North Hollywood to Pasadena Bus Rapid Transit (BRT) Corridor Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The North Hollywood to Pasadena Bus Rapid Transit Corridor Project, managed by the Los Angeles County Metropolitan Transportation Authority, aims to deliver enhanced regional transit service through the implementation of key BRT features such as dedicated bus lanes, transit signal priority, and upgraded stations with all-door boarding. This initiative, previously approved with a certified Environmental Impact Report on April 28, 2022, is now moving forward with the establishment of its life-of-project budget, which does not alter the scope, design, or environmental determinations of the originally approved plan. No additional environmental review is required, as all physical activities proposed under this budget are fully encompassed within the scope of the certified EIR. The project is designed to improve mobility and connectivity across the corridor by providing faster, more reliable bus service, reducing travel times, and encouraging transit adoption. All work will be conducted within the boundaries and environmental conditions analyzed in the original review, ensuring compliance without further regulatory steps. The lead point of contact for this initiative is Scott Hartwell, Senior Manager of Transportation Planning, who can be reached through the provided email and phone for inquiries. The project remains aligned with broader regional transportation goals and is forecasted to advance under the agency’s authority without the need for new solicitations or competitive bidding at this stage.

General Info

North Hollywood to Pasadena BRT project advances with existing EIR, adding budget without changing scope or requiring new environmental review.

Agency

California → Los Angeles County Metropolitan Transportation Authority

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for North Hollywood to Pasadena Bus Rapid Transit Corridor Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Metropolitan Transportation Authority
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles County Metropolitan Transportation Authority
Office AddressN/A
Contacts
Scott HartwellSenior Manager, Transportation Planning

Full Description

Show more
The Metro Board previously certified the EIR and approved the NoHo to Pasadena BRT Project on April 28, 2022. The current action consists of the life-of-project budget for the Project. The current action does not modify the previously approved Project or authorize any physical activity beyond that analyzed in the certified EIR and no further environmental review is necessary. The Project would provide enhanced transit service and improve regional connectivity and mobility by implementing several key BRT elements, including dedicated bus lanes on city streets, transit signal priority (TSP), and enhanced stations with all-door boarding.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 18 hours ago

DEADLINE

in 24 days
View Details