Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

North Fork American River Shaded Fuel Break Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The North Fork American River Shaded Fuel Break Project, managed by the California Department of Forestry and Fire Protection (CAL FIRE), is a wildfire mitigation initiative located in Placer County, California, specifically near Colfax. The project aims to reduce the spread and severity of uncontrolled vegetation fires by creating a zone of reduced fuel loading along the rim of the North Fork of the American River Canyon. Key objectives include protecting private property and structures, improving emergency ingress and egress, and establishing safer evacuation corridors along roadways by providing defensible space that exceeds PRC 4291 requirements. The project covers 6,051 acres and was approved on September 18, 2025, following a Mitigated Negative Declaration under the California Environmental Quality Act (CEQA) which determined that the project would not have significant environmental effects. The scope of work involves detailed vegetation treatments, including pruning conifers and hardwoods to a height of 8 feet or 50% live crown, hand thinning trees to achieve an average spacing of 17 feet, and removing standing dead trees over 12 inches DBH. Brush removal is required, with specific requirements to retain small patches of brush or thin shrubs to one every 30 feet. Debris between 1 and 14 inches in diameter must be chipped or pile burned, and all slash must be treated via lopping, mastication, or removal. Compliance with Public Resource Code Division 4, Chapter 6, sections 4427 through 4442 is mandatory for all equipment and tools used. Strict environmental and biological safeguards are integrated into the project. A Registered Professional Forester (RPF) or designee must traverse areas with a 30% slope to identify unstable soils before heavy machinery is used. Daily inspections by qualified biologists or RPFs are required in suitable habitats for the foothill yellow-legged frog, and botanical surveys must follow 2018 CDFW protocols, including a 25-foot exclusion zone around special status plants. Additionally, all personnel must undergo annual environmental education training. Cultural resource protections are in place, requiring field inspections by certified professionals and immediate cessation of work if human remains are discovered, per the California Health and Safety Code.

General Info

CAL FIRE wildfire mitigation project reducing fuel loading across 6,051 acres in Placer County.

Agency

California Forestry and Fire Protection, Department of

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Colfax, CA

Set-Aside

NONE

Documents

(7)

Notice of Determination for North Fork American River Shaded Fuel Break Project

PDFnotice-of-determination

Initial Study-Mitigated Negative Declaration for North Fork American River Shaded Fuel Break Project

PDFmitigated-negative-declaration

2025 Environmental Document Filing Fee Cash Receipt - North Fork American River Shaded Fuel Break Project

PDFreceipt

NOI North Fork American River Shaded Fuel Break Project 20250812

PDFnotice-of-intent

Initial Study-Mitigated Negative Declaration for North Fork American River Fuel Break Project

PDFmitigated-negative-declaration

NFARSFB_NOC_20250811 - Notice of Completion & Environmental Document Transmittal

PDFnotice-of-completion

NFARSFB Electronic CEQA Summary Form 20250811

PDFceqa-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Forestry and Fire Protection, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Forestry and Fire Protection, Department of
Office AddressN/A
Contacts

Full Description

Show more
The project is intended to reduce the rate of spread and severity of uncontrolled vegetation fires and to provide locations where fire fighters can safely suppress active wildland fires and protect structures and private property damage. To achieve this objective, treatments are designed to create a zone of reduced fuel loading along the rim of the North Fork of the America River Canyon, allowing for a greater probability of preventing a fire originating in the canyon from spreading into adjacent communities. The project also proposes to treat fuels along roadways to provide safer evacuation corridors, improved emergency ingress/egress, and provide increased defensible space beyond PRC 4291 requirements around structures in the project area.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
DEP-BWR-NOI-FY27-M36 Grant ANNOUNCEMENT ONLY
Solicitation # BD-27-1045-BWR00-BWR01-133675
The Massachusetts Department of Environmental Protection (MassDEP) is soliciting interest from Public Water Supplies and municipalities with Water Management Act (WMA) permits or registrations to receive a free American Water Works Association (AWWA) M36 water audit. The program is designed to help entities identify water loss objectives, particularly those failing to meet the Unaccounted-for Water (UAW) performance standard of 10 percent or less. Depending on previous audit history and data validity scores, eligible participants can receive either a Top-Down Audit or a Bottom-up Component Analysis. MassDEP will hire a private consulting firm through a separate public procurement process to conduct these audits. Selection is based on criteria including high UAW rates, WMA allocation status, recent improvement efforts, and permit status, with priority given to WMA permit holders and projects benefiting disadvantaged communities. Participation is limited to entities in compliance with the MBTA Communities Act Law. Selected applicants must provide a written commitment to have detailed system information for 2025 or 2026 available by January 15, 2027, and submit that data by February 2, 2027. Additionally, participants must commit significant personnel time as an in-kind match and be prepared to enter into a contract within 15 to 30 days of the grant award. Responses to this Request for Interest are due by October 21, 2026.
BWR00 - Bureau of Water Resources

POSTED

about 12 hours ago

DEADLINE

in 30 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS