Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from International Boundary And Water Commission: Us-Mexico was posted on September 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Nogales Headworks Rebuild

Closed
191BWC26R0019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The International Boundary and Water Commission is soliciting quotes for the urgent rehabilitation of the headworks at the Nogales International Wastewater Treatment Plant in Rio Rico, Arizona. This firm-fixed-price contract requires the purchase and in-kind replacement of OEM-specific equipment, including one Mensch FT-48 severe-duty bar screen, two Vulcan EWP 250/1000 washing presses with control panels, and two ESR stair-type fine screens. The scope of work encompasses the removal of existing equipment, installation of new components, integration with existing screw conveyors and SCADA systems, and the provision of associated wear parts, testing, commissioning, and training. Due to the need to match existing channel geometry and hydraulic profiles, this is a brand-name only, sole-source procurement. The project is driven by compelling urgency, as the facility is currently operating with only one functional coarse screen, risking environmental non-compliance. The period of performance is 120 calendar days after receipt of order, with an independent government estimate of 1,801,000 dollars. Evaluation will be based on a best-value tradeoff or lowest price technically acceptable basis, focusing on technical OEM authorization, price, and past performance. Offerors must provide a detailed price breakout by CLIN, a technical approach demonstrating OEM authorization, and a comprehensive delivery and installation schedule. All work must comply with strict safety standards, including the submission of a Job Safety Analysis, given the biohazard nature of the environment.

General Info

Sole-source purchase and installation of OEM headworks equipment for Nogales Wastewater Treatment Plant.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

AZ, 85648, USA

Set-Aside

NONE

Documents

4

191BWC26R0019 - RFQ for NFO Headworks

PDF, High priority: read this first30 pages · rfq
High

Brand Name Only J&A - NIWTP Headworks Rehabilitation

DOCX, High priority: read this first4 pages · justification-and-approval
High

FY264321003 Nogales Headworks CLIN Structure

DOCX, High priority: read this first1 page · sow
High

PWS FY25 Replacement of one Coarse Screen and two Washers

DOCX, Low priority20 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyInternational Boundary And Water Commission: Us-Mexico → Internat Boundary And Water Commission
Contacts1 person available
OfficeEl Paso, TX, 79902, USA
Office AddressEl Paso, TX, 79902, USA
Contacts
Seone Michael Jones

Full Description

Show more

THIS IS A COMBINED SYNOPSIS/SOLICITATION FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES


Prepared in accordance with the format in FAR Subpart 12.6; this announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (FAR 12.603)  


1. Solicitation Number: USIBWC-NIWTP-HEADWORKS-2026-RFQ


   Issue Date: [Insert date]


   Type: Request for Quotation (RFQ).  (FAR 12.603(c)(2))  


2. FAC:[Insert date Request for Quotation (RFQ).  (FAR 12(c)(2))  


The solicitation document and incorporated provisions/clauses are those in effect through Federal -9f4eb5】


3. Set-aside/Competition: BRAND NAME ONLY, SOLE SOURCE under FAR Subpart 13.5 (commercial items). OEM‑authorized sources may respond. Brand‑Name Justification is attached per FAR 5.102(a)(6); sole‑source justification prepared IAW FAR 13.501 using the 6.303‑2 format.  


4. NAICS / PSC:


   • NAICS: 333318 (Other Commercial and Service Industry Machinery Manufacturing) – Primary


   • PSC: 4630 (Sewage Treatment Equipment)


   • Additional PSC for installation services (if separately CLINed): Z1NE/Z2NE (Water & Sewage Facilities M&R/Repair)


   (Based on requirement content and PWS site‑work at NIWTP.) 


5. Description/Requirement:


   The U.S. Section, International Boundary and Water Commission (USIBWC), Nogales Field Office, requires purchase and installation of OEM-specific headworks equipment at the Nogales International Wastewater Treatment Plant (NIWTP), Rio Rico, AZ:


   • One FT‑48 Mensch Severe‑Duty Bar Screen (¾" spacing) (replace in kind)


   • Two Vulcan EWP 250/1000 Washing Presses with control panels (replace in kind)


   • Two ESR stair‑type fine screens (ESR‑34 or ESR‑28 per final PWS correction) with controls (replace in kind)


   • Associated OEM wear parts, removal, installation, testing, commissioning, and training


   Equipment must match existing NIWTP channel geometry (4’x7’), hydraulic profiles (~20 MGD/channel), mounting interfaces, discharge elevations, and NEMA 4X/NEMA 7 control requirements; must integrate with existing screw conveyors and SCADA.  


6. Location & Period of Performance:


   Place of Performance: NIWTP, 865 E. Frontage Rd., Rio Rico, AZ 85648. Period of Performance: 120 calendar days ARO. 


   FOB: Destination; Inspection/Acceptance: Destination (Commercial).  (FAR Subpart 12.4/12.301 framework)  


7. CLIN Structure (supply + install):


   CLIN 0001: FT‑48 Mensch Severe‑Duty Bar Screen, delivered & installed, OEM brand‑name


   CLIN 0002: Vulcan EWP 250/1000 Washing Press, delivered & installed (Qty 2), OEM brand‑name


   CLIN 0003: ESR stair‑type fine screen, delivered & installed (Qty 2), OEM brand‑name


   CLIN 0004: Associated OEM wear parts, controls, and integration


   CLIN 0005: Removal, installation labor, testing, commissioning, training


   CLIN 0006: O&M manuals and training materials (2 hard copies + electronic)


   (See PWS for dimensional, hydraulic, electrical, and acceptance requirements.)  


8. Site Visit (Optional but encouraged):


   Contact: Albert Flores, 520‑281‑1832; cell 520‑551‑6564; contact@example.gov


   PPE required; access may be affected by railroad operations; alternate dirt road available. 


9. Brand Name & Sole‑Source Basis:


   Replacement must be “in‑kind” to match NIWTP’s existing engineered channels, hydraulics, electrical panels, and SCADA. Non‑OEM substitutions would require channel demolition/reconstruction, conveyor replacement, panel rework, SCADA redesign, and extended downtime.  (NOI and J&A basis)  


10. Urgency:


   Due to unusual and compelling urgency, NIWTP currently operates with only one functional coarse screen/conveyor; remaining equipment is inoperable or removed. Loss of the remaining train risks environmental non‑compliance and service disruption. The Government would be seriously injured by delay; therefore, shortened response periods are used under FAR 5.203 for commercial items. If 6.302‑2 is invoked, synopsis timing may be bypassed per 5.202(a)(2). J&A will be posted within 30 days after award per 6.305(b).  


11. Instructions to Offerors:


   The provision at FAR 52.212‑1 applies; submit a quotation with:


   • Technical approach demonstrating OEM brand models and authorization


   • Price breakout by CLIN (lump sum allowed with schedule of values)


   • Delivery/installation schedule meeting 120‑day PoP


   • Warranty, training, and commissioning plan


   Include completed FAR 52.212‑3 (Reps & Certs).  


12. Evaluation (Streamlined; FAR 12.6 / 13.106):


   Best‑value tradeoff or LPTA at CO’s discretion; factors: Technical (brand‑name OEM fit & authorization), Price, Past Performance. Relative importance need not be stated when using Part 13; evaluation complies with FAR 12.6 and 13.106.  


13. Response Time & Submission:


   Quotes due: [Insert Date/Time, MST] (shortened timing permitted for commercial items under FAR 5.203(a); combined synopsis/solicitation used under FAR 12.603). Email: [KO email]. Subject: “NIWTP Headworks Rehabilitation – Brand Name Quote”.  


14. Attachments:


   • PWS – NIWTP Headworks Rehabilitation (May 2026)


   • Brand‑Name Justification (FAR 11.105)


   (Brand‑name justification posted with this solicitation per FAR 5.102(a)(6).)  


Section II  Solicitation Provisions (Commercial Items)


A. Core Commercial Provisions (Prescribed by FAR 12.301)


1) FAR 52.212-1, Instructions to Offerors—Commercial Products and Commercial Services (Sep 2023).  (12.301(b)(1); tailor per 12.302)  


2) FAR 52.212-3, Offeror Reps & Certs—Commercial Products and Commercial Services.  (12.301(b)(2))  


B. Brand Name Posting with Solicitation


• The brand‑name justification (Mensch FT‑48, Vulcan EWP 250/1000, ESR stair‑type screens) is posted with the solicitation per FAR 5.102(a)(6).  


C. Combined Synopsis/Solicitation Statement


• This is a combined synopsis/solicitation issued under FAR 12.603; shortened response times may be used for commercial items under FAR 5.203(a).  


D. Urgency Notice (if CO invokes 6.302-2)


• Unusual & Compelling Urgency: normal synopsis timing may be bypassed under FAR 5.202(a)(2); J&A posted within 30 days after award (FAR 6.305(b)).  


Section I Contract Clauses


A. Core Commercial Clauses (Prescribed by FAR 12.301)


1) FAR 52.212-4, Contract Terms and Conditions—Commercial Products and Commercial Services (Nov 2023).  (12.301(b)(3); tailor per 12.302/12.4)  


2) FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Products and Commercial Services (Mar 2026).  (12.301(b)(4); check boxes below)  


   The Contracting Officer checks the following:


   ☒ 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.  


   ☒ 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities.  


   ☒ 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Section 889).  


   ☒ 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations.  


   ☒ 52.232-40, Providing Accelerated Payments to Small Business Subcontractors.  


   ☒ 52.233-3, Protest After Award.  


   ☒ 52.233-4, Applicable Law for Breach of Contract Claim.  


B. Domestic Sourcing / Sanctions (Commercial Supplies & Install)


1) FAR 52.225-1, Buy American—Supplies (Oct 2022) (insert per FAR 25.1101(a)(1), as applicable to supply of OEM equipment delivered for use in U.S.).  


2) FAR 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021).  (insert per FAR 25.1103(a)) 


   [CO note: If CO determines the effort is “construction” per FAR 36, then use 52.225‑9 instead of 52.225‑1; otherwise keep 52.225‑1 for supply of commercial products.]  


C. Site/Installation Addenda (NIWTP work on Government installation)


1) FAR 52.228-5, Insurance—Work on a Government Installation (when work occurs at NIWTP).  (28.310) 


2) FAR 52.236-2, Differing Site Conditions (include only if CO treats work as construction under Part 36).  (36.502)  


More opportunities from International Boundary And Water Commission: Us-Mexico → Internat Boundary And Water Commission

Same awarding agency

NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Sewage Treatment Facilities

POSTED

9 days ago

DEADLINE

in 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS