Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

NextGen Submarine Rescue System (SRS) Post-Industry Day Informational Packet and RFI

Active
N00024-27-R-6116Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Navsea HQ, specifically PMS 390 Undersea Special Mission Systems Submarine Rescue, is conducting market research via solicitation N00024-27-R-6116 to inform the acquisition of two Next Generation Submarine Rescue Systems (SRS). These systems are intended to replace the legacy Submarine Rescue Diving and Recompression System (SRDRS) by leveraging modified commercial off-the-shelf deep-submergence and marine diving technology. The program is structured into a design phase and a build phase, with a goal of maturing a design to a Critical Design Review baseline within 24 months. Key performance parameters include aircraft transportability and Time To First Rescue. The government is currently evaluating various acquisition strategies, including Other Transaction Authority and FAR-based contracts, with a formal solicitation expected in Q2 or Q3 of FY27 and a tentative award in Q4FY27. Future plans include a FAR-based production contract for three to four operational fleet systems and sustainment services estimated for FY2033. Interested parties must address statutory participation requirements for Nontraditional Defense Contractors or small businesses, or demonstrate the financial capacity for a mandatory one-third cost-share. The government emphasizes an open architecture approach to prevent proprietary restrictions on system integration and sustainment. Responses to this RFI are due by November 16, 2026.

General Info

Navsea seeks market research to acquire two Next Generation Submarine Rescue Systems.

NAICS

336611 - Ship Building and Repairing

Place of Performance

DC, USA

Set-Aside

NONE

Documents

3
PDF, High priority: read this firstrfi
High
PDF, Low priorityq-and-a
Low
PDF, Low priorityindustry-day
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

event

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsea Hq
Contacts2 people available
OfficeWASHINGTON NAVY YARD, DC, 20376-5000, USA
Office AddressWASHINGTON NAVY YARD, DC, 20376-5000, USA

Full Description

Show more

The purpose of this notice is to provide the post-Industry Day informational packet (updated unclassified Industry Day presentation material and the finalized Q&A response), as well as an RFI for interested parties to inform the PMS 390's acquisition approach for the next-generation submarine rescue system.


⚠️ Important Notices & Disclaimers


  • Public Q&A: The Government may post a sanitized version of all RFI responses stemming from this notice to the Procurement Integrated Enterprise Environment (PIEE) and System for Award Management (SAM) websites.
  • No Commitment: This notice is for market research and information gathering only. It is not a Request for Proposals (RFP) and does not commit the U.S. Government to issue a solicitation or award a contract.
  • No Reimbursement: The Government will not reimburse any costs associated with preparing information or responding to this announcement.

Similar Contracts

Same NAICS industry code

NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation Fish and Wildlife Department is seeking a factory-certified Honda Marine Authorized Dealer to perform a complete propulsion repower and helm system integration for a 30 foot Munson Packman landing craft. The project is divided into six phases, beginning with the decommissioning and removal of two Honda BF250A outboard engines and incompatible rigging, followed by the installation of two new Honda BF250D Drive-by-Wire outboards. The scope includes integrating new Honda iST electronic control heads at primary and secondary helm stations, interfacing with the existing SeaStar Power Assist steering and NMEA 2000 network, replacing fuel lines with USCG Type A1-15 hoses, and installing new digital gauges and ignition switches with safety tethers. The project concludes with static diagnostics and a minimum two hour sea trial to validate performance and safety protocols. The selected contractor must provide a secure facility for vessel storage and submit a firm-fixed price proposal by November 13, 2026. Evaluation is based on a 100 point scale considering technical capability and budget, with a specific preference for responsible Indian Offerors. Contractual requirements include commercial general liability insurance of at least 1 million dollars per occurrence, a 25 percent retainage or a performance bond for contracts exceeding 100,000 dollars, and adherence to the Colville Tribal Employment Rights Ordinance. All disputes are subject to the jurisdiction of the Colville Tribal Court, and payments are contingent upon the availability of tribal funds.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in 10 days
View Details
NAICS: 336611
New
Federal
Propulsor Device Machining
Solicitation # N0016727Q1004
The Naval Surface Warfare Center Carderock Division (NSWCCD) is soliciting quotes for solicitation N0016727Q1004 to perform propulsor component machining for VIRGINIA Class propulsor devices. This firm-fixed-price contract is a total small business set-aside under NAICS 336611. The scope of work involves the fabrication of various piece parts, including body tubes, top caps, bottom caps, center masses, and shim rings. While the government provides raw materials for most components, the contractor is responsible for procuring mild steel ASTM A106 for the R4 shim rings. The period of performance extends from the date of award through July 18, 2027, with specific delivery dates for various line items requested by July 30, 2027. Award will be granted to the responsible quoter who provides a technically acceptable quote representing the best value, specifically the lowest evaluated price. Technical acceptability is determined on a pass/fail basis, and the government may consider past performance via the Supplier Performance Risk System (SPRS). Contractors must maintain a Quality Management System compliant with ANSI/ASQ/ISO 9001:2015 and meet CMMC Level 2 cybersecurity requirements. Deliverables include lot acceptance inspection results, certificates of conformance, and monthly progress reports. All parts must be cleaned with acetone and marked with unique item identifiers per MIL-STD-130 before being shipped to destinations in Bethesda, Maryland, or Kittery, Maine. Questions are due by November 4, 2026, and final quote packages must be submitted by November 12, 2026.
Nswc Carderock

POSTED

about 12 hours ago

DEADLINE

in 9 days
View Details
NAICS: 336611
New
Federal
USS OKANE (DDG-77); 7MRB0604 Standalone
Solicitation # N5523627R0007
The Southwest Regional Maintenance Center intends to award a competitive Firm-Fixed Price supply contract for the preservation, hull, mechanical, and electrical/electronic repairs of a Willard 7-meter Rigid Inflatable Boat (RIB), hull 7MRB0604, and its associated trailers for the USS OKANE (DDG-77). This total small business set-aside, categorized under NAICS code 336611, is anticipated to be solicited on November 18, 2026. The period of performance is approximately eleven months, beginning January 25, 2027, and concluding with craft delivery by October 22, 2027. Work must be performed at a contractor facility within a 50-mile radius of Naval Base San Diego. The scope of work includes comprehensive labor, supervision, and quality assurance to return the craft to mission-ready status. Key technical requirements involve the installation of a new 230 horsepower Framework 2.2 engine with associated electrical components, extensive surface preparation achieving 95 percent abrasion, and a like-new paint finish on all gel coated surfaces. The contractor is also responsible for procuring new boat trailers and installing a boat alteration placard. Compliance with NAVSEA Standard Items and NSTM Chapters 583 and 631 is required. Acceptance is contingent upon successful completion of contractor bay trials and a final two-hour government waterborne trial to verify all repairs.
Southwest Regional Maintenance Center

POSTED

about 12 hours ago

DEADLINE

in 15 days
View Details
NAICS: 336611
New
Federal
USCG STA PANAMA CITY (45633) FY27 DRYDOCK REPAIRS
Solicitation # 70Z0U0327SSBPL8678
The U.S. Coast Guard Surface Force Logistics Center has issued a Sources Sought Notice and Request for Information under solicitation number 70Z0U0327SSBPL8678 to conduct market research for FY27 dry-dock repairs for the USCG STA PANAMA CITY (45633). This effort is intended as a total Small Business Set Aside under NAICS code 336611. The government is seeking to identify capable prime contractors who can provide the necessary facilities, materials, equipment, and personnel to perform comprehensive repairs at the contractor's own dry dock facility. Key work items include general welding, ultrasonic testing, hull plating and fendering system inspections, diesel fuel tank cleaning, and the removal and installation of engines, as well as preservation of the water jet drive and underwater body. Interested parties must be registered in the System for Award Management and are requested to provide business size certification, past performance evidence for similar projects, and a statement confirming their intent to submit a proposal as a prime contractor. Future award considerations will be based on economic factors and geographical and transit considerations, including overall distance, fuel stops, and berthing services, while adhering to geographical restrictions defined in LANTAREAINST 3100.1G. This notice is for market research purposes only, and no formal solicitation currently exists.
CG-SEA-C23

POSTED

about 12 hours ago

DEADLINE

in 9 days
View Details
NAICS: 336611
New
Federal
USCGC HAMMER (WLIC 75302) USCG 68A BARGE (68014) DRYDOCK REPAIRS FY2027
Solicitation # 70ZU0127QPBPL0001
Solicitation 70ZU0127QPBPL0001 is a Request for Quotations issued by the Department of Homeland Security, Coast Guard, for the Fiscal Year 2027 drydock repairs of the USCGC HAMMER (WLIC 75302) and the USCG 68A Barge (68014). This is a Total Small Business Set-Aside under a Firm Fixed Price contract with a proposed period of performance from January 6, 2027, to March 17, 2027, contingent upon Congressional Appropriation. The contractor must provide a facility accessible from a navigable waterway in Jacksonville, Florida, capable of supporting the safe arrival and departure of the vessels. The scope of work encompasses comprehensive maintenance, preservation, and repair services, including hull plating renewal, ultrasonic side scan testing, propulsion shafting overhaul, tank preservation, and the renewal of sea valves and strainers. Specific requirements include the provision of an independent Level 3 NACE Inspector and adherence to SFLC Standard Specifications for welding, drydocking, and preservation. Award will be based on the most advantageous offer, evaluating technical capability, project planning, experience with DoD and USCG surface vessels, and price. Quotations are due by November 9, 2026, and must include a cover letter, price schedule, and documentation of past performance and technical capability.
CG-SEA-C21

POSTED

about 12 hours ago

DEADLINE

in 6 days
View Details

More opportunities from Department Of Defense → Navsea Hq

Same awarding agency

NAICS: 336611
New
Federal
ex-CGN9 Long Beach Dismantlement and Disposal
Solicitation # N0002426R4164
Solicitation N0002426R4164 is a Request for Proposal from NAVSEA HQ for the transport, dismantlement, and disposal of the ex-Long Beach (CGN 9) cruiser, including its defueled reactor plants. The scope of work requires the contractor to prepare the vessel for transport from PSNS&IMF in Bremerton, Washington, move it to a disposal site via heavy lift vessel or submersible barge, and execute complete dismantlement and disposal. Key requirements include the transport of two defueled reactor vessels to a commercial low-level radioactive waste disposal site and strict adherence to NRC radiological regulations and decommissioning plan requirements. The period of performance for the primary tasks is scheduled from April 1, 2027, to September 30, 2032. The government will award a Firm-Fixed-Price contract based on a best-value tradeoff, evaluating proposals on technical/management approach, past performance, and price. The contract structure includes specific CLINs for transport and dismantlement, a non-separately priced CLIN for data deliverables, and a three million dollar incentive fee for radiological regulatory compliance. Security is a critical component, requiring the protection of Unclassified Naval Nuclear Propulsion Information (U-NNPI) and U.S. citizenship for key personnel. Additionally, the contractor must provide a 20 percent performance bond prior to taking possession of the vessel and submit a Small Business Participation Commitment Document as part of the proposal.
Ship Building and Repairing

POSTED

1 day ago

DEADLINE

in 10 days
View Details
NAICS: 336611
New
Federal
USS MAKIN ISLAND (LHD 8) FY28 Docking Selected Restricted Availability (DSRA) Request for Proposal(s)
Solicitation # N0002426R4421
The Naval Sea Systems Command (NAVSEA) is soliciting proposals for the USS MAKIN ISLAND (LHD 8) Fiscal Year 2028 Docking Selected Restricted Availability (DSRA). This Signature Availability is a comprehensive effort combining maintenance, modernization, and repair, requiring a contractor with substantial West Coast facilities, including a capable pier and dry-dock. The scope of work encompasses integrated production scheduling, structural welding, cabling, piping, electrical, and ventilation work, as well as overhauls of the propulsion plant, electric plant, and auxiliary systems. The government intends to award a single Firm-Fixed-Price contract in or before March 2027, with performance beginning in November 2027 and an expected completion date of October 30, 2029. The procurement will be awarded based on Best Value using trade-off source selection procedures. Evaluation factors include Technical Eligibility and Physical Resource Capacity, Past Performance, Manpower, Small Business Participation, Schedule and Execution Approach, and Price. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 23, 2026. While the total contract value is not specified, the government estimates 211,989 direct labor hours and 9,547,892 dollars in materials for growth work, with a maximum available incentive of 15 million dollars for milestone events. Due to the complexity and magnitude of the requirement, this procurement is not set aside for small businesses.
Ship Building and Repairing

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 333415
Federal
Shipboard Air Conditioning Plant System Sustainment Plan (SSP)
Solicitation # N0002427R4452
Navsea HQ is conducting market research via a sources sought notice to identify capable providers for the Shipboard Air Conditioning Plant System Sustainment Plan. The objective is to establish a standardized approach to improve the materiel condition and operational availability of centrifugal, reciprocating, and rotary air conditioning plants on U.S. Navy surface ships worldwide. The government is evaluating various acquisition strategies, including a single-award Indefinite Delivery, Indefinite Quantity contract or multiple awards, to cover a broad scope of maintenance, engineering, and logistics services. The required capabilities are divided into six primary areas: executing Major AC Plant Pit Stops and providing embedded technical expertise at Shore Intermediate Maintenance Activities, both of which must adhere to a mandatory maintenance window of six weeks or less. Additionally, the scope includes the provision of OEM materiel, the management of a global warehouse and rotable pool for Overhaul Parts Packages, and the delivery of configuration-specific engineering and integrated product support. Finally, the contractor must be able to provide global unplanned and emergent field services to restore plant capability at Navy locations worldwide. Interested sources must submit their capabilities and supporting evidence by November 16, 2026.
Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

POSTED

11 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS