a site walk-through, submission of an OSHA compliance form, and the provision of at least two professional references. All labor must be performed at the prevailing wage, and construction materials and labor costs are capped at 50,000 dollars. Proposals must include itemized pricing, equipment specifications, warranty details, and an installation timeline. Quotes are to be submitted via email to [email hidden], with a response deadline of November 4, 2026.

POSTED

14 days ago

DEADLINE

in 7 days
View Details
SLED
FCAM 2027 Ambulances
Solicitation # BD-27-1217-MAP03-MAP03-133954
The Metropolitan Area Planning Council is soliciting sealed bids under solicitation number BD-27-1217-MAP03-MAP03-133954 to provide industry standard compliant ambulances, vehicles, and associated equipment for the members of the Fire Chiefs Association of Massachusetts. The contract is an open market agreement that commences upon execution and continues through June 30, 2027, with the potential for five additional six-month extensions. Bids must be submitted via the CommBUYS portal by November 2, 2026. Award decisions will be based on the lowest price for specified goods or services, resulting in multiple awards to responsive and responsible bidders for individual line items by manufacturer. To be considered responsive, bidders must submit all required forms, including a Statement of Competency, a Certificate of Non-Debarment, and a Certificate of Compliance with M.G.L.c. 151B. Responsibility will be determined based on financial stability and at least three customer references from the last three years. Technical requirements include specific standards for rust proofing, sound deadening, and reflective marking, such as chevron striping and the Star of Life. Bidders must also attest to minimum quality requirements and maintain adequate insurance throughout the contract term. Buyers retain the option to inspect vehicles at local service facilities or their own sites prior to final acceptance.

POSTED

30 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS