Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

NORTH VINEYARD STATION SPECIFIC PLAN

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves a 40.9-acre single-family residential development in Sacramento County, California, proposed by Towne Development of Sacramento, Inc., and regulated under Section 1602 of the Fish and Game Code through Streambed Alteration Agreement EPIMS Notification Number SAC-55933-R2. The development includes 159 residential lots organized into three villages, along with a park, open space area, stormwater basin, and a landscape corridor. Infrastructure improvements extend to adjacent offsite areas along Florin Road, specifically involving a minor widening of the road and installation of utilities. The project is governed by California Environmental Quality Act (CEQA) requirements, with environmental compliance documented through certification of mitigation measures from previously approved Environmental Impact Reports, and formal acceptance is processed by Sacramento County at its administrative office on Seventh Street in Sacramento. The lead agency for implementation is the Sacramento County Department of Transportation, with key personnel including Julie Newton as Environmental Coordinator and Harvey Tran as Senior Environmental Scientist from the California Department of Fish and Wildlife serving as contact points. No federal acquisition regulation clauses, pricing details, contract type, or offeror certifications are specified, as the documentation pertains primarily to environmental permitting and local infrastructure planning rather than formal federal contracting terms. Performance occurs within unincorporated Sacramento County, with no indication of formal delivery schedules, FOB terms, or invoicing systems, and all activities are subject to CEQA standards including Public Resources Code Sections 21152 and 21166 and CEQA Guidelines Section 15162.

General Info

40.9-acre residential development in Sacramento County with 159 lots, infrastructure, and CEQA-compliant environmental permits.

Agency

California → Sacramento County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Sacramento, CA

Set-Aside

NONE

Documents

(4)

PLER2025-00071 Notice of Determination for Waterman Road at CCTC Railroad Crossing

PDFnotice-of-determination

PLER2024-00030 Bradshaw at Elder Creek Intersection Project Notice of Determination

PDFnotice-of-determination

SAC-55933-R2 Notice of Determination for Sierra Gardens Project

PDFnotice-of-determination

PLER2023-00030 Bradshaw Road at Gerber Road Improvements Project Notice of Determination Addendum

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Sacramento County
Office AddressN/A
Contacts
Julie NewtonEnvironmental Coordinator

Full Description

Show more
Sacramento County Department of Transportation (SacDOT) is proposing to connect Waterman Road between Thimbleberry Drive and Ribera Street in the North Vineyard Station Specific Plan area in unincorporated Sacramento County. Waterman Road will be connected by a new at-grade crossing over the Central California Traction Company (CCTC) railroad crossing. Additionally, curb, gutter, sidewalk, raised landscape medians, and Class 2 bike lanes will be installed along the project alignment. The project is anticipated to take approximately seven months to be constructed, and construction activities will be restricted to between 7:00am and 7:00pm on weekdays. Nighttime construction is not anticipated and will only be performed upon approval from the County. Construction activities are anticipated to include excavation, grading, and paving. Standard construction equipment will be utilized and includes generators, compressors, backhoes, loaders, and a variety of trucks. Water facilities including water valves and drainage manholes are located along the project alignment and may require adjustment. Utility coordination will be an ongoing effort as the project progresses and conflicts are identified and resolved with the utility company. Construction of the project will require permanent right of way acquisition for public roadway public utility easements (PRPUE) and public utilities public facilities easements (PUPFE) from two parcels along Waterman Road. Approximately 2,648 square feet will be required from Assessor's Parcel Number (APN) 066-0210-045 for PUPFE and approximately 7,200 square feet will be required for PRPUE. Approximately 1,658 square feet will be required from APN 065-0052-003 for PRPUE. This may be altered during final design; however, no full property acquisitions would be required. Additionally, no demolition of existing structures within the acquisition areas would be required.

Similar Contracts

Same NAICS industry code