Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on September 6, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

North Road at Wisteria Drive Intersection Improvements

Closed
PE-66785-NONST-2024-000000002State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 17 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The City of Snellville, Georgia, is soliciting sealed bids for the "North Road at Wisteria Drive Intersection Improvements" project, which involves comprehensive roadway enhancements including grading, erosion control, demolition, installation of signals, mast arms, luminaires, paving, curb and gutter, sidewalks, driveway reconstruction, striping, and the addition of turn lanes and widening as depicted in the construction plans. Bids must be submitted by 3:00 PM on October 8, 2024, at the City’s office, with late submissions not accepted. The bidding process includes a public opening of bids, with unofficial results posted on the city’s website. A non-mandatory pre-bid conference is scheduled for September 20, 2024, at 9:00 AM, and all interested bidders are encouraged to attend. The project requires a 5% bid bond, along with payment and performance bonds upon award. Bidders must complete and submit all required "Instruction to Bidder" and "Contract ITB" documents with their proposal. Questions regarding the bid documents are to be directed via email to the City Project Engineer, Larry Kaiser, PE, by September 27, 2024, with responses and any addenda posted on the city’s website by September 30, 2024. The project is estimated to be within a contract size range of $500,000 to $1,500,000, and interested parties can find additional details through the provided link.

General Info

Place of Performance

GA, USA

Set-Aside

NONE

Documents

3

City of Snellville North Road at Wisteria Drive Intersection Improvements IFB

PDF, High priority: read this firstifb
High

North Road at Wisteria Drive Intersection Improvement ITB

PDF, High priority: read this firstitb
High

202409_supportingdocs_PE-66785-NONST-2024-000000002-2024-09-06_12_49_70-1ff3c12f-dea0-434a-97ce-eab3307ae4dc.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 66785 SNELLVILLE, PE-66785-NONST-2024-000000002 to PE-66785-NONST-2024-000000002.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Tifton
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Tifton
Office AddressN/A

Full Description

Show more
The City of Snellville, Georgia (¿City¿) will receive sealed Bids for all material, labor, equipment, and services to successfully accomplish the following work: ¿North Road at Wisteria Drive Intersection Improvements¿. This work generally entails grading, erosion and sedimentation control, demolition, signal, mast arm and luminaire installations, paving, curb and gutter, sidewalks, driveway reconstruction, striping and all related materials for the addition of turn lanes and widening, as shown on the Construction Plans prepared by CHA dated September 8, 2024, and provided on the City website.
The City will receive bids until 3:00 PM; October 8, 2024 at City of Snellville, 2342 Oak Road, Snellville, Georgia 30078; ATTN: Matthew Pepper, City Manager. Bids received after that time and date will not be accepted.
Bids will be publicly opened. Unofficial bid results will be posted on the City web site. A non-mandatory pre-bid conference will be held at the 1st floor conference room (room 145), City of Snellville, GA; 2342 Oak Road, Snellville, GA 30078 on September 20, 2024 at 9:00 AM. All potential bidders are strongly encouraged to attend.
A 5% bid bond is required.
Payment and Performance Bonds will be required on this project.
¿Instruction to Bidder¿ and ¿Contract ITB¿ documents in the ITB must be completed and submitted with the bid.
All questions regarding the bid documents shall be made via email to City Project Engineer; Larry Kaiser, PE, Project Manager at contact@example.gov. The deadline to submit questions is no later than 5:00 PM; September 27, 2024. The City will post all ¿Response to Questions and/or Addenda¿, if applicable, on the City website; www.snellville.org, by no later than 5:00 PM, September 30, 2024.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS