Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on September 22, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

North End Culverts 2014, Kootenai NF, Rexford Ranger Distirict, IMAT

Awarded
AG-02RC-S-14-0154Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 11 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The USDA Forest Service awarded contract AG-02RC-S-14-0154 for the North End Culverts 2014 project located within the Rexford and Fortine Ranger Districts of the Kootenai National Forest. This HUBZone set-aside procurement focused on the installation of corrugated steel pipe culverts at Pink Creek and Gray Creek, including necessary riprap and aggregate work. The project required adherence to strict technical specifications for road and bridge construction, including specific requirements for mobilization, soil erosion control, and excavation. The award was granted to the lowest price technically acceptable offeror based on an evaluation of their technical approach, safety plans, and past performance. Performance of the work took place in Eureka, Montana, with a defined period of performance of 21 days from the Notice to Proceed. Contractors were required to comply with Montana heavy construction prevailing wage determinations and follow mandatory food storage and sanitation orders to reduce human-wildlife interactions within the national forest. Technical execution was guided by detailed engineering plans for both the Gray Creek and Pink Creek sites, which specified the use of 36-inch corrugated steel pipe and detailed requirements for traffic control and dewatering.

General Info

Contract Value

$21,788.95

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Rexford/Fortine Ranger Districts, EUREKA, MT, 59917, USA

Set-Aside

NONE

Award Issued Date

Documents

8

Amendment 001 to Solicitation AG-02RC-S-14-0145

DOCX, High priority: read this first2 pages · amendment
High

Forest Service Supplementary Specifications for Road and Bridge Construction

DOCX, High priority: read this first34 pages · specifications
High

General Decision MT140079 - Montana Heavy Construction Wage Determination

DOCX, High priority: read this first4 pages · wage-determination
High

Gray Creek Pipe Signed Plans

PDF, High priority: read this firstspecifications
High

Kootenai National Forest Food Storage and Sanitation Special Order

PDF, High priority: read this firstspecial-notice
High

North End Culverts 2014 - AG-02RC-S-14-0154

RTF, High priority: read this first15 pages · rfq
High

Pink Creek Culvert Replacement Plans

PDF, High priority: read this firstspecifications
High

USDA Forest Service Experience Questionnaire (AG-02RC-S-14-0154)

RTF, High priority: read this first1 page · past-performance
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service
Contacts1 person available
OfficeCOEUR D ALENE, ID, 83815, USA
Office AddressCOEUR D ALENE, ID, 83815, USA
Contacts

Full Description

Show more
North End Culverts 2014 C-1 - PROJECT DECRIPTION AND LOCATION (a) Project Description. The work at Pink Creek consists of removing an existing 48" CMP and placing a 71" X 47" CMP on Pink Creek Road, NFSR 7950. Riprap will be hauled and placed at inlet and outlet of pipe. Contractor will be allowed to work Monday thru Friday, with typical work hours between 7AM and 5PM. Contractor may ask for a variance in hours from the Contracting Officer. No work will be performed on Holidays. Contractor is required to control traffic per MUTCD Standards with flaggers when necessary. Campground and boatramp area will be closed during paving operations. Closures will only be permitted Monday through Thursday and for a maximum of 4 days. The work at Gray Creek consists of removing an existing 24" CMP and placing a 36" CMP on Gray Creek Road, NFSR 3500. Riprap will be hauled and placed at inlet and outlet of pipe. Contractor will be allowed to work Monday thru Friday, with typical work hours between 7AM and 5PM. Contractor may ask for a variance in hours from the Contracting Officer. No work will be performed on Holidays. Contractor is required to control traffic per MUTCD Standards with flaggers when necessary. Closures will only be permitted Monday through Thursday and for a maximum of 4 days. Project Location. Pink Creek - From Eureka Ranger Station travel south on highway 93 approximately 1.5 miles to the junction of Pinkham Creek Road, NFSR 856. Follow NFSR 856 approximately 17.5 miles to the junction with of Pink Creek Road NFSR 7950, follow NFSR 7950 approximately 1.3 miles to project site. Gray Creek is located approximately 35 miles South of Eureka, Montana. From Eureka Ranger Station travel south on highway 93 approximately 1.5 miles to the junction of Pinkham Road, NFSR 856. Follow NFSR 856 approximately 17.5 miles to the junction with of Pink Creek Road NFSR 7950, follow NFSR 7950 approximately 1.3 miles to project site. (b) Pre-Bid Conference and Tour. A pre-bid conference or tour will not be conducted. Prospective bidders are encouraged to visit the project site prior to submitting a bid. (c) Start Work. It is estimated that the Notice to Proceed will be issued about September 15, 2014. (d) Period of Performance. The Contractor shall complete the entire project ready for use not later than 21 days after issuance of Notice to Proceed. The time stated for completion shall include final cleanup of the premises. (f) Price Range. Below $25,000

More opportunities from Department Of Agriculture → USDA Forest Service

Same awarding agency

NAICS: 621111
New
Federal
Jacobs Creek JCC Medical Services
Solicitation # 1282A727Q0002
Solicitation 1282A727Q0002 is a Request for Quotation issued by the USDA Forest Service for on-site medical services at the Jacobs Creek Job Corps Center in Bristol, Tennessee. This firm-fixed-price contract is 100% set aside for small businesses under NAICS code 621111. The scope of work requires licensed medical professionals, such as Physicians, Nurse Practitioners, or Physician Assistants, to provide basic health services including examinations, assessments, treatment, immunizations, and prescription issuance. Services are typically required one to two days per week, Monday through Friday, from 8 am to 5 pm, totaling 400 hours per year. The contract structure consists of a base year running from January 11, 2027, to January 10, 2028, with four one-year options and a final six-month extension. Award will be based on best value, with technical capability and past performance weighted more heavily than price. To be considered responsive, offerors must submit a completed Quoter’s Questionnaire, current resumes for key personnel, unrestricted medical licenses, DEA registrations, and proof of medical liability insurance of at least 1 million dollars. All services must comply with OSHA, HIPAA, and American Medical Association guidelines. Invoices are to be submitted monthly via the Invoicing Processing Platform. Quotations must be submitted in Word or PDF format to the designated point of contact by 5:00 PM Eastern Time on November 17, 2026.
Offices of Physicians (except Mental Health Specialists)

POSTED

about 15 hours ago

DEADLINE

in 19 days
View Details
NAICS: 621111
New
Federal
Flatwoods JCC Medical Services
Solicitation # 1282A727Q0003
Solicitation 1282A727Q0003 is a Request for Quotation issued by the USDA Forest Service for on-site medical services at the Flatwoods Job Corps Center in Coeburn, Virginia. This contract is 100% set aside for small businesses under NAICS code 621111. The scope of work requires a Physician, Nurse Practitioner, or Physician Assistant to provide comprehensive healthcare for at-risk youth aged 16 to 24. Key responsibilities include conducting initial intake physical examinations, developing medical treatment plans, treating minor conditions and episodic illnesses, managing chronic care, issuing prescriptions and immunizations, and providing first aid and CPR. Services are to be performed on-site on a weekly basis, typically one to two days per week between 8:00 am and 5:00 pm, excluding government holidays. The contractor must adhere to HIPAA, OSHA, American Medical Association guidelines, and the Policy and Requirements Handbook 2.3 Health Services. All personnel must maintain active, unrestricted state licenses and required insurance, and may be subject to criminal background checks and drug testing. Invoices must be submitted monthly via the Invoicing Processing Platform (IPP) between the first and fifteenth of the following month. Quotations must include complete credentials, including resumes and licenses, to be considered responsive.
Offices of Physicians (except Mental Health Specialists)

POSTED

about 15 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237310
New
Federal
GAOA Brainard Lake Recreation Area Deferred Maintenance
Solicitation # 1240LT27Q0004
Solicitation 1240LT27Q0004 is a Request for Quotation issued by the USDA Forest Service for deferred maintenance and accessibility improvements at the Niwot Picnic Trailhead within the Brainard Lake Recreation Area near Ward, Colorado. This project, estimated between $100,000 and $250,000, is a 100% Total Small Business Set-Aside under NAICS 237310. The scope of work includes demolishing existing timber parking barriers and retaining walls, constructing new rock retaining walls and timber steps, creating accessible compacted aggregate trails, renovating and constructing picnic sites, and revegetating disturbed areas. The contractor must commence work within 10 calendar days of the notice to proceed and complete all tasks, including final cleanup, within 120 calendar days. The contract is awarded based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach and past performance on at least three similar projects completed within the last three years. Required submissions include a signed SF1442, a priced Schedule of Items, a technical proposal, and bid guarantees. Key compliance requirements include adherence to Davis-Bacon wage determinations, OSHA safety regulations, and MUTCD standards for signage. Performance and payment bonds are required, and the contractor must submit a company-approved accident prevention plan and evidence of insurance before beginning on-site work. Inspection and final acceptance are governed by FAR 52.246-12.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS