Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Massachusetts was posted on July 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

North Eagle Street Sewer Improvements

Closed
BD-26-1745-ADM11-TH111-130844State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, identified by solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Filanc is soliciting quotes for a wide range of specialized scopes of work, including pipeline infrastructure such as pipe installation, valves, welding, and cathodic protection, as well as civil engineering tasks like paving, striping, and precast vaults. The project also requires technical and environmental services including surveying, videography, testing and inspections, settlement monitoring, SWPPP implementation, traffic control, and asbestos pipe demolition and removal. The engineer's estimate for this project is $36,000,000. This solicitation is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. Filanc is an equal opportunity employer and strongly encourages participation from small businesses, including minority-owned, women-owned, veteran-owned, and disadvantaged business enterprises. To support diversity, Filanc intends to negotiate with qualified SBE, MBE, and WBE firms and offers assistance with obtaining bonding, insurance, and equipment. Bids must be submitted by the deadline of 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications at no cost by contacting Julia Masaitis at bids@filanc.com or 760-941-7130.
Filanc

POSTED

about 15 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The North Eagle Street Sewer Improvements project, solicited under BD-26-1745-ADM11-TH111-130844 by the Town of Clarksburg, Massachusetts, seeks a qualified contractor to perform sanitary sewer enhancements along North Eagle Street. The scope includes installing new sanitary sewer manholes and connecting PVC piping to an existing gravity sewer system composed of 8-inch and 6-inch vitrified clay pipe, along with erosion protection, traffic control measures, and full surface restoration. All labor, materials, equipment, mobilization, and demobilization must be provided by the bidder. The work must comply with performance standards detailed in Appendix A (Drawings) and Appendix B (Technical Specifications), and must be coordinated continuously with the Town and its designated Engineer. The contractor is responsible for securing all necessary permits, including the Town Trench Opening Permit, and must submit insurance certificates within five calendar days of the Notice to Proceed, which will become part of the official contract documents. Payment bonds equaling 50% of the bid amount are required, along with compliance with Massachusetts General Laws, Chapter 149, Sections 26 to 27D, as outlined in Appendix E, which specifies state-mandated wage rates. The solicitation is structured as a low-bid process where the award will go to the responsive and responsible bidder submitting the lowest price, provided all requirements are met. The bid must be submitted by 2:00 PM on July 23, 2026, to the Town of Clarksburg at 111 River Road, Clarksburg, MA 01247, and must be signed in ink with proper authorization based on business structure. Bidding documents are accessible through the Tighe & Bond website after one-time registration, and all addenda will be distributed electronically. Invoicing is to be processed monthly, and the contractor’s work must be completed within the contract timelines specified in Appendix C, which also outlines the governing terms including insurance, bonds, and wage obligations. The estimated contract value is not disclosed, but line items for mobilization, traffic control, uniformed police services at $5,000, and monthly price adjustments for asphalt, diesel, and gasoline are included in the bid form structure. All materials and work must meet or exceed the minimum requirements of the request for bids, and the technical point of contact for inquiries is JMPopielarczyk@tig

General Info

Install sewer manholes and piping in Clarksburg, MA, with erosion control, traffic management, and surface restoration by August 3, 2026.

Agency

Massachusetts → ADM11 - AdministratorView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

River Road Clarksburg, MA, 01247, USA

Set-Aside

NONE

Documents

(18)

commbuys-source-page-BD-26-1745-ADM11-TH111-130844.html

HTML

commbuys-source-page-BD-26-1745-ADM11-TH111-130844.html

HTML

commbuys-source-page-BD-26-1745-ADM11-TH111-130844.html

HTML

North Eagle Street Sewer Improvements RFB Clarksburg MA 2026

PDFrfb

commbuys-source-page-BD-26-1745-ADM11-TH111-130844.html

HTML

commbuys-source-page-BD-26-1745-ADM11-TH111-130844.html

HTML

commbuys-source-page-BD-26-1745-ADM11-TH111-130844.html

HTML

commbuys-source-page-BD-26-1745-ADM11-TH111-130844.html

HTML

commbuys-source-page-BD-26-1745-ADM11-TH111-130844.html

HTML

commbuys-source-page-BD-26-1745-ADM11-TH111-130844.html

HTML

commbuys-source-page-BD-26-1745-ADM11-TH111-130844.html

HTML

commbuys-source-page-BD-26-1745-ADM11-TH111-130844.html

HTML

commbuys-source-page-BD-26-1745-ADM11-TH111-130844.html

HTML

commbuys-source-page-BD-26-1745-ADM11-TH111-130844.html

HTML

commbuys-source-page-BD-26-1745-ADM11-TH111-130844.html

HTML

commbuys-source-page-BD-26-1745-ADM11-TH111-130844.html

HTML

commbuys-source-page-BD-26-1745-ADM11-TH111-130844.html

HTML

commbuys-source-page-BD-26-1745-ADM11-TH111-130844.html

HTML

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → ADM11 - Administrator
Contacts1 person available
OfficeRiver Road Clarksburg, MA, 01247, USA
Organization / Agency
Massachusetts → ADM11 - Administrator
View Agency Profile
Office AddressRiver Road Clarksburg, MA, 01247, USA
Contacts
Ron BoucherPurchaser

Full Description

Show more
The work generally consists of the providing sanitary sewer manholes, connecting sanitary sewer piping, erosion protection, traffic control, and surface restoration.