Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Wyoming was posted on October 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Nine Mile Road Project

Closed
9389698State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The contract involves reconstructing a segment of the 9-Mile Road, specifically approximately 7,550 feet of paved roadway from near the Point of Rocks interchange eastward to the first cattle guard. The scope includes complete removal of the existing road, earthwork grading, drainage improvements, shoulder widening, culvert replacement, aggregate base leveling, installation of hot plant mix pavement, cattle guards, fencing, signage, delineators, striping, rumble strips, and other necessary miscellaneous work to meet the project plans and specifications. The project aims for substantial completion by October 30, 2025. An additional bid item, contingent on available funds, proposes applying chip seal over 27,400 feet of roadway with overshoot. The project is managed by Sweetwater County, Wyoming, with a contract value estimated between 5 million and 10 million dollars. The solicitation was posted on October 30, 2024, with a response deadline of December 5, 2024. Interested parties can contact Gene Legerski via email or phone for further details. The project emphasizes comprehensive roadway reconstruction to enhance safety and durability along this section of 9-Mile Road, aligning with the specified plans and specifications.

General Info

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWyoming → Sweetwater County
Contacts1 person available
OfficeN/A

Full Description

Show more
The project consists of the reconstruction of Segment 1 (PT1) of the 9-Mile Road Reconstruction project, including approximately 7,550 feet of paved roadway (CR#15) from near the Point of Rocks interchange, east ~1.5 miles up to and including the first cattle guard. The project will include removal of the full road section, earthwork grading, drainage, shoulder widening, approaches, culvert replacement, aggregate base leveling, hot plant mix pavement, cattle guards, fencing, signs, delineators, striping, rumble strips, and associated miscellaneous work necessary to complete the project in accordance with the Plans and Specifications by the Substantial Completion date of October 30, 2025. A Bid Additive item is also proposed, pending remaining funds, for 27,400 feet of chip seal with overshoot

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS