This Solicitation opportunity from Nevada was posted on April 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract involves comprehensive renovation work at the Las Vegas Convention Center's North Hall Annex and Tunnel interiors, requiring all labor, equipment, and materials necessary for the project. The scope encompasses architectural, structural, and mechanical upgrades, with a strong focus on meticulous coordination, adherence to tolerances, and the submission of timely documentation throughout the construction process. The project is managed by the Las Vegas Convention and Visitors Authority, a Nevada-based organization, with a contract size estimated between 20 million and 50 million dollars. The work is scheduled to be completed within a framework that emphasizes compliance, quality, and efficiency, ensuring that the renovation meets the specified standards and project deadlines.
The solicitation for this project was posted on April 21, 2025, with a response deadline set for May 21, 2025. The primary point of contact is Rainee Steigerwald, reachable via email and phone. The project’s successful execution will require coordination among various stakeholders, adherence to construction tolerances, and the submission of all required documentation in a timely manner. The contract aims to modernize and improve the interior spaces of the North Hall Annex and Tunnel, supporting the continued operation and functionality of the Las Vegas Convention Center. Additional related procurement documents include various bids and proposals for infrastructure, equipment, and service contracts, reflecting the broader scope of municipal and organizational procurement activities in the region.
HighAI Summary for 02 Drawings 03 Architectural - Exterior Stair and Door Schedule: This document titled '02 Drawings 03 Architectural' includes architectural drawings related to the annex exterior stair and alternate stair levels 1 and 2. It also contains an existing door schedule for the annex and tunnel along with general notes. The drawings are prepared by KLAI JUBA WALD, an architectural and interior design firm based in Las Vegas, NV. The document serves as a critical technical specification for architectural design and construction detailing for the project.
DOCX
DOCX, High priority: read this firstsubcontractor-listing
HighAI Summary for 1st Tier Subcontractors Listing Form: This document is a 1st Tier Subcontractors Listing Form required by N.R.S. 338.141. It mandates bidders to submit names, work descriptions, Nevada State Contractor License Numbers, and payment amounts for first tier subcontractors exceeding $250,000 or 1% of the bid or $50,000, whichever is greater. Bidders self-performing more than 1% of the work must list themselves. The form must be submitted by the three low bidders within 2 hours after bid opening or the bid is non-responsive. It includes a table for listing subcontractors and instructions for compliance with Nevada Revised Statutes.
PDF
PDF, High priority: read this firstifb
HighAI Summary for 25-4878 CL-2025-393 North Hall Annex and Tunnel Renovation IFB: This Invitation for Bid (IFB) document, issued on 4/21/2025 by the Las Vegas Convention & Visitors Authority, solicits bids for the North Hall Annex and Tunnel Renovation at the Las Vegas Convention Center. The project involves comprehensive interior renovations including architectural, structural, mechanical, and MEPF system upgrades with emphasis on coordination, tolerance adherence, and timely submittals. Key dates include a mandatory job walk on 4/30/2025, question deadline on 5/9/2025, bid submission deadline on 5/21/2025, and award determination on 5/23/2025. The document includes detailed project descriptions, general requirements, and a list of required bid attachments such as subcontractor lists, affidavits, bonds, and schedules. The scope covers demolition, new construction, finishes, signage, lighting, and compliance with ADA and local codes.
DOCX
DOCX, High priority: read this firstsubcontractors-listing
HighAI Summary for 5% Subcontractors Listing Form: This document is a subcontractors listing form required to be submitted with a bid. It mandates the bidder to list all subcontractors who will perform work under the contract, including their names, Nevada contractor's license numbers, and minority/women-owned status. The form also requires the prime contractor to list their own name for the portion of work they will self-perform. The document references Nevada Revised Statute 338.141, which prohibits substituting named subcontractors after bid submission. It includes spaces for subcontractor details and signature fields for the contractor's authorized representative.
DOCX
DOCX, High priority: read this firstsubcontractors-listing
HighAI Summary for Subcontractors Listing Form for Nevada Bids: This document is a Subcontractors Listing Form required for the 3 low bidders in a Nevada public bid. It must be submitted within 2 hours after the bid opening time, or it will be rejected. The form lists subcontractors meeting Nevada Revised Statute 338.141 requirements, including their work description, name, contractor license number, and minority/women-owned status. It also includes a section for self-performing contractors. The form requires a signature, printed name, and company name of the bidder. Failure to submit indicates no qualifying subcontractors and prohibits substitution of named subcontractors.
PDF
PDF, Low priorityother
LowAI Summary for 02 Drawings 04 Structural: Document titled '02 Drawings 04 Structural' contains no readable content or detailed information. The file appears to be empty or corrupted with no extractable data.
PDF
PDF, Low priorityother
LowAI Summary for 02 Drawings 05 Mechanical: This document titled '02 Drawings 05 Mechanical' appears to be a set of mechanical drawings. However, the content is not available or readable, as the document consists only of page split markers without any actual text or images.
PDF
PDF, Low priorityother
LowAI Summary for 02 Drawings 06 Plumbing: The document titled '02 Drawings 06 Plumbing.pdf' appears to contain multiple pages but lacks readable content or specific information. It does not provide identifiable procurement details, specifications, or solicitation information.
PDF
PDF, Low priorityother
LowAI Summary for 02 Drawings 07 Electrical: The document titled '02 Drawings 07 Electrical.pdf' appears to be a set of electrical drawings. However, the content is not provided or is unreadable, consisting only of page split markers without any visible text or technical details.
PDF
PDF, Low priorityother
LowAI Summary for 02 Drawings 08 Low Voltage: The document titled '02 Drawings 08 Low Voltage.pdf' appears to be a set of drawings related to low voltage systems. However, the content is not readable or extractable from the provided data, as it consists only of page split markers without any visible text or technical details.
PDF
PDF, Low priorityother
LowAI Summary for 02 Drawings 09 Lighting: The document titled '02 Drawings 09 Lighting.pdf' appears to be a set of drawings related to lighting. However, the content is empty or unreadable, containing only page split markers without any substantive information.
PDF
PDF, Low priorityother
LowAI Summary for 02 Drawings 10 Audio Visual: The document titled '02 Drawings 10 Audio Visual' appears to be a set of drawings related to audio visual systems. However, the content is unreadable or missing, consisting only of page split markers without any visible text or technical details.
DOCX
DOCX, Low priorityaffidavit
LowAI Summary for Affidavit Pertaining to Preference Eligibility for Nevada Public Works Project: This affidavit certifies compliance with Nevada Revised Statutes (NRS) 338.147 and 338.0117 for eligibility to receive a bidding preference on a specified public works project in Nevada. The affiant, representing the bidder, affirms that at least 50% of workers and design professionals hold valid Nevada DMV-issued licenses or IDs, vehicles used are registered in Nevada, and payroll records will be maintained for inspection. Non-compliance may result in loss of bidding preference, penalties, and liquidated damages under Nevada law. The document includes spaces for project details, affiant's name, signature, and notarization.
PDF
PDF, Low priorityother
LowAI Summary for Engineering Office Map - LVCC Central Plant Access: This document provides directions for accessing the LVCC Central Plant via Desert Inn/Joe W. Brown Drive and Sahara Ave/Joe W. Brown. It includes instructions for turning at specific entrances and security booths, with guidance from guards on parking locations. The document is a simple map or directional guide without solicitation or contract details.
PDF
PDF
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyNevada → Las Vegas Convention and Visitors Authority
Provide all labor, equipment, and material for the renovation of the Las Vegas Convention Center (LVCC) North Hall Annex and Tunnel interiors. Work includes architectural, structural, and mechanical upgrades with a strong emphasis on coordination, tolerance adherence, and timely submittals throughout construction.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award