Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Niblick Road Complete and Sustainable Bike and Pedestrian Enhancements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Niblick Road Complete and Sustainable Bike and Pedestrian Enhancements Project, led by the City of Paso Robles in California, aims to improve safety and accessibility for非motorized users through the construction of a new multi-use path, additional sidewalks, ADA-compliant accessibility features, and visibility enhancements such as signage and lighting to better separate pedestrians and bicyclists from vehicle traffic. The project spans Niblick Road from Spring Street to Creston Road and is subject to compliance with the California Environmental Quality Act, having received approval under a Mitigated Negative Declaration with adopted mitigation measures and a finding of consistency. Funding and oversight involve both the City of Paso Robles and the California Transportation Commission, with the Office of Land Use and Climate Innovation acting as a key administrative partner. Although the project is publicly posted and tracked through state environmental portals, it does not constitute a federal contract and contains no FAR clauses, federal acquisition regulations, or federally mandated procurement clauses. There is no stated contract value, no defined period of performance, and no formal solicitation number or contract type designated beyond a "special-notice" classification. The procurement process lacks detailed evaluation factors, submission guidelines, or required certifications typically found in federal contracts, and no information is provided on payment terms, invoicing procedures, or contractor representation requirements such as UEI or small business status. Point of contact for the project includes Ditas Esperanza, Capital Project Engineer for the City of Paso Robles, and Cherry Zamora, Associate Deputy Director with the California Transportation Commission. All work must be performed at the project site in San Luis Obispo County, California, and acceptance will be managed by the City of Paso Robles under state-level environmental and infrastructure compliance standards, with no reference to defense logistics, packaging, or federal inspection criteria.

General Info

City of Paso Robles builds bike/pedestrian path on Niblick Road with state funding and environmental compliance.

Agency

California → City of Paso Robles

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for Niblick Road Bike and Pedestrian Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Paso Robles
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Paso Robles
Office AddressN/A
Contacts
Cherry ZamoraAssociate Deputy Director
Ditas EsperanzaCapital Project Engineer

Full Description

Show more
The project includes construction of bicycle and pedestrian improvements. The project includes a new multi-use path, new sidewalks, accessibility improvements, and visibility improvements to protect pedestrians and bicyclists from vehicle traffic.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will revitalize the entry and exit drives along 19th Ave W, along with the former Downie Building (C-14) footprint and surrounding parking areas. Existing pavement in deteriorated condition will be milled and resurfaced, while aging stormwater infrastructure will be fully replaced and expanded to divert runoff from combined sewer lines into dedicated storm drainage systems, with water quality treatment incorporated where qualifying pavement surfaces are replaced. The remaining concrete slab from Phase 1 will be demolished to make way for a blended layout of new parking spaces and native green space designed as a pollinator habitat, potentially housing a stormwater treatment facility. An irrigation system will be installed to support the new landscaping, which will also extend to the median along the entry drive. New electric vehicle charging stations will be integrated into the expanded parking area, and a protected two-way bike lane will be constructed to connect the terminal’s entry directly to the West Wall bike path, enhancing multi-modal accessibility. Pedestrian pathways will be upgraded to improve connectivity to the intersection of 21st Ave W and W Emerson Pl, as well as the adjacent King County Metro bus stop. Lighting will be enhanced throughout the newly configured parking and path areas, and comprehensive wayfinding systems will be implemented to guide pedestrians and cyclists through the redeveloped campus. The project is forecasted to be solicited under NAICS code 237310 by the Port of Seattle’s Waterfront Project Management office, with primary contact information provided for project inquiries and coordination.
Waterfront Project Management

POSTED

about 9 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Unit Price Portwide 2026The contract encompasses a broad range of pavement and infrastructure maintenance activities across multiple Port of Seattle locations including Seattle-Tacoma International Airport, Maritime Properties, and adjacent areas. Work includes new asphalt paving and patching, overlays with fabric, crack sealing, seal coating, profile grinding, haul and disposal of grinding spoils, removal of existing striping, surface preparation for new markings, various stripe painting, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, sidewalk lifting and leveling, and drainage system enhancements. All work requires adherence to performance standards and may involve obtaining necessary permits for improvements to public infrastructure. This procurement is issued under the title Asphalt Paving & Striping Unit Price Portwide 2026 by the Port Construction Services division of the Port of Seattle. The solicitation is posted as a forecast with a NAICS code of 237310 indicating highway and street construction. Primary point of contact is Heather Bowden, with Lesley Miles serving as project manager; inquiries should be directed via their provided email addresses and phone numbers. The contract will be administered across numerous port-wide sites with performance expected to meet specified technical and safety requirements, though no specific location details are provided in the data. The forecast date of July 31, 2026, suggests this is a planning notice for future work, not an active solicitation.
Port Construction Services

POSTED

about 9 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
ITB 26-141 Small County Outreach Program (SCOP) Milling & Resurfacing Project for E. Gospel Island Rd (CR 470) from N. Apopka Ave. to SR 44
Solicitation # 26-141
Citrus County, Florida, is soliciting bids for the milling and resurfacing of E. Gospel Island Road (CR 470) from N. Apopka Ave. to SR 44 under Solicitation Number 26-141, with a response deadline of September 15, 2026. The project, estimated at $4,142,947, involves removing approximately four inches of existing asphalt and placing a four-inch overlay using SP 12.5 and FC 12.5 asphalt mixtures with PG 76-22 polymer-modified binder, along with full restoration of pavement markings, signage, and road edge conditioning in compliance with FDOT Greenbook Design Standards, MUTCD, and AASHTO geometric standards. Work must be substantially completed within 90 days of the Notice to Proceed and finally completed within 120 days, under a unit-price contracting method with payment tied to verified quantities such as square yards milled and tons of asphalt placed. The county retains the right to inspect and accept work on-site, requiring Engineer Certification of Completion before formal acceptance. All bidders must operate as responsible entities with verified Unique Entity IDs, comply with strict cybersecurity, insurance, and ethical requirements, including mandatory $1,000,000 cyber insurance coverage maintained for three years post-completion, level II background checks for personnel, E-Verify usage for all employees, and full flow-down of debarment, EEO, and confidentiality clauses to all subcontractors. Insurance mandates include workers’ compensation and Longshoremen Act coverage, with certificates specifying 30-day cancellation notice and retroactive coverage aligned to contract start. Bidders must submit comprehensive documentation via the OpenGov portal, including certifications of insurance, qualifications, FDOT pre-qualification, asphalt mix design, and affidavits addressing human trafficking, conflict of interest, lobbying, and non-collusion. No size or socioeconomic status certifications are required, though DBE compliance is referenced in funding contexts. The award will go to the lowest responsive and responsible bidder whose proposal, evaluated holistically on qualifications, compliance, cost structure, and proposed subcontractor credibility, best serves the county’s interest, with no formal LPTA designation applied. The project is federally aided and governed by FDOT and FHWA guidelines, with all contractual obligations surviving completion, and no options or extensions provided.
Technical Services

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
B027-17 CDBG Sidewalks, Curbs and Ramps
Solicitation # B027-17
The contract B027-17 CDBG Sidewalks, Curbs and Ramps, issued by the Economic Development agency of Connecticut through the City of Meriden, will fund the construction of approximately 8,200 square feet of new sidewalk, 1,650 square feet of driveway apron, 1,620 linear feet of concrete curb, and 750 square feet of handicap-accessible ramps to improve pedestrian infrastructure and accessibility. The solicitation was posted on August 1, 2026, with responses due by August 25, 2026, and is classified as a public works project subject to Connecticut’s prevailing wage law under General Statutes Section 31-53, requiring all contractors and subcontractors to pay workers the legally mandated wage rates for the region and trade. In addition to wage compliance, all mechanics, laborers, and on-site workers must complete a 10-hour OSHA construction safety and health course, with proof of completion required for contract compliance, ensuring adherence to federal and state workplace safety standards. The project is funded through the Community Development Block Grant program and is subject to enforcement by the Connecticut Department of Labor, with noncompliance potentially resulting in contract termination or financial penalties. All work is to be performed within the City of Meriden, Connecticut, and contract inquiries should be directed to Susan Martel, Contract Specialist, or Rawle Dummett, Procurement officer, using the contact information provided.
Economic Development

POSTED

about 15 hours ago

DEADLINE

in 24 days
View Details