The Marin Municipal Water District is implementing the North Marin Line Stabilization Project to replace two seismically unsound pipeline crossings of San Geronimo Creek in Lagunitas, California, with seismically resistant structures. The project involves replacing existing 34-inch American concrete cylinder pipe with new 36-inch welded steel pipe. One crossing will be replaced by approximately 1,700 feet of new pipeline within Sir Francis Drake Boulevard, while the other will utilize a 36-inch pipeline installed within a single span steel truss supported by drilled piers. The new trestle structures are designed to be at a higher elevation to clear the anticipated 100-year flood elevation. The scope also includes the removal of existing piles and pipelines in the creek and the restoration of any disturbed improvements. Construction is scheduled to occur over approximately 26 months, with primary work windows between August and November of each year. To protect the northern spotted owl nesting season, all work must be conducted between August 1 and January 31. The project has undergone extensive environmental review under CEQA, resulting in a Mitigated Negative Declaration to address potential impacts on biological resources, including Coho salmon and California freshwater shrimp. The contractor is responsible for site safety and OSHA-compliant shoring, while the project applicant must coordinate with the California Department of Fish and Wildlife for biological surveys. Technical specifications require strict adherence to ASTM and California test methods for soil compaction, density, and classification.

General Info

Marin Municipal Water District replacing two seismic pipeline crossings in Lagunitas over 26 months.

Agency

California → Marin Municipal Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Sir Francis Drake Boulevard between Lagunitas Road and Lower Peters Dam Road, Fairfax, CA, 94938

Set-Aside

NONE

Documents

(11)

North Marin Line Stabilization Project Addendum (Aug. 3, 2026)

PDF11 pagesaddendum

North Marin Line Stabilization Project Supplemental IS-MND Oct 2025

PDFsupplemental-initial-study-mnd

North Marin Line Stabilization Project Notice of Completion

PDF2 pagesnotice-of-completion

2025100945_CDFW_Comment on North Marin Line Stabilization Project IS/MND

PDF12 pagescomment-letter

Notice of Determination – North Marin Line Stabilization Project Addendum

PDF1 pageother

_Comment extension letter_20251105

ZIP

SCH #2025100945 North Marin Line Stabilization Project Comment Extension Memorandum

PDF1 pagememorandum

North Marin Line Stabilization Project SCH Summary Form

PDF2 pagesenvironmental-summary

North Marin Line Stabilization Project Supplemental Initial Study/Mitigated Negative Declaration Dec 2025

PDFenvironmental-document

Notice of Determination 21-2025-190 North Marin Line Stabilization Project

PDF4 pagesnotice-of-determination

NOA-NOI North Marin Line Stabilization Project Environmental Review

PDF3 pagesspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Marin Municipal Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Marin Municipal Water District
Office AddressN/A
Contacts
Carly BlanchardEnvironmental Planner

Interested Companies (1)

Show more
Environmental Science Associates
Los Angeles, CA

Full Description

Show more
Marin Water proposes to replace two seismically unsound San Geronimo Creek pipeline crossings of the North Marin Line (NML) with seismically resistant crossings. Marin Water would replace one pipeline crossing with approximately 1,700 feet of new pipeline within Sir Francis Drake Boulevard. The other pipeline crossing would be replaced with a 36-inch pipeline installed within a single span steel truss supported on drilled piers. The pipeline would emerge from the ground approximately 20-feet back of the creek’s top-of-bank and rise approximately 2 to 3-feet above the adjacent ground surface before crossing the creek. The Project also includes cutting and removing the existing pipeline and existing piles in San Geronimo Creek. The Project would be constructed between August and November 2026. The new pipeline segments would operate as the current NML does, providing water to Marin Water customers.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 10 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 10 hours ago

DEADLINE

in about 22 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS