Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

North-to-South Water Transfers Subsequent El R to the 2019 Long-Term Water Transfers Final ElR

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Luis & Delta-Mendota Water Authority is preparing a Subsequent Environmental Impact Report to reassess the environmental effects of proposed revisions to the North-to-South Water Transfers project, originally evaluated in the 2019 Long-Term Water Transfers Final EIR. This subsequent review is triggered by changes to the list of participating sellers and the volumes of water proposed for annual transfer, requiring analysis under California’s CEQA regulations to determine if the amended project introduces new or significantly more severe environmental impacts. The transfers, which occur on a yearly basis through voluntary agreements between sellers and buyers, aim to provide flexibility in water supply management during periods of drought or variability, primarily serving Central Valley Project-dependent areas. All proposed transfers must be reviewed and approved annually by the U.S. Bureau of Reclamation. The geographic scope spans multiple counties in California, including Alameda, Butte, Colusa, Contra Costa, El Dorado, Fresno, Glenn, Kings, Merced, Placer, Sacramento, Shasta, Stanislaus, Sutter, San Benito, Santa Clara, Tehama, and Yolo, with impacts tied to reservoirs and service areas involved in the transfers. The original 2019 EIR remains valid for unchanged aspects of the project, while this SEIR will solely focus on evaluating the environmental consequences of the updated transfer parameters to ensure regulatory compliance.

General Info

Revising annual North-to-South water transfers with new sellers and volumes, requiring CEQA environmental review across California counties.

Agency

California → San Luis and Delta Mendota Water Authority

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(3)

NSWT SEIR NOC - North-to-South Water Transfers Subsequent EIR

PDFnotice-of-completion

Notice of Preparation for North-to-South Water Transfers SEIR

PDFpresolicitation

NSWT SEIR SCH Summary Form 201101010

PDFenvironmental-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Luis and Delta Mendota Water Authority
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Luis and Delta Mendota Water Authority
Office AddressN/A
Contacts
Pablo ArroyaveCheif Operating Officer
Anusha KashyapProject Manager

Interested Companies (1)

Show more
CDM Smith
Edison, NJ

Full Description

Show more
The North-to-South Water Transfers Subsequent EIR (SEIR) will evaluate a range of alternatives for potential single-year water transfers over a multi-year period to facilitate responsible transfers when climate or water resource variability limit water supply availability in Central Valley Project-dependent areas. Transfers would occur through agreements between willing Sellers and Buyers. Each potential transfer must be proposed, reviewed, and approved by the U.S. Bureau of Reclamation on an annual basis. The project location includes the counties that overlap with the Buyers’ and Sellers’ Service Areas and at reservoirs used for release transfers. Affected counties include Alameda, Butte, Colusa, Contra Costa, El Dorado, Fresno, Glenn, Kings, Merced, Placer, Sacramento, Shasta, Stanislaus, Sutter, San Benito, Santa Clara, Tehama, and Yolo counties. The San Luis & Delta-Mendota Water Authority (SLDMWA) plans to prepare a SEIR to the 2019 Long-Term Water Transfers Final EIR (LTWT EIR). In April 2020, SLDMWA certified the LTWT EIR. Since certification, changes have been proposed to the project that warrant consideration in a subsequent EIR to assess the potential effects of the project with the proposed changes (consistent with California Public Resources Code, § 21166 and State CEQA Guidelines, 14 CCR § 15162). Specifically, the SEIR will consider a revised list of participating sellers and transfer quantities. The LTWT EIR retains its informational value regarding the environmental effects of the project. Preparation of the SEIR will evaluate the potential environmental effects of the project as revised and ensure that any new or substantially more severe environmental impacts are addressed through the CEQA process.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS