Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

North Fork American River Shaded Fuel Break Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The North Fork American River Shaded Fuel Break Project is a state-led wildland fire mitigation initiative managed by the California Department of Forestry and Fire Protection to reduce fuel loads and mitigate the risk of uncontrolled fires spreading from the North Fork American River Canyon into nearby communities. The project encompasses vegetation treatment along the canyon rim and adjacent roadways to create defensible space, enhance firefighter safety, and improve emergency access and evacuation routes, with the goal of protecting structures and private property beyond the minimum requirements of PRC 4291. Work will occur in Placer County near Colfax, primarily along Interstate 80 and Highway 174, across multiple assessor’s parcel numbers, with operations strictly governed by California Forest Practice Rules and CEQA guidelines. Performance is scheduled to extend throughout the project’s life, with no fixed end date, and is overseen by CAL FIRE Registered Professional Foresters or their designated representatives, who are also responsible for inspection and acceptance at the project site. Project activities are subject to stringent environmental and operational controls designed to minimize ecological disruption. Equipment use is restricted on slopes exceeding 30% for wheeled loaders and 65% for walking excavators, and operations are prohibited during saturated soil conditions to prevent erosion and compaction. Watercourse protection zones are enforced with buffer requirements based on watercourse classification, and treatment must avoid disturbing Class I and II watercourses. Cultural resource preservation mandates coordination with tribal governments and submission of archaeological surveys, while wildlife protections include seasonal buffers for nests of passerines, raptors, and golden eagles, and restrictions during key denning and nesting periods. Smoke Management Plans must be approved and implemented for any prescribed burns under PCAPCD Rule 303, and mitigation measures require immediate reporting of protected species, unstable slopes, or other environmental concerns. The project follows a Mitigated Negative Declaration under CEQA and is not subject to federal procurement clauses, as it is a state-funded environmental initiative with no formal contract value, federal acquisition regulations, or procurement-related evaluation factors outlined. Public input is solicited via email and mail during defined comment periods, with submissions directed to CAL FIRE’s Sacramento office.

General Info

California state project reduces wildfire fuel along North Fork American River, enhancing safety and compliance with environmental rules.

Agency

California Forestry and Fire Protection, Department of

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(7)

Notice of Determination for North Fork American River Shaded Fuel Break Project

PDFnotice-of-determination

Initial Study-Mitigated Negative Declaration for North Fork American River Shaded Fuel Break Project

PDFmitigated-negative-declaration

2025 Environmental Document Filing Fee Cash Receipt - North Fork American River Shaded Fuel Break Project

PDFreceipt

NOI North Fork American River Shaded Fuel Break Project 20250812

PDFnotice-of-intent

Initial Study-Mitigated Negative Declaration for North Fork American River Fuel Break Project

PDFmitigated-negative-declaration

NFARSFB_NOC_20250811 - Notice of Completion & Environmental Document Transmittal

PDFnotice-of-completion

NFARSFB Electronic CEQA Summary Form 20250811

PDFceqa-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Forestry and Fire Protection, Department of
Contacts3 people available
OfficeN/A
Organization / Agency
California Forestry and Fire Protection, Department of
Office AddressN/A
Contacts
CAL FIRE - Nevada Yuba Placer UnitForester II

Full Description

Show more
The project is intended to reduce the rate of spread and severity of uncontrolled vegetation fires and to provide locations where fire fighters can safely suppress active wildland fires and protect structures and private property damage. To achieve this objective, treatments are designed to create a zone of reduced fuel loading along the rim of the North Fork of the America River Canyon, allowing for a greater probability of preventing a fire originating in the canyon from spreading into adjacent communities. The project also proposes to treat fuels along roadways to provide safer evacuation corridors, improved emergency ingress/egress, and provide increased defensible space beyond PRC 4291 requirements around structures in the project area.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
PACP and MACP Pipeline Condition AssessmentThis contract requires the standardized coding and reporting of pipeline and manhole defects in accordance with NASSCO’s Pipeline Assessment Certification Program (PACP) and Manhole Assessment Certification Program (MACP) protocols. All condition assessments must follow these industry-recognized guidelines to ensure accurate, consistent, and defensible data collection for infrastructure evaluation and maintenance planning. The work is part of a larger infrastructure project under SAK Construction, LLC, and performance is expected to adhere to strict quality control measures aligned with national best practices for utility asset management. The solicitation is designated as a subcontract under the Small Business Administration’s set-aside programs, with eligibility limited to Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, Alaskan Native Corporations, Indian Tribes, and Disadvantaged Business Enterprises certified under the Department of Transportation’s DBE program. The NAICS code 541620 categorizes this as an engineering services contract, confirming the technical nature of the condition assessment work. The response deadline is September 10, 2026, and the performance location is tied to the SARP10 Humphreys Blvd CIPP project in Memphis, Tennessee, though specific site details are not fully defined in the provided data.
SAK Construction, LLC

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details