Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

OPS-2622 TEMPOARY BEACH BERMS AT HAMPTON BEACH STATE PARK

Active
dc94cca1-999f-473b-a0a9-55aab7167f67State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the construction of temporary beach berms adjacent to the seawall above the tide line along a specific stretch of Hampton Beach State Park, between Haverhill Ave. and just north of the Hampton Beach Meter Patrol Office. Contractors are required to use only the existing beach sand to form these berms, ensuring minimal environmental disruption and resource reuse. The work must commence on October 2, 2026, and be fully completed no later than 2:00 pm on October 15, 2026, leaving a narrow two-week window for execution. This initiative is managed by the New Hampshire Department of Natural & Cultural Resources under solicitation number dc94cca1-999f-473b-a0a9-55aab7167f67, with Edward Mussey designated as the primary point of contact for inquiries. The solicitation was posted on August 6, 2026, and responses were due by 6:00 pm on August 15, 2026, indicating a competitive bidding process was conducted well in advance of the construction timeline.

General Info

Construct temporary beach berms using existing sand at Hampton Beach State Park between October 2–15, 2026.

Agency

New Hampshire → Department Of Natural & Cultural ResourcesView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(2)

OPS-2622 TEMP BEACH BERMS 2026-SHEET 1.pdf

PDF

OPS-2622 Temporary Beach Berms Hampton Beach State Park Specifications

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNew Hampshire → Department Of Natural & Cultural Resources
Contacts1 person available
OfficeN/A
Organization / Agency
New Hampshire → Department Of Natural & Cultural Resources
View Agency Profile
Office AddressN/A
Contacts
Edward MusseyEdward Mussey

Full Description

Show more
This project involves creating temporary beach berms adjacent to the seawall above the tide line in the area between Haverhill Ave. and just north of the Hampton Beach Meter Patrol Office. Contractors will use the existing beach sand. The start date for the Project will be October 2, 2026 and the completion date will be no later than 2:00 pm on October 15, 2026.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Xpress Bus Wash Rehabilitation
Solicitation # 27-001
The Georgia Transportation Efficiency Authority is soliciting Design-Build proposals to rehabilitate and modernize the bus wash operation at the Xpress South Operations maintenance facility located at 5250 Frontage Road, Forest Park, Georgia. The project requires a comprehensive design and construction effort to expand the existing facility, separate engine steam-cleaning from body washing by constructing a new bay, replace the current system with a commercial-grade water reclamation setup that maximizes runoff capture and recycling, and install new bus wash equipment, engine steam-cleaning systems, bus lift equipment capable of handling 78,000 pounds at 69 inches in under a minute and a half, and supporting civil, structural, mechanical, electrical, and architectural improvements. The entire scope must meet strict performance metrics including washing at least fifty buses per day with a cycle time under six minutes per bus, and adhering to ADA accessibility, fire life safety codes, NEMA and UL standards, Buy America requirements, and sustainability best practices. The contract mandates compliance with federal transit regulations under FTA Circular 4220.1F and 2 CFR § 200, Georgia DOT construction standards, and incorporates a full suite of federal, state, and contractual clauses related to Davis-Bacon wages, DBE participation, drug-free workplace, sexual harassment prevention, and environmental standards for clean air and water. Proposals are due by September 24, 2026, and must be submitted in physical form with five copies and a USB drive containing the full electronic proposal, all marked for the attention of Procurement Manager Charnele Dobbins. Offerors must complete seventeen mandatory certifications including E-Verify compliance, suspension and debarment status, lobbying and anti-boycott affirmations, sales and use tax compliance, and Buy America certification. The selection will be based on a 100-point evaluation weighting proposed lump sum price at 20%, proposed equipment at 20%, experience of the architect/engineer at 15%, design-builder references and capabilities at 10% each, key personnel qualifications at 20%, and project management plan at 5%. The contract includes a $200,000 construction contingency allowance but no set ceiling, with all other line items subject to bid pricing. The contractor must provide 100% performance and payment bonds from Treasury-listed sureties with an A- rating or better, carry comprehensive insurance including workers’ compensation, employers’ liability, and a 2
Georgia Transportation Efficiency Authority

POSTED

about 14 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SLED
Welles Turner Memorial Library Site Improvements
Solicitation # GL-2027-06
The Town of Glastonbury is soliciting online bids for site improvements at the Welles Turner Memorial Library, specifically focusing on modifying the rear access drive, redesigning surrounding pedestrian walkways, and installing a traffic island. The base bid requires the traffic island to be constructed with colored stamped concrete, while an alternate bid option allows for granite pavers installed over a reinforced concrete base. All bids must be submitted through the secure e-Procurement portal at https://glastonburyct.bonfirehub.com/ under the solicitation number GL-2027-06, with a mandatory bid security in the form of a bid bond equal to at least 10% of the base bid amount. The successful bidder will be required to post performance and labor and material payment bonds for the full contract value to ensure project completion and payment of subcontractors and suppliers. The solicitation was posted on August 6, 2026, with a response deadline of August 27, 2026, at 3:00 PM. This procurement is managed by the Connecticut Department of Administrative Services under the agency name DAS Procurement, and the project location is within the town of Glastonbury, Connecticut. Primary contact for inquiries is Nicole Melquist, reachable by phone at 860-652-7588 or email at nicole.melquist@glastonbury-ct.gov. All bids must comply with the detailed requirements outlined in the Instructions to Bidders, and failure to meet bonding requirements will result in disqualification. The project aims to enhance safety, accessibility, and aesthetics around the library's rear entrance through coordinated infrastructure upgrades.
DAS Procurement

POSTED

about 16 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237990
New
International
Town of Canmore - Request for Proposal - NEIGHBOURHOOD DEEP UTILITY REPLACEMENT – PHASE 2 - INFILTRATION DRY POND CONSTRUCTION
Solicitation # AB-2026-05530
The Town of Canmore is soliciting proposals for the construction of an infiltration dry pond as part of Phase 2 of its Neighborhood Deep Utility Replacement project in South Canmore. The primary purpose of the dry pond is to manage dewatering during excavation activities for ongoing utility replacements over the multi-year project timeline. Work includes building an access road, removing trees, excavating the site, and installing the dry pond with geotextile fabric and 40mm washed rock as specified in the project drawings. Additional requirements include constructing a perimeter berm and installing fencing around the site to ensure safety and containment. The solicitation, identified as AB-2026-05530, was posted on August 6, 2026, with proposals due by August 27, 2026. The project is located in Canmore, Alberta, and all work must comply with the technical specifications outlined in the provided documentation. Proposals must be submitted through the Alberta Purchasing Connection platform, and inquiries should be directed to Mike Ford, Water Utility Supervisor, via phone at 403-679-5000 or email at mike.ford@canmore.ca. The contract does not specify any set-aside programs or NAICS codes, and the Town of Canmore is acting as both the issuing agency and the point of contact for procurement matters. Bidders are expected to demonstrate experience in site preparation, earthworks, stormwater management infrastructure, and compliance with local regulations related to environmental protection and site security. Successful proposals will align with the project’s operational needs and timeline, ensuring the dry pond is fully functional before major excavation phases commence.
Town of Canmore

POSTED

about 16 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237990
New
International
City of Lethbridge - Request for Proposal - Emergency Snow Removal Services
Solicitation # AB-2026-05542
The City of Lethbridge is seeking to pre-qualify companies capable of providing emergency snow removal services during extreme weather events when internal and external resources are insufficient to maintain required service levels. This solicitation, identified as AB-2026-05542, invites qualified vendors to submit proposals by the deadline of September 16, 2026, to be considered for inclusion on a list of pre-approved responders. The goal is to ensure rapid deployment of additional equipment and personnel to safeguard public safety, maintain critical infrastructure access, and uphold municipal operations during severe winter conditions. Eligible contractors must demonstrate proven capability, appropriate equipment, available staffing, and experience in municipal snow removal under high-pressure scenarios. Responses must align with the City’s operational needs and performance expectations, including timely mobilization, adherence to service standards, and compliance with local regulations. The contract does not guarantee work but establishes a pool of vetted vendors the City can call upon as needed during declared emergency events. Proposals will be evaluated based on factors such as capacity, reliability, geographic availability, and historical performance. All inquiries should be directed to Nicki Van Eck, the designated buyer, via the provided contact information. Interested parties are encouraged to review the full solicitation on the Alberta Purchasing website to understand requirements, evaluation criteria, and submission protocols.
City of Lethbridge

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from New Hampshire → Department Of Natural & Cultural Resources

Same awarding agency

NAICS: 237110
New
SLED
INVITATION TO BID FOR 2 WELL INSTALLATIONS AT LAKE SUNAPEE STATE BEACH AND MT. SUNAPEE TRAILS BUREAU WORKSHOP
Solicitation # b3f20496-218d-473c-8311-e714b9e7f240
The contract involves two separate but similar well installation projects at Lake Sunapee State Beach and the Mt. Sunapee Trails Bureau Workshop in Newbury, New Hampshire, both aimed at establishing reliable potable water sources. At Lake Sunapee State Beach, the work includes drilling a six-inch bedrock well with proper steel casing, sanitary seals, and grouting in compliance with Env Wq 400 standards, followed by well development to achieve NHDES turbidity requirements. In addition to the well, a complete atmospheric potable water storage tank system must be constructed and integrated, including foundation work, tank installation, venting, overflow protection, level controls, a booster pump system, and all associated piping and electrical connections. The Mt. Sunapee Trails Bureau Workshop project is focused exclusively on the installation of a new groundwater well using the same drilling, casing, grouting, and development standards, along with full pump, piping, and electrical connections. Both projects require comprehensive pumping and water quality testing post-installation, submission of all documentation to regulatory authorities, and restoration of all disturbed areas to their original condition. The solicitation is issued by the New Hampshire Department of Natural and Cultural Resources with a response deadline of August 21, 2026, and is open for bidding under solicitation number b3f20496-218d-473c-8311-e714b9e7f240. The project is managed by Seth Prescott, who serves as the primary point of contact for inquiries. Both installations are critical infrastructure upgrades intended to support public recreational facilities with safe, continuous drinking water services, ensuring compliance with state environmental and water quality regulations. The work demands expertise in well drilling, water system integration, environmental compliance, and site restoration, and all bids must demonstrate the ability to execute both projects to the required technical and regulatory standards.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 14 days
View Details