Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Hawaii was posted on August 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NH-072-1(057) Kal Hwy Resurfacing Makai Pier to Hanauma Bay Rd

Closed
B27000255State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation activities including land surveying, site clearing, shoring, and subgrade roadbed work. Additional requirements encompass environmental services like storm water pollution prevention, the installation of utilities, manholes, traffic signals, lighting, and landscaping, and the supply of materials such as ready mix and precast concrete. This solicitation is open to qualified Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a final response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 19 days
NAICS: 237310
New
SLED
SB Minor B 03A4243 - Bicycle Railing Installation - Placer County
Solicitation # 03A4243
The California Department of Transportation is soliciting bids for contract 03A4243, which involves the installation of bicycle railings at the Maple Street Overcrossing on Route 80 in Auburn, Placer County. This is a Small Business Minor B set-aside project with an estimated cost of $253,000.00. The contract will be awarded to the lowest responsible bidder who is a certified small business at the time of bid opening and award. The project must be completed within 20 working days, and the scope includes the implementation of temporary traffic control systems and the installation of traffic stripe tape meeting specific retroreflectivity and durability standards. Bids must be submitted via email to [email hidden] by November 12, 2026, and any bid exceeding $484,000.00 will be rejected. While no specific DVBE goal is established, participation is encouraged. The successful bidder will be required to provide a payment bond if the bid exceeds $25,000, along with certificates of insurance, a Payee Data Record, and Postconsumer-Content Certification. All construction materials must comply with Build America Buy America standards under 2 CFR 184.6. Payment for contracts of 20 working days or less is made after contract acceptance, while longer contracts allow for progress payments via itemized invoices.
California Department of Transportation

POSTED

about 4 hours ago

DEADLINE

in 14 days
NAICS: 237310
New
SLED
SB Minor B-Install passageway for emergency vehicles-San Diego County
Solicitation # 11A4469
The California Department of Transportation is soliciting bids for contract 11A4469 to install a passageway for emergency vehicles in San Diego County. This is a Small Business Minor B set-aside, requiring bidders to be certified as a small business by the Department of General Services by 5:00 p.m. on the bid opening date. The scope of work includes traffic control, electrical system installation for detectors, environmental controls such as temporary water pollution and concrete washout facilities, and the installation of signage and pavement markings. The project is governed by 2025 Standard Specifications and Standard Plans, with specific requirements for Buy America compliance and strict quality standards for local materials, including pH and lead concentration limits. Bids must be submitted exclusively via email to [email hidden] by November 12, 2026, as hard copies will not be accepted. Any bid exceeding 484,000.00 dollars will be rejected per Public Contract Code 10105(b). The contract will be awarded to the lowest responsible bidder within 30 days of the bid opening. Successful awardees must provide payment bonds and insurance at the time of award and complete the Payee Data Record and Standard Agreement forms. Payment terms vary based on project duration, with progress payments available for contracts exceeding 20 working days, provided the work meets specifications and the value exceeds 5,000 dollars.
California Department of Transportation

POSTED

about 4 hours ago

DEADLINE

in 14 days

AI Contract Overview

Show more

Federal-Aid Project No. NH-072-1(057) is a highway resurfacing project for Kalanianaole Highway on the island of Oahu, spanning 5.28 miles from Makai Pier to Hanauma Bay Road. The scope of work includes cold planing, resurfacing, reconstruction of weakened pavement, and widening of paved shoulders. Additional infrastructure improvements involve upgrading grated inlets, culverts, headwalls, guardrails, and end treatments, as well as installing a new crosswalk, rumble strips, pavement markings, signage, and adjusting utility manholes. The estimated construction cost is between 32 million and 33 million dollars, with a performance period of 480 working days from the start date. The contract will be awarded to the lowest responsible bidder based on the total amount for comparison of bids. Bidders must submit proposals via HIePRO, including a bid security of 5 percent of the total bid amount. The project is subject to several regulatory requirements, including the Davis-Bacon Act for prevailing wages, Buy America and Build America, Buy America (BABA) Act provisions for materials, and ADA compliance for access routes. Environmental and operational constraints include adherence to a National Pollutant Discharge Elimination System (NPDES) stormwater permit and a community noise variance extended through December 31, 2029. Quality assurance involves rigorous inspection of materials, including independent testing for guardrail galvanizing and adherence to Hawaii DOT Highways Division sampling and testing guides.

General Info

Highway resurfacing on Oahu costing $32-33 million with a 480 working day period.

Documents

9

Addendum No. 4 - Kalanianaole Highway Resurfacing (NH-072-1(057))

PDF, High priority: read this firstamendment
High

Addendum No. 5 - Kalanianaole Highway Resurfacing (NH-072-1(057))

PDF, High priority: read this firstamendment
High

Kalanianaole Highway Resurfacing Addendum No. 2

PDF, High priority: read this firstamendment
High

Kalanianaole Highway Resurfacing Addendum No. 3 (NH-072-1(057))

PDF, High priority: read this first2 pages · amendment
High

NH-072-1(057) Addendum No. 1 - Kalanianaole Highway Resurfacing

PDF, High priority: read this firstamendment
High

NH-072-1(057) Kalanianaole Highway Resurfacing - Notice to Bidders

PDF, High priority: read this firstifb
High

NH-072-1(057) Kalanianaole Highway Resurfacing Plans

PDF, High priority: read this firstsow
High

Docket No. 24 NR-VN07 Decision and Order – Noise Variance

PDF, Low priorityspecial-notice
Low

R10H019.FNL.24 Renewal NGPC - Kalanianaole Highway Resurfacing

PDF, Low priority3 pages · permit-notice
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 16, 2026 to Sep 16, 2026.

Deadline changed

Response deadline changed from Sep 16, 2026 to Oct 30, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyHawaii → Department of Transportation
Contacts2 people available
OfficeHI, USA
Office AddressHI, USA
Contacts
Edwin Sniffen

Full Description

Show more
The scope of work consists of cold planing, resurfacing, reconstruction of the weakened pavement areas, widening paved shoulders, upgrading grated inlets, upgrading and repairing existing culverts and headwalls, upgrading existing guardrails and end treatments, installation of new crosswalk, centerline and reference survey monuments, milled centerline and rumble strips, pavement markings and signage, and adjusting utility manholes.

More opportunities from Hawaii → Department of Transportation

Same awarding agency

NAICS: 238210
New
SLED
DOT-HAR-E-27-2 Commercial Harbor Cargo Yard Lighting Maintenance
Solicitation # DOT-HAR-E-27-2
The Hawaii Department of Transportation is soliciting proposals for solicitation number DOT-HAR-E-27-2 to provide commercial harbor cargo yard lighting maintenance and restore services across the islands of Oahu, Hawaii, Maui, and Kauai. This open-ended contract covers a thirty-six month period of performance and requires the contractor to provide all labor, materials, and equipment for the inspection, repair, and restoration of lighting systems, including upgrades to the Ubicquia Ubivu light control system. To be eligible for award, bidders must possess a valid State of Hawaii Specialty Contractor C-13 license and comply with all current electrical codes and federal and state labor and safety laws. The contract will be awarded to the lowest responsive and responsible bidder on an island-by-island basis, though a single bidder may be awarded combined contracts if they are the lowest bidder for multiple islands. Bidders must submit proposals for all items within an island group to be considered. Payment is administered via purchase orders for specific trouble calls or task orders based on the unit prices provided in the proposal schedule. The State reserves the right to withhold payment for incomplete documentation and may conduct inspections at any time, including representatives from federal agencies if federal funds are utilized. Proposals must be submitted electronically via HIePRO by the December 2, 2026 deadline.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 562211
SLED
HWY-ME-26-008 Furnishing Environmental Response Services
Solicitation # B27000616
Solicitation B27000616, also identified as HWY-ME-26-008, is an indefinite quantity, as-needed contract issued by the Hawaii Department of Transportation to provide environmental response services on the Island of Maui. The scope of work involves responding to incidents that pose imminent threats to the public or environment on state highways and rights-of-way. Key responsibilities include the gathering, identification, hazard categorization, segregation, packaging, transport, manifesting, and disposal of hazardous materials, debris, pollutants, and waste. The contractor must ensure areas are left free of obstructions and smears and must comply with all federal, state, and county environmental regulations. The contract will be awarded to the lowest responsive and responsible bidder. To qualify, bidders must demonstrate at least two consecutive years of experience in environmental response services and possess certifications in hazardous material handling, waste packaging, OSHA 40-hour HAZWOPER, DOT hazardous material training, and confined space entry. Additionally, bidders must provide tax clearance and certificates of compliance from the State of Hawaii. The contract allows for an initial term with the possibility of four additional twelve-month extensions, not to exceed a total of 60 months, with a maximum price escalation of two percent per extension. Performance is monitored by state inspectors, and the contractor is required to provide performance and payment bonds upon execution.
Hazardous Waste Treatment and Disposal

POSTED

8 days ago

DEADLINE

in 14 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS