This Solicitation opportunity from Pennsylvania was posted on January 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Northampton Hills Water Main Extension (Contract 1-W-26) is a construction project for the Northampton, Bucks County, Municipal Authority in Pennsylvania. The scope of work involves the installation of an 8-inch water main, including ductile-iron and polyethylene piping, wet taps, gate valves, and associated appurtenances. Additionally, the project includes connecting adjacent residential properties to the public water system through the installation of water main taps, curb stops, meters, and interior plumbing work. The final number of residential connections is contingent upon the acceptance of offers provided to residents by the United States Navy and the Municipal Authority.
Technical requirements mandate adherence to OSHA trenching standards, AWWA and ASTM material specifications, and PennDOT Publication 408. Key deliverables include a leak-free operational system verified by pressure testing, record drawings, and maintenance data. Contractors must provide pre-construction video documentation and follow strict restoration protocols for both paved and unimproved areas. Site management is subject to local noise and nuisance ordinances, and materials must be stored according to specific cleanliness and protection standards.
The solicitation was posted on January 14, 2026, with a response deadline of February 18, 2026. Pricing is structured on a unit-price basis for items such as HDPE water main, K-copper service pipe, and erosion control, with final payment based on actual measured quantities verified by the Engineer. The project has undergone several revisions via addenda, including adjustments to bid item quantities, the addition of private property photo logs, and updated test hole data.
HighAI Summary for 2025 Churchville Manor Public Water Project - Technical Specifications: Technical specifications and special provisions for the 2025 Churchville Manor Public Water Project. The document outlines requirements for water main extensions, residential services, OSHA trenching safety, pre-construction video documentation, restoration timelines, and compliance with the Northampton Township Nuisance Ordinance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 2025 Hillside Manor Public Water Project - Technical Specifications: Technical specifications and special provisions for the 2025 Hillside Manor Public Water Project. The document outlines requirements for water main extension, residential services, OSHA-compliant trenching, pre-construction video documentation, restoration timelines, and site management constraints including nuisance ordinances and material storage limits.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Bulletin #1 - Standard Construction Detail #4-16: This document is identified as Bulletin #1 and contains technical construction specifications, specifically Standard Construction Detail #4-16 regarding Filter Bag Inlet Protection - Type C Inlet, including warnings against creating paved roadways where ponding may cause traffic hazards.
PDF
PDF, High priority: read this firstbid-tabulation
HighAI Summary for Bulletin #2 - Pricing Section (BT-28EU): A pricing comparison table (bid tabulation) for project BT-28EU, detailing unit and total costs for public improvement items such as water main installation, fire hydrants, and restoration. It compares bids from multiple vendors including C&R Directional Boring, DOLI Construction, Joao & Bradley Construction, Pact One LLC, Road-Con, and Twining Construction.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract 1-W-25: Bulletin No. 1 - 2025 Churchville Manor Public Water Project: Addendum No. 1 issued July 18, 2025, for the 2025 Churchville Manor Public Water Project (Contract No. 1-W-25). This bulletin provides critical revisions to the Form of Bid (pages C-4 and C-5), updates to PennBid QA/QC item names and quantities, and replaces Specification Section 01250 with 01250A. Key changes include revised item descriptions, updated units of measure (changing some items to lump sum), and clarifications on measurement and payment for various water main construction items.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract 1-W-25 Bulletin No. 2 - 2025 Churchville Manor Public Water Project: Addendum No. 2 issued on August 7, 2025, for the 2025 Churchville Manor Public Water Project (Contract No. 1-W-25). This document provides revisions to front-end documents, updates to approved material data sheets in Appendix 6, and adds new appendices regarding tree removal exhibits (App 13), private property photo logs/permit samples (App 14), and geotechnical sub-surface information (App 15). It also includes project updates regarding resident connection offers and the status of PennDOT and BCCD permits.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract 1-W-26: Addendum No. 2 - Northampton Hills Water Main Extension: Bulletin No. 2, issued February 06, 2026, for the Northampton Hills Water Main Extension (Contract No. 1-W-26). This addendum includes revisions to the Form of Bid (Item #1-7 quantity increase and Item #1-33 renaming), updates to the Plan Set and Erosion & Sediment Control plans, replacements of Front End and Technical Specification documents, and the addition of Appendix 20 (Test Hole Map and Data Sheets).
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Contract 1-W-26: Northampton Hills Water Main Extension: A comprehensive solicitation package dated January 2026 for the Northampton Hills Water Main Extension (Contract No. 1-W-26). The document includes a table of contents for the full bid package, encompassing instructions to bidders, form of bid, general and special conditions, construction specifications (Divisions 1 and 2), and a detailed list of construction documents/drawings.
XLSX
XLSX, High priority: read this firstamendment
HighAI Summary for Contract 1-W-26: Northampton Hills Water Main Extension - Addendum No. 1: Addendum No. 1 issued February 02, 2026, for the Northampton Hills Water Main Extension (Contract No. 1-W-26). This document outlines significant revisions to the bid form, including adjusted quantities for items #3-2 to #3-18 and the removal of bid items #4-1 to #4-18. It also details extensive page replacements in the Front End Documents, Technical Specifications, and Appendices, including the addition of Appendix 19 regarding private property photo logs and permit samples.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract 2-W-25: Bulletin No. 1 - 2025 Hillside Manor Public Water Project: Issued July 18, 2025, Bulletin No. 1 (Addendum 1) for the Hillside Manor Public Water Project (Contract 2-W-25) provides critical revisions to the Form of Bid and technical specifications. Key changes include QA/QC revisions to bid item names and quantities, replacement of pages C-4 and C-5 with C-4A and C-5A, and updates to Specification Sections 01001 and 01250. Specific modifications address item descriptions, units of measure (changing some items to lump sum), and the inclusion of flowable fill as an alternate encasement material.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Contract No. 1-W-25: 2025 Churchville Manor Public Water Project: This document is a comprehensive invitation to bid (ITB) package for the 2025 Churchville Manor Public Water Project (Contract No. 1-W-25) for the Northampton, Bucks County, Municipal Authority, dated July 2025. It includes the table of contents and indices for the advertisement, instructions to bidders, general and special conditions, construction specifications (covering site work, utility excavation, and water pipe installation), form of agreement, contract bonds, and a detailed list of construction drawings and plans.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Contract No. 2-W-25: 2025 Hillside Manor Public Water Project: A comprehensive solicitation package dated July 2025 for the 2025 Hillside Manor Public Water Project (Contract No. 2-W-25) for the Northampton, Bucks County, Municipal Authority. The document includes a table of contents for the full bid set, covering instructions to bidders, general and special conditions, construction specifications (site work, water pipe materials, and installation), form of agreement, bond requirements, and a detailed list of construction drawings and appendices.
PDF
PDF, High priority: read this firstbid-tabulation
HighAI Summary for NHMAX25007 - Northampton Hills Water Main Extension Bid Tab: Bid tabulation for Project NHMAX25007 (Contract 1-W-26), Northampton Hills Water Main Extension. The document lists detailed unit prices and total costs for base bid items (public improvements and private property services) submitted by five bidders: DOLI Construction Corporation, Joao & Bradley Construction Co., Inc., Wexcon, Inc., RIII Construction Inc, and Ankiewicz Enterprises Inc. Bids were received via PennBid on February 18, 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Northampton Hills Water Main Extension - Front End Documents: Technical specifications and construction details for the Northampton Hills Water Main Extension project, including concrete volume requirements for pipe sizes and standard construction details for filter bag inlet protection (Type M Inlet).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Northampton Hills Water Main Extension - Special Provisions: This document contains the Special Provisions (Section 01001) for the Northampton Hills Water Main Extension project. It outlines technical requirements for the installation of 8-inch water mains, residential connections, OSHA trenching standards, pre-construction video requirements, restoration protocols, and site constraints including noise ordinances and material storage limits.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseAwarded
Posted
Solicitation
Notice updated
Solicitation number changed from Northampton, Bucks County, Municipal Authority to 217388. The notice description changed.
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Ref. #: Northampton, Bucks County, Municipal Authority This Contract includes the construction of a water main extension and the connection of water services to adjacent residential properties. The work shall include the installation of 8-inch water main, water main taps, curb stops, residential connections to public water, interior plumbing work, and services with meters and all appurtenances to the Northampton Hills subdivision and additional residences. The actual number of connections to the public water system to be made is dependent upon the acceptance of connection offers provided by the United States Navy to residents in addition to acceptance of connection offers provided by the Northampton, Bucks County, Municipal Authority.
More opportunities from Pennsylvania → Bucks County