Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Northlands Job Corps Center /ETR was posted on September 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NJCC Bathroom Renovations for Buildings 17 & 18

Closed
njcc-bathroom-renovations-buildings-17-18

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the design-bid-build construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building located at the Washington National Army National Guard Unit Training and Equipment Site (UTES) Compound at Joint Base Lewis McChord, Washington. The project, with an estimated value between 1 million and 5 million dollars, involves site preparation, the purchase and erection of the steel building, installation of a concrete slab, and the implementation of underground utilities and stormwater mitigation via an infiltration pond. Specialized requirements include the installation of desiccant dehumidifying equipment, a dry pipe fire suppression system compliant with UFC 3-600-01 and NFPA 13, and the provision of conduit to support a future photovoltaic system. The government intends to award a Firm Fixed Price task order based on a balanced evaluation of technical capability and price. Technical submissions must include a task-oriented project schedule with a completion date no later than 360 days after the Notice to Proceed, as well as qualifications for key personnel. The period of performance requires work to commence within 10 calendar days of the Notice to Proceed and be completed within 365 calendar days. Contractual obligations include the submission of performance and payment bonds for awards exceeding 150,000 dollars, adherence to Davis-Bacon prevailing wage rates for Pierce County, and the use of the Wide Area Workflow (WAWF) system for all invoicing. Liquidated damages are established at 576.63 dollars for the first day and 427.99 dollars per day thereafter.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
South Concourse Evolution (SCE) Bid Package 3
Solicitation # south-concourse-evolution-sce-bid-package-3
Hensel Phelps, acting as the General Contractor/Construction Manager, is soliciting bids for Bid Package 3 of the South Concourse Evolution (SCE) project at the Seattle-Tacoma International Airport in Washington. This solicitation is set aside for Small Disadvantaged Businesses under NAICS code 236220. The scope of work is divided into several subsystems, including Phase 1 glass and aluminum systems, vertical transportation for Phase 1 and select Phase 2, and the demolition and installation of passenger loading bridges. Additionally, the package covers the build-out of main electrical rooms, encompassing masonry, drywall, doors, frames, hardware, and miscellaneous metals. Budget ranges for these subsystems vary, with the glass and aluminum systems estimated between 7.5 million and 10 million dollars and passenger loading bridges between 3 million and 4.5 million dollars. The project is governed by a Project Labor Agreement and requires all subcontracts to be executed on standard Hensel Phelps forms. Bidders must submit a bid bond using the provided forms and successful awardees must furnish Small Business Administration Form ID numbers. The solicitation encourages participation from small, disadvantaged, veteran-owned, service-disabled veteran-owned, and HUBZone businesses. All subcontractors are required to provide a workers compensation waiver of subrogation. The response deadline for this solicitation is October 14, 2026.
Hensel Phelps

POSTED

about 2 hours ago

DEADLINE

in 2 days
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. The project has a total duration of 915 calendar days and requires the existing plant to remain operational during the first two phases of construction. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Bids are due by October 28, 2026, following a mandatory in-person pre-bid meeting on October 5, 2026. Subcontractors must agree to the standard Overaa agreement without modification, provide a waiver of subrogation for workers compensation insurance, and utilize the Textura electronic invoicing system for payments.
C. Overaa & Co.

POSTED

about 2 hours ago

DEADLINE

in 16 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut, is a comprehensive construction effort managed by J & J Contractors, Inc. The scope of work involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine, along with a new Ordnance Operations building, Truck Inspection facility, and Sentry building. Key technical requirements include the installation of overhead cranes, intrusion detection systems, grounding and lightning protection, and specialized foundation work utilizing rigid inclusions and load transfer mats. The project also necessitates the demolition of 18 existing magazines and two buildings, as well as extensive sitework involving rock excavation, grading, and wetland mitigation. The contract spans a duration of 1828 calendar days and encompasses a wide array of trades, including demolition, abatement, structural steel, electrical utilities, and mechanical systems. Infrastructure improvements include the development of access roads, paved loading areas, and telecommunications systems. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026, and should contact Rahul Maheshwari to obtain the formal bid invitation and project documents.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project involves the complete renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes demolition of existing fixtures, installation of institutional-grade acrylic shower pans, vitreous China toilets, non-slip porcelain flooring, and LED lighting. To maintain center operations, contractors must execute the renovations using a phased sequence, completing one dormitory at a time. Qualified bidders must provide a detailed bid sheet with an itemized cost breakdown separating labor and materials, a proposed project schedule specifying calendar days and working hours, and current Vermont state professional licensing. Mandatory submission requirements include a Form W-9, certificates of insurance, and certifications regarding debarment and anti-lobbying. The award will be based on technical alignment with the scope of work and administrative completeness rather than the lowest bid alone. The contract requires strict adherence to ADA, OSHA, and NFPA Life Safety codes, as well as compliance with the Service Contract Act and federal prevailing wage laws. Final payment is contingent upon the submission of a signed punch list and applicable warranties.

General Info

Subcontract for phased bathroom renovations at Northlands Job Corps Center in Vergennes, Vermont.

Documents

2

NJCC RFQ for Bathroom Renovations Buildings 17 & 18

PDF, High priority: read this firstrfq
High

Vendor Setup Package and IRS Form W-9 for Northlands Job Corps Center

PDF, High priority: read this firstvendor-setup-package
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorthlands Job Corps Center /ETR
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
This is a Sub-Contract Opportunity at Northlands Job Corps Center in Vergennes Vermont. Accepting bids for bathroom renovations in two dormitory buildings. Specifics listed in attached RFQ along with walk through information.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS