Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Washington was posted on August 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Nisqually Loop Trail Interpretive Signage, City of Lakewood, WA #301.0048

Closed
301.0048State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter; structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and painting; and specialized electrical and piping installations. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of September 17, 2026. The project is partially funded by the Water Infrastructure Finance and Innovation Act administered by the EPA, making it subject to the American Iron and Steel provisions, Davis-Bacon Related Acts, and DBE Program requirements. Eligible bidders include DBE, SBE, MBE, WBE, SBRA, LSFA, and HUB Zone small businesses, with DBEs required to provide valid certification from recognized bodies such as the US EPA or SBA. Qualified respondents must hold a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the premiums.
Kiewit Infrastructure West Co.

POSTED

about 12 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and comprehensive revetment repairs involving clearing, grubbing, stone rework, and vegetation removal. The estimated contract value ranges between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a 10 percent price evaluation preference. Bidders must submit sealed physical bids by September 30, 2026, as electronic submissions are not permitted. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. The contract stipulates liquidated damages of 2,297 dollars per calendar day of delay and requires a third-party qualified surveyor for pre- and post-dredge multi-beam hydrographic surveys to verify final quantities.
Healy Tibbitts Builders, Inc.

POSTED

about 12 hours ago

DEADLINE

in 17 days
NAICS: 237990
New
Federal
Station Umpqua River Floating Dock Repair
Solicitation # 70Z03326QSEAT0015
The Department of Homeland Security, through the U.S. Coast Guard Base Seattle, is soliciting bids for a firm-fixed-price contract to repair the floating pier at Station Umpqua River in Winchester Bay, Oregon. The project involves providing all personnel, equipment, and tools to remove deteriorated wooden whalers and hardware and install three layers of 4 by 12 inch wooden whalers, through rods, roller hoops, and an egress ladder, while reinstalling ten existing cleats. The estimated period of performance is from September 21, 2026, to October 22, 2026, with a required completion date of October 14, 2026. This is a total small business set-aside under NAICS code 237990. A mandatory site visit is scheduled for August 27, 2026, at 10:00 AM, and interested offerors must submit their attendee lists by August 26, 2026. Proposals are due by September 14, 2026, at 3:00 PM PST and must be submitted via email to the contracting officer. Submissions are limited to six pages and must include a completed SF 1442, a detailed price breakdown covering mobilization, materials, and labor, and a technical proposal detailing the approach and project schedule. Evaluation will be based on technical capability, past performance, and price, with technical capability being the most significant factor. Awardees must be registered in the System for Award Management and comply with Davis-Bacon Act wage determinations for Douglas County, Oregon.
Base SEATTLE(00033)

POSTED

1 day ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The City of Lakewood is soliciting bids for comprehensive site improvements along the Nisqually Loop Trail in the southeast area of Fort Steilacoom Park at 8714 87th Ave SW, Lakewood, WA 98499. The scope of work includes temporary erosion control, tree protection, temporary fencing, clearing and grubbing, excavation, grading, pavement demolition, concrete paving, installation of site furnishings, fabrication and installation of interpretive signage and artwork, and full landscape restoration. The base bid covers all site preparation, fabrication, and installation of kiosk signs, wayfinding signs, and artistic elements, while additive bid alternates one through six include the addition of plant identification signs. Bidders must demonstrate relevant construction experience and submit a completed Construction Experience form as part of their proposal. A mandatory pre-bid meeting is scheduled for July 30 at 10:00 am at the park plaza near the intersection of Angle Ln SW and Waughop Lake Rd SW to provide site context and answer questions. The solicitation, numbered 301.0048, was posted on August 4, 2026, with responses due by 9:00 pm on August 6, 2026. Stacey Reding of the City of Lakewood is the point of contact for inquiries.

General Info

Lakewood seeks bids for Nisqually Loop Trail improvements including paving, signage, art, and landscaping with mandatory pre-bid meeting.

Agency

Washington → City of LakewoodView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Lakewood, WA, 98499, USA

Set-Aside

NONE

Documents

(197)

Specs - Page 134.jpg

JPG

Specs - Page 133.jpg

JPG

Specs - Page 52.jpg

JPG

Specs - Page 2.jpg

JPG

Specs - Page 31.jpg

JPG

Specs - Page 158.jpg

JPG

Specs - Page 148.jpg

JPG

Specs - Page 56.jpg

JPG

Specs - Page 49.jpg

JPG

Specs - Page 88.jpg

JPG

Plans - Page 18.jpg

JPG

Specs - Page 159.jpg

JPG

Specs - Page 41.jpg

JPG

Specs - Page 78.jpg

JPG

Specs - Page 141.jpg

JPG

Specs - Page 48.jpg

JPG

Specs - Page 64.jpg

JPG

Specs - Page 132.jpg

JPG

Specs - Page 81.jpg

JPG

Specs - Page 112.jpg

JPG

Specs - Page 58.jpg

JPG

Specs - Page 96.jpg

JPG

Addendum #2 - Page 8.jpg

JPG

Specs - Page 144.jpg

JPG

Specs - Page 116.jpg

JPG

Specs - Page 93.jpg

JPG

Specs - Page 102.jpg

JPG

Specs - Page 154.jpg

JPG

Plans - Page 16.jpg

JPG

Specs - Page 126.jpg

JPG

Specs - Page 84.jpg

JPG

Specs - Page 119.jpg

JPG

Plans - Page 17.jpg

JPG

Addendum #2 - Page 5.jpg

JPG

Specs - Page 77.jpg

JPG

Specs - Page 5.jpg

JPG

Specs - Page 101.jpg

JPG

Specs - Page 107.jpg

JPG

Specs - Page 105.jpg

JPG

Specs - Page 53.jpg

JPG

Specs - Page 143.jpg

JPG

Specs - Page 33.jpg

JPG

Plans - Page 9.jpg

JPG

Addendum #2 Plans - Page 2.jpg

JPG

Specs - Page 42.jpg

JPG

Specs - Page 83.jpg

JPG

Specs - Page 67.jpg

JPG

Specs - Page 15.jpg

JPG

Plans - Page 5.jpg

JPG

Specs - Page 137.jpg

JPG

Specs - Page 32.jpg

JPG

Specs - Page 17.jpg

JPG

Specs - Page 60.jpg

JPG

Specs - Page 22.jpg

JPG

Specs - Page 124.jpg

JPG

Specs - Page 103.jpg

JPG

Specs - Page 68.jpg

JPG

Addendum #1 - Page 1.jpg

JPG

Specs - Page 23.jpg

JPG

Plans - Page 1.jpg

JPG

Specs - Page 45.jpg

JPG

Specs - Page 157.jpg

JPG

Specs - Page 142.jpg

JPG

Plans - Page 2.jpg

JPG

Addendum #2 - Page 4.jpg

JPG

Specs - Page 9.jpg

JPG

Specs - Page 122.jpg

JPG

Specs - Page 125.jpg

JPG

Specs - Page 65.jpg

JPG

Specs - Page 91.jpg

JPG

Specs - Page 129.jpg

JPG

Plans - Page 11.jpg

JPG

Specs - Page 55.jpg

JPG

Specs - Page 80.jpg

JPG

Specs - Page 140.jpg

JPG

Specs - Page 75.jpg

JPG

Plans - Page 12.jpg

JPG

Specs - Page 74.jpg

JPG

Plans - Page 4.jpg

JPG

Specs - Page 155.jpg

JPG

Specs - Page 40.jpg

JPG

Specs - Page 147.jpg

JPG

Specs - Page 145.jpg

JPG

Specs - Page 36.jpg

JPG

Specs - Page 37.jpg

JPG

Addendum #1 Plans - Page 1.jpg

JPG

Specs - Page 149.jpg

JPG

Specs - Page 121.jpg

JPG

Specs - Page 76.jpg

JPG

Specs - Page 19.jpg

JPG

Specs - Page 25.jpg

JPG

Addendum #2 - Page 3.jpg

JPG

Specs - Page 113.jpg

JPG

Specs - Page 59.jpg

JPG

Specs - Page 43.jpg

JPG

Specs - Page 109.jpg

JPG

Specs - Page 62.jpg

JPG

Specs - Page 21.jpg

JPG

Specs - Page 35.jpg

JPG

Specs - Page 150.jpg

JPG

Plans - Page 14.jpg

JPG

Specs - Page 66.jpg

JPG

Specs - Page 27.jpg

JPG

Specs - Page 94.jpg

JPG

Specs - Page 118.jpg

JPG

Specs - Page 79.jpg

JPG

Plans - Page 22.jpg

JPG

Specs - Page 86.jpg

JPG

Specs - Page 13.jpg

JPG

Specs - Page 89.jpg

JPG

Addendum #1 - Page 2.jpg

JPG

Specs - Page 136.jpg

JPG

Specs - Page 4.jpg

JPG

Specs - Page 97.jpg

JPG

Specs - Page 18.jpg

JPG

Specs - Page 14.jpg

JPG

Plans - Page 20.jpg

JPG

Specs - Page 7.jpg

JPG

Addendum #2 - Page 1.jpg

JPG

Specs - Page 115.jpg

JPG

Specs - Page 98.jpg

JPG

Addendum #2 - Page 2.jpg

JPG

Specs - Page 30.jpg

JPG

Specs - Page 82.jpg

JPG

Addendum #2 Plans - Page 1.jpg

JPG

Specs - Page 104.jpg

JPG

Specs - Page 54.jpg

JPG

Specs - Page 130.jpg

JPG

Specs - Page 24.jpg

JPG

Specs - Page 34.jpg

JPG

Specs - Page 156.jpg

JPG

Specs - Page 70.jpg

JPG

Specs - Page 99.jpg

JPG

Specs - Page 12.jpg

JPG

Specs - Page 61.jpg

JPG

Plans - Page 15.jpg

JPG

Specs - Page 117.jpg

JPG

Specs - Page 123.jpg

JPG

Plans - Page 7.jpg

JPG

Specs - Page 139.jpg

JPG

Plans - Page 8.jpg

JPG

Specs - Page 127.jpg

JPG

Specs - Page 44.jpg

JPG

Plans - Page 13.jpg

JPG

Specs - Page 87.jpg

JPG

Addendum #1 Plans - Page 2.jpg

JPG

Specs - Page 10.jpg

JPG

Specs - Page 3.jpg

JPG

Specs - Page 153.jpg

JPG

Specs - Page 63.jpg

JPG

Specs - Page 110.jpg

JPG

Specs - Page 146.jpg

JPG

Specs - Page 151.jpg

JPG

Specs - Page 50.jpg

JPG

Specs - Page 135.jpg

JPG

Specs - Page 120.jpg

JPG

Specs - Page 8.jpg

JPG

Specs - Page 100.jpg

JPG

Specs - Page 46.jpg

JPG

Specs - Page 95.jpg

JPG

Specs - Page 1.jpg

JPG

Specs - Page 47.jpg

JPG

Specs - Page 92.jpg

JPG

Plans - Page 21.jpg

JPG

Plans - Page 3.jpg

JPG

Addendum #2 - Page 6.jpg

JPG

Specs - Page 28.jpg

JPG

Addendum #2 - Page 7.jpg

JPG

Addendum #1 Plans - Page 4.jpg

JPG

Specs - Page 11.jpg

JPG

Addendum #1 Plans - Page 3.jpg

JPG

Specs - Page 72.jpg

JPG

Specs - Page 114.jpg

JPG

Specs - Page 128.jpg

JPG

Specs - Page 6.jpg

JPG

Specs - Page 39.jpg

JPG

Specs - Page 90.jpg

JPG

Specs - Page 111.jpg

JPG

Specs - Page 57.jpg

JPG

Plans - Page 19.jpg

JPG

Specs - Page 138.jpg

JPG

Specs - Page 108.jpg

JPG

Plans - Page 10.jpg

JPG

Specs - Page 85.jpg

JPG

Specs - Page 29.jpg

JPG

Specs - Page 26.jpg

JPG

Specs - Page 71.jpg

JPG

Specs - Page 16.jpg

JPG

Specs - Page 73.jpg

JPG

Specs - Page 20.jpg

JPG

Specs - Page 131.jpg

JPG

Specs - Page 51.jpg

JPG

Plans - Page 6.jpg

JPG

Specs - Page 69.jpg

JPG

Specs - Page 38.jpg

JPG

Specs - Page 152.jpg

JPG

Specs - Page 106.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Lakewood
Contacts1 person available
OfficeN/A
Organization / Agency
Washington → City of Lakewood
View Agency Profile
Office AddressN/A

Interested Companies (9)

Show more
Northwest Cascade
Puyallup, WA
Northwest Precast
Puyallup, WA
NOVA Contracting
Littlerock, WA

See All 9 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Temporary erosion control, tree protection, temporary fencing, clearing/grubbing, excavation, grading, pavement demolition, concrete paving, site furnishing installation, fabrication & installation of interpretive signage and artwork, and landscape restoration for a loop trail in the SE area of Ft. Steilacoom Park located at 8714 87th Ave SW Lakewood, WA 98499. The base bid includes the complete site preparation, fabrication, and installation of kiosk signs, wayfinding signs, and artwork. Additive Bid Alternates One-Six (1-6) includes plant ID signs. Bidders shall be qualified for the type of work proposed. A Bidder's Construction Experience form is included in the Contract Provisions.
Pre-Bid Meeting: 7/30 @ 10:00 am, meet at the plaza located in the Ft Steilacoom Park at the intersection of Angle Ln SW and Waughop Lake Rd SW

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS